BRENNEN

Industries / Construction and property / Commercial and residential construction / Steel erection

Lifting and placing

Lifting and placing is raising each column, beam and truss to its place in the frame and holding it there until it is connected.

4

Milestones achieved, from 1907 to 2007.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1907

    Derricks ride the frame

    Before tower cranes, steel was raised by derricks set on the building itself. A guy derrick is a mast held upright by steel guy wires, with a boom that swings and raises loads on wire rope and pulleys, the same principle as a mast on a sailing ship. Riggers erected the derricks, and a 1907 photograph in NYU's labor archives shows five ironworkers making fast a guy wire for a derrick about to raise iron on the tower of the Singer Building in Lower Manhattan.

    laborarts.orglaborarts.org

    Credit

    New York's riggers and ironworkers; photograph in the Robert F. Wagner Labor Archives, NYU

  2. 1978

    Hartford's roof falls

    The space-frame roof of the Hartford Civic Center in Connecticut was assembled at ground level and then lifted onto its supporting pylons. An inspection agency found larger deflections (sag) at some joints than the computer model predicted while the frame was still on the ground, and after the lift the largest deflection was twice the prediction; the design engineers took no action. On 18 January 1978, when the arena was about three years old, the roof collapsed under wet snow, bringing down some 1,400 tons of steel and rubble a few hours after 5,000 people had left a basketball game. An investigation found some top-layer members overloaded by more than 800%.

    LessonDeflections measured during erection that do not match the design are a warning to act on before the frame is finished.

    asce.org

    Credit

    a failure; account by Tara Hoke in ASCE's Civil Engineering, 2020

  3. 1993

    A factory on the roof

    Shimizu's SMART system built an office building in Nagoya, Japan, from fall 1991 to fall 1993 inside a covered "factory" on top of the rising frame. The top floor (a "hat truss") was assembled on the ground, then the 1,200-ton working platform was jacked up one story, about 4 m, in 1.5 hours each time; overhead hoists placed columns and beams, a laser system measured each column's lean, and robots welded the joints, with one operator in a control room. Shimizu put the labor saving at about 30% for the whole project and 50% for the work SMART did. Brian Potter's 2021 review found that Obayashi, Taisei, Kajima, Fujita and others built similar systems, used at least 60 times by one count, and that none appears to be in use now.

    LessonA month or more of setup and a long payback meant on-site factories paid off only on large, repetitive towers.

    iaarc.orgconstruction-physics.com

    Credit

    Shimizu Corporation (J. Maeda); Obayashi (ABCS, Big Canopy), Taisei (T-Up), Kajima (AMURAD)

  4. 2007

    A roof lifted by computer

    The steel roof of London's O2 Arena, 2,800 tons of steel spanning 421 ft (128 m), was built complete at ground level, with catwalks, ducts and cladding, then raised 88 ft (27 m) in two stages by strand jacks at eight points. A strand jack pulls a bundle of steel cables through a hydraulic jack a short stroke at a time. All the jacks ran from one central computer, so they could move one at a time or together, and the roof had to stay level within 1.2 in. (30 mm); each stage took three night shifts. The large deflections at lift-off were predicted and allowed for with movement joints, and monitored.

    cloud.aisc.org

    Credit

    Buro Happold (engineer), Watson Steel (fabricator), PSC Fagioli (lifting); reported in AISC's Modern Steel Construction, December 2007

Watch for

  1. Picks logged at the hook

    Versatile, a construction software firm, says it has analyzed more than 12 million crane picks recorded by a device that hangs below the crane hook, built on Crosby rigging hardware, so that each lift is logged without ironworkers entering data. From a random sample of its own data it says a typical data center erects about 20,000 steel pieces in 77 to 120 days, 167 to 222 a day against six or seven truck deliveries, and that about 2% of pieces need extra handling that no schedule allows for.

    Achieved whenan erector or researcher compares the device's pick log with a manual count on a steel job and publishes the error rate.

    versatile.ai

    Claimed by

    Versatile, August 2026

Open

  1. 01

    A robot fits the beam

    A bench-scale rig on which a robot arm guides a hanging scale beam onto a column's bolted shear tab (the plate the beam end bolts to) until a drift pin, the tapered pin ironworkers use to line up holes, drops through both holes, and then puts in the first bolt. A person only starts each attempt. The rig stays under 2 m tall and the beam under 5 kg, so no one works at height and no crane is used.

    The brief
    Credit · unclaimed
  2. 02

    Phone checks on plumb

    A method, written up and scored, for measuring how far each steel column leans from vertical using a phone's LiDAR (laser depth) sensor or ordinary photos taken from the floor, and reporting it against the plumb tolerance in the governing code, such as AISC 303 in the US.

    The brief
    Credit · unclaimed

Open 01 · the brief

A robot fits the beam

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A bench-scale rig on which a robot arm guides a hanging scale beam onto a column's bolted shear tab (the plate the beam end bolts to) until a drift pin, the tapered pin ironworkers use to line up holes, drops through both holes, and then puts in the first bolt. A person only starts each attempt. The rig stays under 2 m tall and the beam under 5 kg, so no one works at height and no crane is used.

Why it is still open

Connecting, the job of receiving a beam from the crane and pinning it, is still done by ironworkers standing on the frame. Liang, Kang and Lee of National Taiwan University built a robotic assembly system in a scaled site in 2017, but it needed a specially designed beam with guide holes above each bolt hole. Jung and colleagues at Korea University tested a gantry bolting robot on a testbed in 2009 using torque-shear bolts. You, Ye, Zhou and Du (2025) taught robots construction assembly with force feedback from human operators, for welding and pipe insertion, not beams. None used an unmodified beam connection with a learned robot policy or published a tally of repeated attempts.

link.springer.comiaarc.orgarxiv.org

Built with what exists

Hugging Face's LeRobot software for recording and training (see the Note "No download"); a small cobot arm or a low-cost SO-101 arm; two USB cameras; an open robot model such as NVIDIA's GR00T 2, which its maker says learns a task from a few demonstrations (see the Note "Five demonstrations per task"); aluminum angle and plate; a small chain hoist on a 2 m gantry.

  1. First step

    Build a 1:5 scale column stub and beam with a two-hole shear tab, and record 20 placements steered by a person through LeRobot's teleoperation tools.

  2. Done looks like

    50 filmed attempts from random starting offsets of up to 30 mm and 10°, with a success counted when the drift pin passes both holes within 60 seconds; the success rate and median time published beside 50 attempts by a person with a tag line on the same rig; code, recordings and drawings released.

Open 02 · the brief

Phone checks on plumb

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A method, written up and scored, for measuring how far each steel column leans from vertical using a phone's LiDAR (laser depth) sensor or ordinary photos taken from the floor, and reporting it against the plumb tolerance in the governing code, such as AISC 303 in the US.

Why it is still open

Plumbing a frame, making its columns vertical, is checked with total stations, laser plummets or plumb lines. Shimizu's SMART used lasers for it in 1991 (see above), and a 2024 study in Novi Sad, Serbia, measured column verticality in a sports hall with a terrestrial laser scanner. A surveyor's test published by Pix4D, the scanning app's maker, in April 2026 found an iPhone 17 Pro with an RTK satellite receiver within 2 to 9 cm of a Leica robotic total station across a whole site; that measures position over a site, not the lean of one column over a few meters. No study was found that compares phone-grade LiDAR or photogrammetry with a total station on steel columns.

zbornik.gf.uns.ac.rspix4d.com

Built with what exists

An iPhone Pro or iPad Pro with LiDAR and a scanning app such as Polycam; open photogrammetry software (COLMAP, OpenMVS); Open3D in Python to fit a line to each column; a total station borrowed from a surveying course as the reference.

  1. First step

    Get permission to measure the exposed steel columns of a parking garage or warehouse, and measure five columns both ways.

  2. Done looks like

    40 columns in finished steel-framed buildings, each measured from floor level by phone and by total station; the mean and worst difference reported in mm per m of height, with a count of columns where the phone and the total station give a different in-or-out-of-tolerance verdict.