Industries / Construction and property / Commercial and residential construction / Electrical contracting / Solar installation
Roof mounting
This work fixes panels to the roofs of homes and other buildings with rails, clamps, bolts and flashings, so that the array stays on in high wind, keeps water out and leaves room for firefighters.
6
Milestones achieved, from 2008 to 2020.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2008
Paths left for firefighters
In spring 2007 the Los Angeles Fire Department began strictly enforcing its own rules for rooftop solar on homes as well as businesses, including a 4 ft clear perimeter around arrays and a 50 ft by 50 ft limit on array size, and permits across California were held up. California's State Fire Marshal (CAL FIRE-OSFM) called about 20 fire officials and solar company staff to a first meeting on 17 August 2007. Their Solar Photovoltaic Installation Guideline, in final draft on 22 April 2008, set rules for warning labels, for clear pathways across the roof and for a 3 ft space along the ridge, wide enough for crews to cut a 2 ft hole to let smoke out. Its authors mapped its sections to section 605.11 of the 2012 International Fire Code, the model code adopted across the US, and California's 2016 codes require a 6 ft clear perimeter on the roofs of non-residential buildings.
LessonRules written by one fire department stalled permits, while rules written with installers spread nationwide.
Credit
CAL FIRE-OSFM; the California Solar Energy Industries Association (CalSEIA); Bill Brooks and Matt Paiss
2012
Leaks at the roof fixings
Udo Rindelhardt's February 2012 report for SAENA, Saxony's energy agency, followed up the 150 systems that Germany's 1,000 Roofs Programme put on houses in Saxony about 20 years earlier. Of the 102 owners who returned a 2011 questionnaire, 15 (16% by the report's count) reported roof leaks: five where the string cables entered the roof and three at the rack fixings after about 15 years. Nine systems had already been taken down and rebuilt because the roof was renewed or the house altered.
LessonA roof usually needs work before its array wears out, so every hole through it is a future leak and every array a future removal job.
Credit
Udo Rindelhardt; SAENA
2012
Arrays tested with the roof
Roofs carry a fire class (A, B or C) from flame-spread and burning-brand tests. Until 2012 a rack-mounted panel got its own fire class from tests of the panel alone. Tests by Solar ABCs, a US Department of Energy-funded group, with Underwriters Laboratories (UL) found that the panel's class "is NOT a good predictor" of the class of panel, rack and roof together, because flames can travel in the gap under the array. The 2012 International Building Code required a solar system's fire class to match the roof's, and UL rewrote its test to rate panel, rack and roof as one system.
LessonA part's own rating does not show how the assembly burns.
Credit
Solar ABCs (Larry Sherwood); UL; the International Code Council
2016
Wind rules written for arrays
ASCE 7, the US standard for the loads a building must carry, published by the American Society of Civil Engineers, added sections 29.4.3 and 29.4.4 in its 2016 edition: wind pressures for tilted panels on flat and low-slope roofs, and for panels laid parallel to a sloped roof. Earlier editions had not addressed wind on rooftop panels, as Florida's Building Commission noted when it adopted the standard. The Structural Engineers Association of California (SEAOC) publishes worked examples in its report PV2-2017.
Credit
ASCE 7 committee; SEAOC
2019
Japan finds the risky roofs
Japan's Consumer Safety Investigation Commission studied 127 reports of fire, smoke or overheating from home solar systems logged between March 2008 and November 2017. Of the 72 cases it could examine, 59 started in the inverter or in the junction box where cables meet, and 13 in panels or cables. Every fire that spread into the wooden roof deck was on a house whose panels sat directly on the roofing felt with no steel sheet beneath, a mounting used on about 4.5% of Japan's roughly 2.37 million solar homes, or 107,000 houses. About 70% of owners surveyed had never had their system maintained. The commission asked for a risk assessment, changes to that mounting and urgent inspections of systems out of warranty.
LessonHow a system is mounted decides whether a small fault stays small.
Credit
Consumer Safety Investigation Commission, Consumer Affairs Agency of Japan
2020
Shared clips peel whole rows
After Hurricanes Irma and Maria in 2017 and Dorian in 2019, structural engineers from RMI (formerly Rocky Mountain Institute), the Clinton Climate Initiative and FCX Solar surveyed rooftop systems across the Caribbean, with more than 500 photographs. Their report, Solar Under Storm Part II (February 2020), found that top-down clips, which clamp the edges of two neighbouring panels at once, failed in 96% of the systems they observed, so one panel torn loose freed the next. They recommended clips that hold only one panel, or a bolt through each panel's frame.
LessonA clamp shared by two panels lets one failure run down the row.
Credit
RMI; Clinton Climate Initiative; FCX Solar
Watch for
Glued panels with fire ratings
Apollo Power, an Israeli maker of flexible panels, says its Panda Plus panel, 6.8 kg for about 2 m² and sold in a frameless version that is glued to the roof with no holes drilled, earned a Class A fire rating from "a certified laboratory", which its chief executive Oded Rozenberg called a first for a flexible panel. The laboratory, the test standard and the roof coverings tested were not named.
Achieved whena public certification listing names the laboratory and standard and shows the Class A rating for the glued panel on a stated roof covering, as the system rating rule since 2012 requires.
Claimed by
Apollo Power, August 2026
Open
01
Clip grip under storm cycles
A bench test of the top-down clips from at least ten makers, each holding an unwired panel frame on a short rail, pushed and pulled in a load frame through repeated gust-like loads until the clip slips, loosens or breaks. Bolt tension is logged throughout, and the panel frame is checked for cracks at its holes.
The briefCredit · unclaimed02
Roof access maps for crews
A city map, made from aerial photos, that flags roofs whose solar arrays leave no clear path to the ridge or around the roof edge, so fire crews know before they arrive which roofs they cannot cross or vent.
The briefCredit · unclaimed
Open 01 · the brief
Clip grip under storm cycles
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A bench test of the top-down clips from at least ten makers, each holding an unwired panel frame on a short rail, pushed and pulled in a load frame through repeated gust-like loads until the clip slips, loosens or breaks. Bolt tension is logged throughout, and the panel frame is checked for cracks at its holes.
Why it is still open
RMI saw top-down clips fail in 96% of the rooftop systems it surveyed after Caribbean hurricanes, and after Hurricane Beryl in 2024 it found panel frames cracking at their mounting holes under repeated loading. A 2021 review for the US Department of Energy by Berkeley Lab, NREL and Sandia found that "no significant dataset yet exists to fully characterize failures with top-down clamps". In October 2025 a McMaster University team (Du, Becker, Taylor and Needham, Journal of Structural Engineering) estimated by computer modeling the lifetime twisting cycles wind puts on shared top-down clamps, but tested no clamps. This research found no published comparison of clip models under repeated loads.
Built with what exists
A servo-hydraulic or pneumatic load frame at a university structures lab; load cells and washer-type bolt-tension sensors; rails and clips bought from distributors; panels never wired to anything; load histories taken from the McMaster team's duty cycles and the ASCE 7 rooftop solar provisions; Python for the analysis.
First step
Buy three clip models and one rail, and run one clip through 1,000 load cycles on a borrowed test frame while logging bolt tension.
Done looks like
Ten clip models, five samples each, cycled to failure or to a fixed number of cycles, with cycles to first slip and loss of bolt tension published per model and the raw data released.
Open 02 · the brief
Roof access maps for crews
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A city map, made from aerial photos, that flags roofs whose solar arrays leave no clear path to the ridge or around the roof edge, so fire crews know before they arrive which roofs they cannot cross or vent.
Why it is still open
California's rules since 2008 call for clear pathways and a 3 ft ridge space on homes, and its 2016 codes a 6 ft perimeter on other buildings, but many arrays were built before such rules or without permits. Tools such as Stanford's DeepSolar (Yu and colleagues, 2018) find panels in aerial images, but searches of the web and Crossref found no tool or study that measures the clear space arrays leave.
Built with what exists
County aerial photos at 15 cm per pixel or finer; open building outlines such as Microsoft's; an open image-segmentation model to outline panels, ridges and roof edges; QGIS and Python.
First step
Measure ridge and edge clearances by hand on 50 roofs with panels in one neighbourhood's public aerial photos, and count how many fall short.
Done looks like
1,000 roofs with panels in one city scored for pathway and ridge clearance, checked against 100 roofs measured by hand on the same photos, with the agreement rate published and the map offered to the local fire department.