Permits and grid connection
This work gets the building permit and inspection, applies to the power company to connect, sets how exported power is paid for, and waits for permission to switch on.
7
Milestones achieved, from 1990 to 2026.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1990
A thousand roofs connect
In September 1990 Germany's federal research ministry (BMFT) and the states started the 1,000 Roofs Programme, which paid for small grid-connected systems of 1 to 5 kW on one- and two-family houses, first in the west and from 1991 in the east. Its stated aims included learning how to install grid-connected roof systems that were cheap, reliable, standard and safe. The average system was 2.5 kW; a measurement programme recorded every system's monthly output and what it sent to and drew from the grid, and 100 systems were monitored in detail. In Saxony alone 343 households applied for 150 places.
Credit
BMFT and the German states
2013
Paperwork priced in two countries
Joachim Seel, Galen Barbose and Ryan Wiser of Lawrence Berkeley National Laboratory (LBNL) compared home systems in Germany and the US. In 2011 they cost $3.42 per watt in Germany and $6.21 in the US. Permits, inspection, grid connection and incentive paperwork took 5.2 labor hours per system in Germany against 22.6 in the US, because Germany required no local permit, inspection or permit fee for a home system. A US project took 126 days on average from incentive application to completion, against 35 days in Germany.
LessonMuch of a home system's price is process, not hardware, and process can be cut by rule.
Credit
Seel, Barbose and Wiser, LBNL
2021
Rooftops switched off remotely
South Australia required every inverter installed after 28 September 2020 to be capable of being switched off remotely. On 14 March 2021 the state's grid demand fell to 358 MW, near the record low, while the link to Victoria was down for maintenance. The market operator AEMO directed the transmission company to keep demand above 400 MW, and the distributor SA Power Networks remotely cut about 10 MW of household solar, the first use of the rule, with another 40 MW reduced by lowering voltages at seven substations.
LessonWhen rooftops are the largest generator on a grid, new systems must be built so the grid operator can turn them down.
Credit
South Australian Government; AEMO; SA Power Networks
2023
California cuts export credits
Under net metering, each unit of power a home sends to the grid offsets a unit it buys, at the full retail price. From 15 April 2023 California's largest utilities paid new rooftop customers for exports under a "net billing tariff", which credits exported power at much less than the retail price. LBNL found that new installs under the tariff averaged about 8,000 a month in early 2024, fewer than in any month under net metering back to May 2020, while the share of new systems sold with a battery rose from about 10% to about 60%.
LessonHow exports are paid for decides what installers sell, and it moved California's market from solar alone to solar with storage within a year.
Credit
California Public Utilities Commission (the rule); Galen Barbose, LBNL (the measurement)
2023
Inverters left on wrong settings
From December 2021 every new inverter in Australia had to use the settings of the standard AS/NZS 4777.2:2020, which keep it running through brief voltage dips instead of tripping off; the installer selects them when commissioning. Using records that inverter makers supplied, Project MATCH, led by UNSW Sydney with AEMO and the monitoring company Solar Analytics, found only about 40% of new installs in early 2022 set to the 2020 standard. A random audit for AEMO, reported in April 2023, could confirm correct settings on only 28% of the inverters whose settings were visible and found 55% wrong in some way. By mid-2023 the makers' records showed about 75 to 80% of new installs set correctly, a rise UNSW put down largely to steps the makers took themselves.
LessonA setting each installer must choose by hand is often missed, and the fix came mostly from the makers, not from the installers.
Credit
UNSW Sydney, AEMO and Solar Analytics (Project MATCH, funded by ARENA)
2025
US waits grow again
NREL's SolarTRACE project tracks home projects up to 20 kW from contract to the utility's permission to operate, using installer data that covers 22% of US home solar installed from 2017 to 2023. Its November 2025 review found the average wait had fallen from 2017 to 2019 and then risen again, to 4.5 to 6 months in 2023, about a month longer than in 2019; solar with a battery took 8 to 9 months. In September 2026 LBNL published the first nationwide set of US distribution connection applications, 2.7 million since 2000, which found that more than half of systems under 30 kW got permission to operate within 90 days of applying in 2020 to 2025.
Credit
Jesse Cruce and colleagues, NREL; Kathryn Chelminski and colleagues, LBNL
2026
Pakistan ends net metering
Pakistan's power regulator NEPRA notified its Prosumer Regulations on 9 February 2026, replacing the net metering rules of 2015 with net billing. Profit, a Pakistani business paper, reported the rate for new customers' exports at Rs8.13 per unit, down from about Rs25.9, and new contracts cut from seven years to five; it also reported a government estimate of 13,000 to 14,000 MW of solar running off the grid's books, against 466,000 net-metering customers. Muhammad Uzair Yousuf of NED University estimated that a typical home exporting 60% of its output lost 44% to 49% of the value of its solar power.
LessonCheap imported panels spread faster than the grid's payment rules could absorb, and many owners skipped the grid connection altogether.
Credit
NEPRA (the rule); Muhammad Uzair Yousuf (the estimate)
Watch for
Grid approval in five minutes
Netze BW, a distribution company in southern Germany, says its automated check now issues a binding grid connection approval, with the connection point, for home systems up to 15 kW in about five minutes where the local grid has room, against an average of 12 days for manual review. It says it received more than 16,000 requests between its launch in late July 2026 and October, and that more than 5,000 applicants got an automatic answer within five minutes. A comparison of German distributors, as reported by pv magazine, put the median across all of them at 80 days.
Achieved whenan outside comparison or Germany's Federal Network Agency reports Netze BW's processing times for a full year, including the share of requests answered automatically.
Claimed by
Netze BW, October 2026
Ten million Indian rooftops
India's PM Surya Ghar scheme, launched in February 2024, aims to put rooftop solar on 10 million (one crore) homes by March 2027, with subsidies paid through a national online portal that needs no paper forms. India's Ministry of New and Renewable Energy (MNRE) counted 1,917,698 systems covering 2,396,497 households on 3 December 2025, and 5.006 million households and 14.8 GW on 4 August 2026; on 4 November 2026 the minister said installations had passed 6.5 million.
Achieved whenan outside audit or distribution-company meter records confirm 10 million households served by connected, working systems, counted the same way throughout.
Claimed by
MNRE, August and November 2026
Open
01
A switch-on clock abroad
An open dataset of how long home solar takes from signed contract to switch-on outside the US, split into the same phases NREL uses (design, permit, installation, inspection, permission to operate), for at least five countries.
The briefCredit · unclaimed02
Settings checked beyond Australia
A measured share of new home inverters set to the grid settings their utility requires, for at least one US utility area and one European distribution area, using the method of Australia's Project MATCH: settings records that inverter makers already hold for their internet-connected units, shared with owners' identities removed and compared with the profile the local grid code requires.
The briefCredit · unclaimed
Open 01 · the brief
A switch-on clock abroad
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open dataset of how long home solar takes from signed contract to switch-on outside the US, split into the same phases NREL uses (design, permit, installation, inspection, permission to operate), for at least five countries.
Why it is still open
NREL's SolarTRACE and LBNL's connection dataset cover only the US. In Germany, a 2026 comparison reported only the distributors' own processing times (12 days at Netze BW, a median of 80 days overall), and the last whole-project figure found here is LBNL's 2013 figure of 35 days. SolarPower Europe has said that 14 European countries keep rooftop permitting under six months, but some cases still take a year, and Ember estimates that up to 1.5 million European households could face connection delays because distribution grids lack room.
osti.govpv-magazine.comenergiaestrategica.comember-energy.org
Built with what exists
SolarTRACE's phase definitions; milestone dates exported from installers' customer-management software; a short form for homeowners; an AI agent that reads dates from approval letters and emails and cites each one (see the Note "Findings that cite notes").
First step
Turn SolarTRACE's phase definitions into a form and ask three installers in one country for last year's dates.
Done looks like
2,000 home projects in at least five countries (for example Germany, France, Italy, Australia and India) with the median and 90th-percentile days for each phase, released openly and updated each year.
Open 02 · the brief
Settings checked beyond Australia
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A measured share of new home inverters set to the grid settings their utility requires, for at least one US utility area and one European distribution area, using the method of Australia's Project MATCH: settings records that inverter makers already hold for their internet-connected units, shared with owners' identities removed and compared with the profile the local grid code requires.
Why it is still open
Australia is the only country found to have measured this, at about 40% correct in early 2022 and 75 to 80% by mid-2023 (above). EPRI, the US utility research institute, advises utilities to assume that inverter settings may have been changed, and says it has algorithms that infer many settings from smart-meter data and is building tools to check them over the inverter's standard interface, but this research found no published share of US or European home inverters set as required.
Built with what exists
Fleet records from inverter makers' cloud platforms, shared under a data agreement; each utility's published settings requirements; smart-meter data where a utility takes part; Python; an AI agent that reads each utility's settings document and cites the page each required value comes from (see the Note "Findings that cite notes").
First step
Write down the required settings for three utilities from their own documents, and ask two inverter makers' grid-compliance teams whether they can report the share of their units in those areas set to each.
Done looks like
Settings records for at least 2,000 systems installed in 2025 in one US utility area and one European distribution area, from at least three inverter makers, with the share set correctly published by maker and by setting.