Industries / Construction and property / Commercial and residential construction
Steel erection
Steel erection is the trade that assembles a building's structural steel frame on site: it receives the fabricated columns, beams, trusses and deck, lifts each piece into place, connects it with bolts or welds, and keeps the part-built frame and its crews from falling.
1885
The Home Insurance Building in Chicago, designed by William Le Baron Jenney, was completed as a 10-story office building whose metal frame, not its walls, carried its weight. TIME wrote in 1958 that it used wrought-iron beams to the sixth floor and the then new Bessemer steel beams above; the Chicago Architecture Center calls the frame cast iron.
34
Milestones achieved across 6 domains.
9
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
The Home Insurance Building in Chicago, finished in 1885, stood on a metal frame that carried its floors and walls, the kind of skeleton steel-framed buildings still use. Crews raised the pieces with derricks standing on the frame itself, and four-man gangs joined them with red-hot rivets until high-strength bolts, tightened by turning the nut a set amount, took over from the 1950s. Mohawk ironworkers from Kahnawake, near Montreal, have worked on high steel since the 1880s, and after 33 of them died on the Quebec Bridge in 1907 their community spread its crews across many jobs.
Where it stands
In Britain steel took 46.7% of the market for building frames in 2024, and 855,000 tonnes of it were erected, by the count of a survey for the British Constructional Steelwork Association (BCSA). China's steel construction society counted 112 million tonnes of structural steel processed in 2023, as cited by the broker Guojin Securities. Pieces are now drawn, cut and drilled from one 3D model, and some Japanese builders weld columns on site with robots, but connecting, bolting and decking are still done by ironworkers standing on the frame; in one study of 166 US steel erection deaths from 2000 to 2005, falls caused 125.
What is open
Most checks on a steel job are still made by eye: the paint marks that show a nut was turned far enough, the piece marks on steel waiting in the yard, the lean of each column, and whether a part-built frame still has the bracing it needs. The open jobs here are tests and tools that work at a desk or on the ground: photo checks for bolts and piece marks, open stage-by-stage stability checks, a model checker for OSHA's erection rules, wind tests of loose deck, a slip test that gives the same number twice, and bench rigs and test courses for robots that fit beams and fasten deck. None of them needs anyone to work at height.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Detailing and fabrication
Detailing turns the engineer's design into drawings and machine files for every piece of steel, and fabrication cuts, drills and welds those pieces in a shop before they go to site.
7 · 2 · 2
Last achievedCracks from the cutting torch2018
Watch forRobot fitting and welding, timed
2
openDelivery and sequence
Delivery and sequence is the planning that brings each piece to site when the crew needs it and sets the order in which pieces go up, so that a partly built frame stays standing.
4 · 1 · 2
Last achievedBrace unbolted for guardrails2019
Watch forStructural progress read from photos
2
openLifting and placing
Lifting and placing is raising each column, beam and truss to its place in the frame and holding it there until it is connected.
4 · 1 · 2
Last achievedA roof lifted by computer2007
Watch forPicks logged at the hook
2
openBolting and welding
Bolting and welding is making the permanent connections between pieces once they are in place, first by hot rivets and now by high-strength bolts and field welds.
5 · 2 · 2
Last achievedRobots weld columns on site1999
Watch forFully automatic column welding
2
openDecking
Decking is laying the ribbed steel sheets that become a building's floors and roof, fastening them to the frame and, for composite floors, welding the steel studs that tie the beams to the concrete poured on top.
7 · 2 · 2
Last achievedDeck nails tested in wind2022
Watch forA carriage that fastens deck
2
openSafety at height
This is the work of keeping erectors, the ironworkers who connect, bolt and deck a frame, from falling while it still has no floors or walls.
7 · 1 · 2
Last achievedJapan requires full harnesses2019
Watch forCameras judge hook height
2
open
Advances to build with
3 research notes

NVIDIA GR00T 2
Five demonstrations per task
By NVIDIA's own test, its robot model GR00T 2 averages 95% success after five demonstrations of a task, on 50 tasks picked from those it learns that way.

AGIBOT GO-3 Preview
First on three benchmarks
AGIBOT says its GO-3 robot software is first on three tests, and on the two whose tables could be read it leads one by its own count and is second on the other.

Inkling 2 Small
Checked without being asked
The maker of Inkling 2 Small, Thinking Machines, says the AI model checks its work without being asked, a habit that no published test measures.
Open in steel erection
3 of 12 open deliverables
Open · Detailing and fabrication
Donor steel read from drawings
A program that reads the archived shop and erection drawings of a steel-framed building due for demolition and writes a reuse inventory: each member's section, length, holes and copes, and where it sits in the frame. It is scored against a hand count of the same drawings.
Built with what exists
Scanned drawing sets from a city archive, a university collection or a demolition contractor; a vision-language model that reads drawings and tables (see the Note "Seven more flagged"); IfcOpenShell to write the inventory as an IFC model; Python.
Open · Delivery and sequence
Piece marks read by camera
A phone app that photographs steel members lying on dunnage in a yard or on a delivery trailer, reads the painted, stenciled or hand-written piece mark on each, and ticks it off against the piece list for the next erection sequence, flagging any piece that is missing before the crane is booked.
Built with what exists
A phone camera; an open text-recognition model such as PaddleOCR, or a vision-language model; the piece list exported from the detailing model as a spreadsheet; Python.
Open · Lifting and placing
A robot fits the beam
A bench-scale rig on which a robot arm guides a hanging scale beam onto a column's bolted shear tab (the plate the beam end bolts to) until a drift pin, the tapered pin ironworkers use to line up holes, drops through both holes, and then puts in the first bolt. A person only starts each attempt. The rig stays under 2 m tall and the beam under 5 kg, so no one works at height and no crane is used.
Built with what exists
Hugging Face's LeRobot software for recording and training (see the Note "No download"); a small cobot arm or a low-cost SO-101 arm; two USB cameras; an open robot model such as NVIDIA's GR00T 2, which its maker says learns a task from a few demonstrations (see the Note "Five demonstrations per task"); aluminum angle and plate; a small chain hoist on a 2 m gantry.