Industries / Industrial equipment and services / IoT and industrial automation
SCADA integration
SCADA integration is the work of building and connecting the systems, from the equipment at unattended sites to the control room software and the databases behind it, that let operators watch and control plants, pipelines, power grids and water networks from a distance.
1921
The name "supervisory control" was given to the first commercial remote-control system, which Westinghouse built with North Electric relays for the automatic substations of the Cleveland Railway Company, according to Westinghouse's engineering magazine.
33
Milestones achieved across 7 domains.
13
To watch for: announced, not yet confirmed outside.
15
Open deliverables. Nobody has shipped them.
In one minute
Where it started
In the 1920s electric railways and city power companies ran automatic substations that nobody staffed, and their dispatchers wanted to see and switch them from one office. Roy J. Wensley of Westinghouse proposed in 1920 to borrow the selector relays of the dial telephone, and the system built for the Cleveland Railway sent coded pulses over a few telephone wires and had the dispatcher check each selection before a breaker moved. Computers took over the control room end from the 1960s, and ABB dates the arrival of systems called SCADA (supervisory control and data acquisition), with energy management systems for power grids, to the 1970s.
Where it stands
Grids, pipelines, water networks and oil fields are now run through remote terminal units that report over open protocols such as DNP3, IEC 60870-5-104 and MQTT, to control room software and historians that keep years of readings, linked to business systems along the levels of the Purdue model and ISA-95. The links that tie these systems together are also how attackers reach them: in 2024 US agencies reported a group they call Volt Typhoon waiting in the business networks of water and energy companies next to their control systems, and in December 2025 attackers used a default account to disable the remote terminal units at at least 30 Polish wind and solar farms. The links themselves end on carriers' timetables, as US 3G networks did in 2022 and UK copper phone lines are due to in January 2027.
What is open
Much of what is open is measurement nobody has published: how SCADA traffic fares over satellite links, how long alarm call-outs take to reach the person on call, what remote terminal units do when their clocks pass 2038, and how many mapping errors a migration leaves behind. AI agents are being built into SCADA software, historians and migration tools, and the figures for them so far are their makers' own, so outside tests of what they read, change and miss are open too.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Remote sites and telemetry
This is the equipment at unattended sites, chiefly the remote terminal unit (RTU), a rugged computer that reads instruments and works switches and valves, and the phone, radio, cellular or satellite links and message rules that connect it to a control room.
5 · 2 · 2
Last achievedTelecontrol moves to TCP/IP2000
Watch forCellular IoT from satellites
2
openControl room screens
Control room screens are the software and displays from which operators watch distant wells, pumps, valves and substations and send them commands.
4 · 1 · 2
Last achievedA platform run from shore2019
Watch forAgents brief grid operators
2
openAlarms
Alarms on a SCADA system tell a control room, or a person on call at home, that something at a distant site needs attention.
4 · 1 · 2
Last achievedCounting lost control tools2017
Watch forAI reads grid alarm floods
2
openStoring plant data
Historians are the databases that keep every reading a SCADA system collects, often for years, so that engineers can look back at what happened and analysts can work from the record.
4 · 2 · 2
Last achievedA cloud historian retires2024
Watch forPlain-language questions to plant data
2
openConnecting to business systems
This work links SCADA to the software that plans production, schedules maintenance and bills customers, and to other companies' control centres.
5 · 2 · 2
Last achievedEurope's grid models, one format2021
Watch forAI agents reach SCADA data
2
openSecurity
Security is the work of keeping attackers out of SCADA systems, the remote links that tie them to distant sites and the business networks around them, and of noticing when they get in.
7 · 3 · 3
Last achievedDefault logins on wind farms2025
Watch forAn agent finds control-software flaws
3
openUpgrades
This is the work of replacing a SCADA system's computers, software and links before they lose support, and of changing a running system without losing sight of the plant.
4 · 2 · 2
Last achieved3G networks switch off2022
Watch forAI migrates old screens
2
open
Advances to build with
2 research notes

Gemini 4 Carbon
Cyber defenders first
Google says cyber defenders got Gemini 4 Carbon first, and its 88.2% flaw-finding score is Google's own run on a 183-task subset with guardrails off.

Mistral Large 4
A trillion open parameters
Mistral published its Large 4 AI model, a trillion numbers by its count, free to download and sell, though firms that rent out models need a separate license.
Open in scada integration
3 of 15 open deliverables
Open · Remote sites and telemetry
SCADA traffic over satellite IoT
A side-by-side field test at one remote site that sends the same SCADA traffic, regular readings and exception reports in both DNP3 and MQTT, over satellite NB-IoT, ground-based NB-IoT or LTE-M, and LoRaWAN for 90 days, logging every message's delivery, delay and energy use.
Built with what exists
A satellite IoT development kit such as Myriota's HyperPulse Developer Kit, or the commercial NB-IoT satellite modems Richter used on Skylo's network; LTE-M modules; a LoRaWAN gateway with The Things Stack, an open-source network server; Eclipse Mosquitto, an open-source MQTT broker; Step Function I/O's open-source dnp3 library; a DC power logger.
Open · Control room screens
A test of reading screens
A public test set of SCADA screens with the questions an operator answers at a glance (which pumps are running, which tank is highest, which site alarmed last, which value has stopped updating), and published scores for AI models that read images.
Built with what exists
FUXA, an open-source web-based SCADA and HMI program (MIT licence), to build screens; EPANET, the US Environmental Protection Agency's free pipe network model, run through its Python package WNTR, to drive the values; AI models that read images, such as Claude or Gemini.
Open · Alarms
Call-out delays, measured
A month-long public test of how long SCADA alarm call-outs take to reach an on-call person, and how many never arrive, by text message, voice call, email and app notification, on at least three mobile networks.
Built with what exists
An open SCADA package that sends alarms, such as FUXA; a cellular modem and a messaging service such as Twilio; phones on three carriers; a script that time-stamps each send and receipt.