Industries / Energy, water and waste / Electric transmission and distribution
EV charging infrastructure
The EV charging industry builds, connects, runs and repairs the chargers and battery-swap stations that refill electric cars, buses and trucks at homes, workplaces, depots and public sites, and sells electricity through them.
1897
In New York, Henry Morris and Pedro Salom's Electrobat cabs began carrying paying passengers in March 1897, served by a station in a former ice rink on Broadway where an overhead crane swapped a cab's flat battery for a charged one in about three minutes.
47
Milestones achieved across 7 domains.
14
To watch for: announced, not yet confirmed outside.
15
Open deliverables. Nobody has shipped them.
In one minute
Where it started
Charging began with the first electric taxis and trucks: a New York cab company swapped batteries by crane in 1897, and in 1900 General Electric showed a coin-operated "electrant" that sold a 2½ kWh charge for 25 cents. Gasoline cars took over, and charging came back with California's zero-emission rules, where two plugs that did not fit each other split the market until the state chose one in 2001. Japan's CHAdeMO fast-charging protocol (2010), Tesla's Superchargers (2012) and the Combined Charging System (2012) laid out today's fast charging, while Better Place's bankruptcy in 2013 showed that battery swapping needs many cars to share one battery design.
Where it stands
By the International Energy Agency's count there were more than 7 million public charging points in the world at the end of 2025, about 1.8 million of them added that year, and more than 65% of them in China; the United States had 3% of the points against 10% of the world's electric cars and vans. Three plug families lead: CCS in Europe, GB/T in China, and Tesla's design, now the standard SAE J3400, in North America. Reliability has become a legal duty, with 97% uptime required at federally funded US chargers and 99% across each UK rapid network, after a 2022 field test in the San Francisco Bay Area found only 73.3% of fast-charging ports working.
What is open
Laws in the EU, the UK and California now make operators and utilities publish prices, live charger status and hookup times, but almost nobody checks those feeds against what operators and utilities claim. Many open jobs are such checks: recomputing reliability, scoring price data, timing grid hookups, and counting holiday queues, swap stations and truck chargers. Others belong on a lab bench: testing adapters that must report overheating, and robot arms that plug in a car, which robot models that learn from a few demonstrations now make worth trying.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Charger hardware
Charger hardware is the equipment itself: the plug on the cable, the socket on the car, the electronics that turn grid power into what a battery can take, and the standards that let one car use many chargers.
7 · 2 · 2
Last achievedAdapters fail heat tests2025
Watch forWireless charging while driving
2
openHome and workplace charging
Home and workplace charging is the slow charging done where cars sit for hours: in house garages and driveways, apartment parking garages, on streets outside homes, and in office parking lots.
7 · 2 · 2
Last achievedEurope wires its parking2024
Watch forWireless charging at home
2
openPublic fast charging
Public fast charging is the work of building and running direct-current (DC) chargers that refill a car in well under an hour, along highways and in cities, and stations that swap a flat battery for a full one.
7 · 2 · 2
Last achievedOne hundred million swaps2026
Watch forBYD's 20,000 megawatt stations
2
openFleet and depot charging
Fleet and depot charging powers buses, delivery vans, trucks and taxis, mostly overnight at the yard where they park and sometimes on the route, at power levels that now reach more than 1 megawatt (MW).
5 · 3 · 2
Last achievedMegawatt plugs for trucks2025
Watch forEurope's first megawatt corridor
2
openSites and grid connection
Sites and grid connection is the work of choosing where chargers go, getting enough electricity to them from the local utility, and managing that power once it arrives: paying for it, storing it in batteries on site and, in some places, sending it back from parked vehicles.
7 · 2 · 3
Last achievedBattery chargers outlive their maker2025
Watch forFlexible hookups in California
3
openPayment and software
Payment and software is how drivers find a charger, start a charge and pay for it, and the software that links each charger to the company that runs it, to other networks and to drivers' apps.
7 · 2 · 2
Last achievedCard readers across Europe2024
Watch forA shared certificate list
2
openUptime and repair
Uptime and repair is the work of keeping public chargers working: measuring how often they fail, setting rules for reliability, training the technicians who fix them, and guarding them against vandals and thieves.
7 · 1 · 2
Last achievedUptime and success diverge2025
Watch forUK networks report 99%
2
open
Advances to build with
2 research notes

NVIDIA GR00T 2
Five demonstrations per task
By NVIDIA's own test, its robot model GR00T 2 averages 95% success after five demonstrations of a task, on 50 tasks picked from those it learns that way.

Cursor Agent SDK
Findings that cite notes
Cursor released a kit for building AI agents, and its example, a code reviewer that cites the note behind each finding, is known only from Cursor's account.
Open in ev charging infrastructure
3 of 15 open deliverables
Open · Charger hardware
Adapters tested after the standards
A public bench test of the NACS-to-CCS and CCS-to-NACS adapters on sale in 2026, after the first edition of UL 2252 (March 2025) and SAE J3400/1, checking whether each one reports heat the way J3400 requires. Each adapter is warmed slowly in a lab oven with no charging current flowing, while a low-voltage circuit reads its proximity pin, the signal wire that tells the car an adapter is plugged in and, under J3400, that it is getting too hot. The test records the temperature at which the "thermal warning" and "thermal shutdown" signals appear and compares it with the standard. The same table checks each adapter's claimed certification against the certifier's public directory. This tests the warning signal, not how hot the adapter runs under current.
Built with what exists
A benchtop oven or temperature chamber with a thermocouple logger; a low-voltage proximity circuit built to the values in SAE J3400/1 (the April 2026 laboratory slides list nominal proximity voltages from 4.46 V for "disconnected" to 0.63 V for "DC thermal shutdown"); a USB data logger; certifiers' online directories, such as UL Product iQ.
Open · Home and workplace charging
Check chargers against owners' logs
An open study in which owners of home chargers in Great Britain donate their charger app's session history and screenshots of the settings the charger came with, and a script checks, model by model, whether the default schedule kept out of the weekday peaks of 8 to 11 am and 4 to 10 pm and whether scheduled sessions started after the random delay of up to 10 minutes that the 2021 regulations require.
Built with what exists
The session exports that many charger apps offer; a consent form that strips names and addresses; a vision-language model that reads settings screenshots into fields, with each reading checked by a person; Python for the timing analysis; Ricardo's 2023 model list as the frame.
Open · Public fast charging
Holiday queues, measured openly
A logger that records, every minute through a holiday weekend, whether each fast charger at every UK motorway charging hub is free, charging or out of order, and an open report of how many hours each hub had no free working charger.
Built with what exists
The UK's open charge point data, which operators must publish free, machine-readable and without terms of use, with each charger's status updated within 30 seconds of a change, under regulation 10 of the Public Charge Point Regulations 2023; a small server that polls the feeds; Python for the analysis.