Bolting and welding is making the permanent connections between pieces once they are in place, first by hot rivets and now by high-strength bolts and field welds.

5

Milestones achieved, from 1920s to 1999.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1920s

    Rivets driven by gangs

    The steel frames of the skyscrapers of the 1920s and 1930s were joined by four-man riveting gangs. A "heater" heated rivets red-hot in a portable forge and tossed them to a "sticker-in", who caught each one in a metal can or glove and set it in the hole; a "bucker-up" braced the rivet with a dolly bar while the "riveter" hammered its end flat with a pneumatic hammer. Mohawk riveting gangs from Kahnawake, near Montreal, worked this way on the Chrysler Building and Rockefeller Plaza, by the account of Tony Tekaroniake Evans for History.com (see Safety at height).

    history.com

    Credit

    ironworkers' riveting gangs

  2. 1955

    Turn the nut, not torque

    A high-strength bolt holds a joint by being stretched tight, and its tension is hard to see. Railroads needed a way to tighten bolts in remote places without power tools, and tests by the American Railway Engineering Association showed that one turn of the nut from finger-tight gave the needed tension; in 1955 the Research Council on Riveted and Bolted Structural Joints adopted it. Bethlehem Steel then started the count from "snug", the point at which an impact wrench begins to hammer, and added a half or three-quarter turn, which entered the council's 1960 specification; from 1964 the turn was set by bolt length, with a tolerance of ±30° for turns of a half or less. By 1987, Kulak, Fisher and Struik wrote, rivets were rarely used in new work.

    boltcouncil.org

    Credit

    American Railway Engineering Association; Bethlehem Steel (E. F. Ball and J. J. Higgins); Research Council on Riveted and Bolted Structural Joints

  3. 1980

    Torque wrenches lose, then return

    In the calibrated wrench method a wrench is set to stop at a torque thought to give the right tension. Torque depends on friction in the threads and under the nut, which rain, rust and dirt change, so the same torque can give different tensions. The council's 1980 specification removed the method, though in 1979 about 36% of US bolt installations used it. The 1985 specification allowed it again with stricter rules, among them tightening at least three bolts of each diameter each working day in a device that reads bolt tension directly.

    LessonA tightening method must be checked against measured tension on the day and with the bolts actually used.

    boltcouncil.org

    Credit

    Research Council on Structural Connections; account by Kulak, Fisher and Struik

  4. 1985

    Bolts one person can tighten

    The council's 1985 specification also allowed "alternate design" bolts and direct tension indicators. A tension-control bolt has a splined tip beyond the nut that an electric wrench grips while it turns the nut; a groove shears off the tip at the torque meant to give the right tension, so one worker tightens it from one side and an inspector checks only that the tips are gone. A direct tension indicator is a washer with bumps that flatten as the bolt tightens, and the gap left shows the tension.

    boltcouncil.org

    Credit

    Research Council on Structural Connections; account by Kulak, Fisher and Struik

  5. 1999

    Robots weld columns on site

    A column splice joins one column to the one above it; on the Japanese projects here it is a full-penetration weld all the way round a steel tube or box column. Engineers of the Ministry of Construction's Kanto regional bureau and Maeda Corporation reported in 1999 on a pair of five-axis robots that ran on a rail set round each column, measured the weld groove by touch sensing, and welded column splices on a government building project. Twenty years later, a 2019 article described portable robots welding square-tube and built-up box columns in site trials, to make up for an aging pool of certified welders.

    jstage.jst.go.jpjcmanet.or.jp

    Credit

    Norio Oki, Takeshi Kito and colleagues (Ministry of Construction; Maeda Corporation)

Watch for

  1. Fully automatic column welding

    Kajima says its manipulator-type site welding robot welds a whole column joint with no welder at the joint. A small arm moves on an aluminum rail round the column, welds in eight blocks, measures each groove to plan its passes and settings, changes to a chisel tool to remove slag between layers, and works inside a tent that keeps out rain and wind. Kajima says two people set it up and remove it in half a day even for large columns that take several days to weld, and that it has been used on 4 sites since 2020.

    Achieved whenan owner, inspector or outside researcher publishes the ultrasonic test results and crew hours for robot-welded columns on a named project.

    jcmanet.or.jp

    Claimed by

    Kajima, in the Japan Construction Machinery and Construction Association's journal, May 2025

  2. A carried cobot welds columns

    FANUC says its CRX Structural Column Welding System uses arms of 11 kg, light enough to carry in one hand, that clamp to a column on magnetic bases, find their own mounting angle and the joint with a laser or touch sensor, and start without teaching. Four of them can weld round an 800 mm square column. FANUC says the system also detects erection pieces, the temporary plates welded to columns to hold them during erection, and welds between them, a part of column welding it says has stayed manual.

    Achieved whenthe system welds columns on a named building site and the welds pass the project's ultrasonic testing, reported by someone other than FANUC.

    fanuc.co.jp

    Claimed by

    FANUC, September 2026, for demonstration at the Japan International Welding Show

Open

  1. 01

    Turn-of-nut read from photos

    A phone app that reads the paint match marks on a structural bolt before and after tightening, works out how far the nut turned relative to the bolt, and checks the turn against the one required for that bolt's length, with a bench test that shows how well the angle it reads predicts the tension.

    The brief
    Credit · unclaimed
  2. 02

    Robot field welds, counted

    A public table of every reported use of robots welding steel columns or beams on building sites: project, year, robot maker, column type, joints welded, ultrasonic test rejection rate, crew size and hours, and manual-weld figures where a report gives them.

    The brief
    Credit · unclaimed

Open 01 · the brief

Turn-of-nut read from photos

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A phone app that reads the paint match marks on a structural bolt before and after tightening, works out how far the nut turned relative to the bolt, and checks the turn against the one required for that bolt's length, with a bench test that shows how well the angle it reads predicts the tension.

Why it is still open

In the turn-of-nut method the nut and bolt end are marked after snugging, and inspectors judge the turn by eye. Katada and Nomura (2026) screen handheld video of marked bolts on bridges under erection and sort each bolt as loose, tight or unknown, and an August 2026 Roboflow tutorial passes or fails painted torque-seal lines on fasteners; neither measures the angle turned or checks it against the turn the bolt's length requires. Lei and colleagues at Wuhan University read painted anti-loosening lines on bolts with an average error of 1.145°, but to detect loosening on equipment, not to check tightening turns. The SDNET 2025 dataset of 826 phone images covers missing, loose and fixed bolts, and its authors say public datasets of bolt defects are lacking. No work was found that ties photo-read turns to measured tension.

taylorfrancis.comblog.roboflow.compmc.ncbi.nlm.nih.govncbi.nlm.nih.gov

Built with what exists

A phone camera; an Ultralytics YOLO detector and a segmentation model such as SAM 2 or the Fast-SCNN that Lei and colleagues used; a bolt tension calibrator of the Skidmore-Wilhelm type, borrowed from an erector or a university lab; A325 structural bolts in four lengths; a hand torque multiplier or impact wrench and steel plates on a bench at floor level.

  1. First step

    Tighten 20 bolts in a calibrator, measuring each turn with a protractor and recording the tension, to set the ground truth.

  2. Done looks like

    200 bolts tightened on the bench and photographed before and after; the app's reading within 10° of a protractor reading on at least 95% of them; its pass or fail verdict compared with the calibrator's tension for every bolt; all photos, labels and readings published. The same set can add tension-control bolts photographed with and without their tips sheared, a class SDNET 2025 lacks.

Open 02 · the brief

Robot field welds, counted

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of every reported use of robots welding steel columns or beams on building sites: project, year, robot maker, column type, joints welded, ultrasonic test rejection rate, crew size and hours, and manual-weld figures where a report gives them.

Why it is still open

The reports are scattered across Japanese journals and trade press, each with its own measures: the 1999 report on a government project, a 2019 article on portable robots, Kajima's 2025 note of "4 sites since 2020" with no quality figures, and FANUC's 2026 launch. Brian Potter's review cites a count of at least 60 uses of whole automated building systems, not results for field welding robots. No compiled table was found.

jcmanet.or.jpconstruction-physics.com

Built with what exists

J-STAGE and the JCMA journal archive (both free PDFs), pdftotext, a large language model to translate Japanese text with each figure checked against the original, and a spreadsheet published as CSV.

  1. First step

    Search J-STAGE and the JCMA archive for 現場溶接ロボット ("site welding robot") from 1990 to 2026 and list every hit.

  2. Done looks like

    At least 15 reported applications, each with a source link and every field filled or marked "not reported", checked by a welding inspector or one of the papers' authors, and published.