Decking is laying the ribbed steel sheets that become a building's floors and roof, fastening them to the frame and, for composite floors, welding the steel studs that tie the beams to the concrete poured on top.

7

Milestones achieved, from 1938 to 2022.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1938

    Steel floor cells tested

    The H.H. Robertson Company sent six specimens of its "Keystone Beam" floor, panels of cellular sheet steel under a concrete fill, to the US National Bureau of Standards (NBS), which loaded them in bending, by impact and at single points for its program on low-cost houses and apartments. The report, issued on 29 December 1938, says the floor had been used in about 900 buildings by 1 June 1938, about 70 of them dwellings.

    nvlpubs.nist.gov

    Credit

    H.H. Robertson Company; Herbert L. Whittemore, Ambrose H. Stang and Cyrus C. Fishburn of NBS

  2. 1945

    A design rule for deck

    The American Iron and Steel Institute formed the Steel Roof Deck Industry Technical Committee in 1939, and it produced a draft Design Specification for Steel Roof Decking, published in 1945. The group became the Metal Roof Deck Technical Institute in 1947 and the Steel Deck Institute (SDI) in 1964, and it published recommendations for composite steel floor deck in 1978.

    sdi.org

    Credit

    American Iron and Steel Institute; Steel Deck Institute

  3. 1950s

    The deck carries the floor

    Before the Second World War, concrete floors in steel buildings were usually reinforced with bars over temporary or permanent forms. In the 1950s H.H. Robertson rolled its roof deck profiles thick enough to carry the whole floor load on their own and sold them as Q-Floor, so the slab above needed no bottom reinforcement. SDI writes that "Q Deck" became so common that it was used as the name for steel deck in general.

    sdi.org

    Credit

    H.H. Robertson Company

  4. 1960s

    Ridges bond deck to concrete

    Inland Steel rolled small raised ridges, called embossments, into its deck so that the steel gripped the concrete the way the ridges on a reinforcing bar do. The deck and slab then worked together as one composite floor. Inland called it Hi-Bond, and Robertson followed with Q-Lock.

    sdi.org

    Credit

    Inland Steel

  5. 1970s

    Studs welded through the deck

    A shear stud is a short headed steel pin welded to the top of a beam so the beam and the concrete slab act together. The stud gun came from shipbuilding: TIME reported in 1943 that Ted Nelson, a welder at the Mare Island Navy Yard, had built one that let a fast worker set 1,000 studs in eight hours instead of 40. In the 1970s Inland and Robertson rolled deck profiles with wider ribs so that studs could be welded straight through the deck sheet into the beam; Inland's profile was used on the Sears Tower, and Robertson's QL-99 became the shape still made today. The Steel Construction Institute says through-deck welding is the normal method in Britain and that galvanizing on the deck does not affect the weld.

    sdi.orgtime.comsteelconstruction.info

    Credit

    Ted Nelson; Inland Steel; H.H. Robertson Company

  6. 1997

    Bundles landed on loose joists

    On 14 March 1997 a crew landed three bundles of deck near the ends of 40 ft (12 m) bar joists that had not been welded at both ends or braced. When two workers tried to land a fourth bundle farther out, the joists moved and fell, and one worker died. OSHA cited the case when it wrote its 2001 steel erection rule (see Safety at height), which bars landing deck bundles on joists until all bridging is installed and the joist ends are attached, unless six listed conditions are met, caps such bundles at 4,000 lb (1,814 kg) and keeps the load's edge within 1 ft (0.3 m) of the joist's bearing end.

    LessonA frame that can hold its own weight may not yet hold a bundle of deck.

    osha.gov

    Credit

    OSHA, from its accident records

  7. 2022

    Deck nails tested in wind

    The British Constructional Steelwork Association (BCSA) agreed a program with the Building Research Establishment (BRE) in 2019 to test how decking holds in wind before the concrete is poured. On BRE's rig, which follows real gust records, many temporary gas-fired or cartridge-fired nails failed at a pressure of about 1.6 kN/m², while permanent fixings held beyond 3.2 kN/m². Wind tunnel models at 1:150 found the largest uplift at building edges and around cores, and the resulting guidance says standard temporary fixing patterns suit only the Midlands and South-Central England; most projects elsewhere need heavy-duty or permanent fasteners in some zones.

    LessonTemporary nails that were standard practice failed at half the pressure the permanent fixings held.

    newsteelconstruction.com

    Credit

    BCSA; BRE

Watch for

  1. A carriage that fastens deck

    BlueScope Buildings North America, of Kansas City, holds a US patent for a wheeled carriage that rides along the ribs of roof deck, finds the steel supports and the fasteners already in place, and drives structural pins and side-lap screws from separate hoppers, with edge sensors and a brake to stop it running off the deck.

    Achieved whena machine built to the patent fastens a whole roof on a real job and someone outside the company counts its fasteners against the specified pattern.

    patents.justia.com

    Claimed by

    BlueScope Buildings North America (inventors including Dan Kumm), US patent 12,643,241, granted June 2026

  2. A robot welds shear studs

    Students at Lehigh University, working with the company Structural Steel Technologies, built RoboStud, a robot arm with a stud-welding gun and stereo cameras that find where each stud goes. They say the prototype finds and reaches stud positions reliably under site-like conditions; it is aimed at bridge girders.

    Achieved whenit welds the studs on a real girder or deck and someone outside the team publishes how many passed the standard bend test.

    engineering.lehigh.edu

    Claimed by

    Henry Burd, Demetri Kostas and Ahmad Salem, advised by Corey Montella, at Lehigh's 2026 undergraduate research symposium

Open

  1. 01

    Loose deck in the wind

    Open measurements of the wind speed at which steel deck sheets move before they are fastened: loose sheets, sheets held by a single safety attachment, and a bundle with its straps cut, for common profiles and thicknesses. Wind tunnel tests on scale models matched for weight per area, checked against a few full-size sheets on a frame at ground level in natural gusts, tethered so they cannot blow free, with an anemometer beside them.

    The brief
    Credit · unclaimed
  2. 02

    Ground course for deck robots

    A public test course for machines that fasten steel deck, and a scoring sheet. Twenty sheets of roof and floor deck lie on steel beams resting on sleepers on the ground, with a marked fastening pattern and seeded faults: a support hidden under a shifted sheet, a side lap that is not nested, a fastener already in place, debris, an open edge. Experienced installers with stand-up screw guns run the course first to set the baseline.

    The brief
    Credit · unclaimed

Open 01 · the brief

Loose deck in the wind

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

Open measurements of the wind speed at which steel deck sheets move before they are fastened: loose sheets, sheets held by a single safety attachment, and a bundle with its straps cut, for common profiles and thicknesses. Wind tunnel tests on scale models matched for weight per area, checked against a few full-size sheets on a frame at ground level in natural gusts, tethered so they cannot blow free, with an anemometer beside them.

Why it is still open

The US rule lets up to 3,000 sq ft (279 m²) of deck lie unsecured in a controlled decking zone and requires decking to be secured at the end of a shift "or when environmental or job site conditions warrant", but gives no wind speed. BCSA's 2005 guide sets one planning limit for all steel erection, a gust of 12.0 m/s (27 mph), and the BCSA–BRE tests of 2019 to 2022 measured temporary nails, not loose sheets. No published measurement of when loose sheets slide or lift was found.

osha.govsteelconstruction.infonewsteelconstruction.com

Built with what exists

A university boundary-layer wind tunnel; thin steel shim cut into scale sheets; full-size deck sheets from a supplier; steel sections on timber sleepers; an ultrasonic anemometer; action cameras; ratchet straps as tethers.

  1. First step

    Ask SDI, BCSA and a wind tunnel lab whether such data exist, and log three loose sheets of 1.5 in (38 mm) roof deck on a ground frame on a windy day.

  2. Done looks like

    A published table, with video and raw wind logs, of the gust speed at which each of at least 12 configurations (three profiles, two thicknesses, loose and with one attachment) first slides and first lifts, five repeats each, set beside BCSA's 12 m/s planning gust.

Open 02 · the brief

Ground course for deck robots

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public test course for machines that fasten steel deck, and a scoring sheet. Twenty sheets of roof and floor deck lie on steel beams resting on sleepers on the ground, with a marked fastening pattern and seeded faults: a support hidden under a shifted sheet, a side lap that is not nested, a fastener already in place, debris, an open edge. Experienced installers with stand-up screw guns run the course first to set the baseline.

Why it is still open

BlueScope's 2026 patent describes a deck-fastening carriage but no published trial, and the only stud-welding robot found is a 2026 student prototype. Searches found no shared course or score for fastening deck by machine.

patents.justia.comengineering.lehigh.edu

Built with what exists

Deck sheets and self-drilling screws from a supplier; steel beams on sleepers; stand-up fastening tools such as the Hilti SDT 9 or Simpson Strong-Tie Quik Drive for the human baseline; a mobile robot base carrying a collaborative arm with a screwdriving tool; a robot control model trained from a few demonstrations (see the Note "Five demonstrations per task"); scoring rules published the way benchmarks are (see the Note "First on three benchmarks").

  1. First step

    Lay six sheets of roof deck over three beams on sleepers in a yard and time two installers fastening them to a manufacturer's published pattern.

  2. Done looks like

    The course and rules published; at least one machine and two installers each run it three times; a tally of fasteners within 13 mm (½ in) of target, supports missed, seeded faults caught, stops at the open edge, and minutes per sheet.