Solar installation is the work of designing solar power systems for a particular roof or piece of land, mounting the panels, wiring them to inverters, batteries and the grid, and checking that they keep working.
1973
The University of Delaware dedicated Solar One, a two-bedroom house in Newark, Delaware, that it calls the first house to be powered and heated by energy converted from sunlight; many of its parts, including the solar modules, were built by hand because they could not be bought.
42
Milestones achieved across 7 domains.
9
To watch for: announced, not yet confirmed outside.
15
Open deliverables. Nobody has shipped them.
In one minute
Where it started
The first rooftop arrays were experiments: a photo long captioned as Charles Fritts's 1884 array in New York was traced by the investigators at Bellingcat in 2023 to George Cove's roof on Maiden Lane in 1909, and the University of Delaware built its Solar One house in 1973. Installing became a trade in the 1980s and 1990s, when ARCO Solar built megawatt plants on sun-following racks in California and Germany's 1,000 Roofs Programme paid for grid-connected systems on houses.
Where it stands
By the count of the IEA's Photovoltaic Power Systems Programme (IEA PVPS), the world added 698 GW of solar in 2025 and had close to 3,000 GW in all; 286 GW of the new capacity was on or beside homes and businesses. China's energy agency counted about 153 GW of distributed solar among the roughly 317 GW China added in 2025, and Pakistan added an estimated 17 GW in 2024 and 15.8 GW in 2025, mostly small systems built with imported panels. The trade's weak points are well documented: fires traced to poor installation, clamps that let go in storms, inverters left on the wrong settings, and forecasts that promise more than plants deliver.
What is open
Many countries do not know how much rooftop solar they have or what it produces, and more than 300 GW worldwide is over ten years old, so finding faults and repairing old systems is a growing share of the work. Most of the tools sold for design, inspection and fault finding are scored only on their makers' own data. The open jobs below are mostly shared test sets and public tables that would let anyone check those tools: for shade, designs, clamps, storms, settings, fires, faults and home batteries.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Site survey and design
This work decides whether a roof or plot suits solar, measures its sunlight and shade, lays out the panels and wiring, and estimates how much power the system will make and what it will save.
5 · 1 · 3
Last achievedRegulator flags oversold savings2024
Watch forAddress to plan set
3
openPermits and grid connection
This work gets the building permit and inspection, applies to the power company to connect, sets how exported power is paid for, and waits for permission to switch on.
7 · 2 · 2
Last achievedPakistan ends net metering2026
Watch forGrid approval in five minutes
2
openRoof mounting
This work fixes panels to the roofs of homes and other buildings with rails, clamps, bolts and flashings, so that the array stays on in high wind, keeps water out and leaves room for firefighters.
6 · 1 · 2
Last achievedShared clips peel whole rows2020
Watch forGlued panels with fire ratings
2
openSolar farms
This work builds power plants of thousands to millions of panels on open land, on farmland and on water: clearing the site, driving the posts, setting up racks or sun-following trackers, and placing the panels.
7 · 1 · 2
Last achievedThe next weak link2024
Watch forA factory beside the field
2
openWiring and inverters
This work runs the cables from the panels to the inverter, the box that turns the panels' direct current (DC) into the alternating current (AC) a building uses, and fits the switches, fuses and fault detectors that keep the system safe.
6 · 1 · 2
Last achievedWhole arrays tested for firefighters2020
Watch forStrings at 2,000 volts
2
openBatteries
This work adds a battery to a solar system, usually in a home or small business, so that daytime solar power can be used at night or during a power cut, and sets up the inverter and software that decide when it charges and discharges.
5 · 1 · 2
Last achievedHome batteries as one plant2025
Watch forSodium-ion batteries enter homes
2
openInspection and monitoring
This work tests a finished system before it is switched on, inspects it later, and watches its output to find faults, dirt and slow decline.
6 · 2 · 2
Last achievedPlants slip 1.3% a year2020
Watch forMore inspections, less loss
2
open
Advances to build with
1 research note
Open in solar installation
3 of 15 open deliverables
Open · Site survey and design
Proposals checked against meters
A public set that pairs the yearly output promised in home solar sales proposals with what the same systems' meters recorded in their first full year, corrected for that year's weather, across many installers and at least three countries.
Built with what exists
Homeowners' own proposal PDFs; data exports from inverter monitoring portals (Enphase, SolarEdge, SMA and others let owners download their history); PVGIS and PVWatts reruns with the actual year's satellite weather; an AI agent that pulls the promised kWh, system size and assumptions from each proposal and cites the page it took them from (see the Note "Findings that cite notes").
Open · Permits and grid connection
A switch-on clock abroad
An open dataset of how long home solar takes from signed contract to switch-on outside the US, split into the same phases NREL uses (design, permit, installation, inspection, permission to operate), for at least five countries.
Built with what exists
SolarTRACE's phase definitions; milestone dates exported from installers' customer-management software; a short form for homeowners; an AI agent that reads dates from approval letters and emails and cites each one (see the Note "Findings that cite notes").
Open · Roof mounting
Clip grip under storm cycles
A bench test of the top-down clips from at least ten makers, each holding an unwired panel frame on a short rail, pushed and pulled in a load frame through repeated gust-like loads until the clip slips, loosens or breaks. Bolt tension is logged throughout, and the panel frame is checked for cracks at its holes.
Built with what exists
A servo-hydraulic or pneumatic load frame at a university structures lab; load cells and washer-type bolt-tension sensors; rails and clips bought from distributors; panels never wired to anything; load histories taken from the McMaster team's duty cycles and the ASCE 7 rooftop solar provisions; Python for the analysis.