Small modular reactors

The small modular reactor industry designs, licenses and builds nuclear reactors of about 300 MW of electricity or less, made largely in factories and shipped to their sites.

1957

On 8 April 1957 SM-1, a two-megawatt "package" reactor the US Army built at Fort Belvoir, Virginia, to test small power plants for remote places, reached criticality; the National Museum of the United States Army calls it the first nuclear reactor in the United States connected to a public utility grid.

thenmusa.org

38

Milestones achieved across 7 domains.

13

To watch for: announced, not yet confirmed outside.

14

Open deliverables. Nobody has shipped them.

In one minute

Where it started

The first small reactors were built for the US military in the 1950s: the reactor that drove the submarine Nautilus from 1955, and the Army's SM-1, which reached criticality in 1957 and was followed by seven more Army plants, several of them shipped in pieces to Greenland, Alaska and Antarctica. Civilian reactors then grew to 1,000 MW and more, on the expectation that bigger plants would be cheaper. A 1986 Energy Information Administration study of 67 US plants found that the saving from size was lost to longer construction.

Where it stands

Few small reactors of the new kind are running. Russia's floating Akademik Lomonosov has supplied the Arctic town of Pevek since 2019, and China's HTR-PM, two pebble-bed modules driving one turbine, entered commercial operation in December 2023. NuScale's design was certified in the United States in 2023, the same year its first project was cancelled when the expected power price rose to $89 per MWh. Canada licensed construction of a BWRX-300 at Darlington in 2025 and the US issued three construction permits in 2026, but in November 2026 Ontario Power Generation said its first unit would miss both its 2030 date and its budget.

What is open

The facts a newcomer needs to compare designs sit in separate filings: how much fuel each one needs, what waste it leaves, how large its emergency zone is, which rules it was excused from, and what it was expected to cost against what it cost. Most open deliverables here gather those public records into checked tables, or rerun published tests with open computer models. None involves nuclear material.

Domains

AchievedWatch forOpen

Advances to build with

1 research note

Open in small modular reactors

3 of 14 open deliverables

Open · Reactor designs

Rerun the HTR-PM cooling test

An independent computer model of the HTR-PM, built only from published design data, that predicts what Tsinghua measured in its two 2023 loss-of-cooling tests: how fast power fell and how hot the core and reactor vessel became, compared against the curves Tsinghua published.

Built with what exists

OpenMC, an open-source code that simulates neutrons in a reactor core; the open-source MOOSE framework from Idaho National Laboratory for heat flow; WebPlotDigitizer, a free tool that turns published graphs into numbers; one workstation.

Credit · unclaimed

Open · Fuel

Map fuel needs against supply

A public ledger that lists, for every small reactor and microreactor project with a public filing, the HALEU its first core and its yearly reloads need, in kilograms of uranium, and sets the total year by year against each announced source: DOE stockpiles, Centrus, General Matter, Urenco and Orano. Every figure links to its source.

Built with what exists

NRC and Canadian Nuclear Safety Commission filings; DOE and GAO reports; company announcements; a language-model agent that pulls each figure with its page reference; Python; two people who check every figure.

Credit · unclaimed

Open · Licensing

A ledger of granted exemptions

An open table of every exemption the NRC has granted to small and advanced reactor applicants since 2016, one row per exemption, giving the rule it sets aside, the reason stated, the docket, the date and the Federal Register notice. An exemption is permission not to meet one specific rule; the pattern of them shows which rules do not fit small reactors.

Built with what exists

the Federal Register API (federalregister.gov/api/v1, free, no key); the regulations.gov API; a language model to pull the rule section and stated reason out of each notice; two people to check its output.

Credit · unclaimed

Where it sits