The small modular reactor industry designs, licenses and builds nuclear reactors of about 300 MW of electricity or less, made largely in factories and shipped to their sites.
1957
On 8 April 1957 SM-1, a two-megawatt "package" reactor the US Army built at Fort Belvoir, Virginia, to test small power plants for remote places, reached criticality; the National Museum of the United States Army calls it the first nuclear reactor in the United States connected to a public utility grid.
38
Milestones achieved across 7 domains.
13
To watch for: announced, not yet confirmed outside.
14
Open deliverables. Nobody has shipped them.
In one minute
Where it started
The first small reactors were built for the US military in the 1950s: the reactor that drove the submarine Nautilus from 1955, and the Army's SM-1, which reached criticality in 1957 and was followed by seven more Army plants, several of them shipped in pieces to Greenland, Alaska and Antarctica. Civilian reactors then grew to 1,000 MW and more, on the expectation that bigger plants would be cheaper. A 1986 Energy Information Administration study of 67 US plants found that the saving from size was lost to longer construction.
Where it stands
Few small reactors of the new kind are running. Russia's floating Akademik Lomonosov has supplied the Arctic town of Pevek since 2019, and China's HTR-PM, two pebble-bed modules driving one turbine, entered commercial operation in December 2023. NuScale's design was certified in the United States in 2023, the same year its first project was cancelled when the expected power price rose to $89 per MWh. Canada licensed construction of a BWRX-300 at Darlington in 2025 and the US issued three construction permits in 2026, but in November 2026 Ontario Power Generation said its first unit would miss both its 2030 date and its budget.
What is open
The facts a newcomer needs to compare designs sit in separate filings: how much fuel each one needs, what waste it leaves, how large its emergency zone is, which rules it was excused from, and what it was expected to cost against what it cost. Most open deliverables here gather those public records into checked tables, or rerun published tests with open computer models. None involves nuclear material.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Reactor designs
This is the work of choosing a small reactor's coolant, fuel form and layout, building it and running it, from Army and Navy plants of the 1950s to helium-, salt-, sodium- and lead-cooled machines.
6 · 2 · 2
Last achievedPebble-bed modules go commercial2023
Watch forLinglong One awaits the grid
2
openFuel
Fuel work makes the enriched uranium and the finished fuel pieces a small reactor burns, and keeps a steady supply of both.
6 · 2 · 2
Last achievedStockpiles fill the gap2026
Watch forA licensed HALEU fuel plant
2
openLicensing
Licensing is the work of getting a regulator's permission to build a reactor, and later to run it, by showing that it can operate without undue risk to the public.
7 · 2 · 2
Last achievedThree permits in one year2026
Watch forFixed deadlines for reviews
2
openBuilding in a factory
This work makes reactor parts, or whole sections of a plant, in a factory or shipyard and moves them to the site, so that less is built in the open.
4 · 2 · 2
Last achievedA reactor floor lowered whole2026
Watch forDoosan builds NuScale vessel tops
2
openSiting
Siting is choosing where a reactor goes and showing that the place suits it: the ground, water and weather, the people nearby, and the plans for an emergency.
5 · 3 · 2
Last achievedEmergency zones sized by dose2023
Watch forReactors nearer to towns
2
openCost
This work estimates and tracks what a small reactor costs to build and run, and why the figures change between the first unit and later ones.
5 · 1 · 2
Last achievedDarlington's first budget breaks2026
Watch forLater units a third cheaper
2
openWaste
Waste work plans what a small reactor's spent fuel and other radioactive leftovers will be, and how they are stored, moved and finally disposed of.
5 · 1 · 2
Last achievedVolume is the wrong measure2024
Watch forRecycling for small reactors
2
open
Advances to build with
1 research note
Open in small modular reactors
3 of 14 open deliverables
Open · Reactor designs
Rerun the HTR-PM cooling test
An independent computer model of the HTR-PM, built only from published design data, that predicts what Tsinghua measured in its two 2023 loss-of-cooling tests: how fast power fell and how hot the core and reactor vessel became, compared against the curves Tsinghua published.
Built with what exists
OpenMC, an open-source code that simulates neutrons in a reactor core; the open-source MOOSE framework from Idaho National Laboratory for heat flow; WebPlotDigitizer, a free tool that turns published graphs into numbers; one workstation.
Open · Fuel
Map fuel needs against supply
A public ledger that lists, for every small reactor and microreactor project with a public filing, the HALEU its first core and its yearly reloads need, in kilograms of uranium, and sets the total year by year against each announced source: DOE stockpiles, Centrus, General Matter, Urenco and Orano. Every figure links to its source.
Built with what exists
NRC and Canadian Nuclear Safety Commission filings; DOE and GAO reports; company announcements; a language-model agent that pulls each figure with its page reference; Python; two people who check every figure.
Open · Licensing
A ledger of granted exemptions
An open table of every exemption the NRC has granted to small and advanced reactor applicants since 2016, one row per exemption, giving the rule it sets aside, the reason stated, the docket, the date and the Federal Register notice. An exemption is permission not to meet one specific rule; the pattern of them shows which rules do not fit small reactors.
Built with what exists
the Federal Register API (federalregister.gov/api/v1, free, no key); the regulations.gov API; a language model to pull the rule section and stated reason out of each notice; two people to check its output.
Where it sits
Broader
In outline