Industries / Energy, water and waste / Electric transmission and distribution / EV charging infrastructure
Sites and grid connection
Sites and grid connection is the work of choosing where chargers go, getting enough electricity to them from the local utility, and managing that power once it arrives: paying for it, storing it in batteries on site and, in some places, sending it back from parked vehicles.
7
Milestones achieved, from 1911 to 2025.
2
To watch for: announced, not yet confirmed outside.
3
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1911
Power companies host chargers
A list of charging stations in Massachusetts, printed in the Boston Globe on 10 December 1911, showed that most of them were provided by electric utilities and town-owned power plants. Brookline's eight stations, second only to Boston's fourteen, were all in commercial garages, as were all but one of Boston's.
Credit
Massachusetts electric utilities and municipal power plants; the list was retold by Ken Liss of the Brookline Historical Society
2014
California reopens utility charging
In July 2011 the California Public Utilities Commission (CPUC) barred the utilities it regulates from owning charging equipment, except for their own fleets and workplaces, finding the benefits "speculative" next to the harm to competition. Its decision D.14-12-079 of December 2014 dropped the rule that a utility must first prove a market failure, and in 2016 it approved charging pilots of up to $22 million at Southern California Edison (SCE), $45 million at San Diego Gas & Electric (SDG&E) and $130 million at Pacific Gas and Electric (PG&E).
LessonWho may own the equipment between the grid and the plug is a policy choice, and California reversed its first answer within three years.
Credit
CPUC
2016
The grid pays parked vans
Vehicle-to-grid (V2G) means a parked vehicle's battery sends power back to the grid when the grid operator asks for it. In August 2016 ten Nissan e-NV200 vans owned by Frederiksberg Forsyning, a Danish utility, began selling capacity to Energinet, Denmark's grid operator, through ten 10 kW Enel chargers that can push power both ways, run by Nuvve's software. Nissan calls it the "world's first fully commercial vehicle-to-grid hub," meaning every part could be bought off the shelf. The University of Delaware, whose V2G work Nuvve licensed, calls its own 2013 project with NRG on its STAR Campus the world's first revenue-generating V2G project; that project followed a 2007 public demonstration at PJM, the mid-Atlantic grid operator, in which a converted car stored or supplied power as the grid needed.
Credit
Nissan, Enel, Nuvve, Frederiksberg Forsyning; Willett Kempton's team at the University of Delaware
2019
Subscriptions replace demand charges
A demand charge bills a business for its single highest burst of power in a month, on top of the energy it uses. A National Renewable Energy Laboratory (NREL) study of more than 7,500 US commercial and industrial electricity rates for 2017, published in 2019, found that electricity for DC fast charging could cost over 2 dollars per kilowatt-hour, that the main cause was low use, and that low use raised costs most under rates with demand charges. In October 2019 the CPUC approved PG&E's business EV rate, which replaces the demand charge with a monthly subscription for a chosen block of kilowatts plus a fee for going over it.
LessonA charge set by a site's busiest moment can cost more than the energy itself while chargers are new and seldom used.
Credit
Matteo Muratori, Eleftheria Kontou and Joshua Eichman (NREL); PG&E; CPUC
2020
Upgrades shared across customers
Make-ready is the wiring, conduit, transformer and other work that brings power to the spot where a charger will stand. In July 2020 New York's Public Service Commission let the state's investor-owned utilities collect up to $701 million from customers to pay 50% or 90% of make-ready costs at public charging sites, and up to 100% in disadvantaged communities, aiming at more than 50,000 Level 2 plugs and 1,500 DC fast-charging stations; in November 2023 it raised the budget to $1.24 billion and the fast-charging target to 6,302 stations. Great Britain went further for all new demand: under a decision by Ofgem, the energy regulator, published on 3 May 2022, from 1 April 2023 most customers connecting new demand to a local network, charging sites included, no longer pay for upgrades to the shared network, which the network company funds and recovers through its charges to all users, up to a cap of £1,720 per kVA. Ofgem said the change would allow more efficient network development, "including for electric vehicle and heat pump adoption."
Credit
New York State Public Service Commission; Ofgem
2024
Deadlines for grid hookups
California's Powering Up Californians Act of 2023 (bills SB 410 and AB 50) told the CPUC to set target times for connecting new loads to the grid. Its decision D.24-09-020 of September 2024 gave PG&E, SCE and SDG&E an average of 182 and a maximum of 335 calendar days for projects on their EV infrastructure tariffs, counting only the steps under the utility's control, set maximums of about 2 years for a new or upgraded circuit and about 9 years for a new substation, and made the utilities report twice a year. In its March 2026 report PG&E put its EV-tariff projects at 111 days on average for its own steps, but 560 days from first request to power on.
Credit
California Legislature; CPUC
2025
Battery chargers outlive their maker
Some fast chargers hold a battery that fills slowly from a weak grid connection and empties quickly into a car. FreeWire Technologies of California, which made such chargers with 160 kWh batteries, filed a state notice in spring 2024 that it would close its headquarters and end its staff's jobs on 24 June, and British Columbia's safety regulator later wrote that it "ceased operation in 2024." A charging site in Hope, BC, whose FreeWire units had been rewired in the field without the certifier's approval, swapped them for grid-only chargers in July 2025; one, stored outdoors still about 70 to 80% charged with no battery management running, caught fire on 24 November 2025 and reignited three times over 90 minutes.
LessonA battery inside a charger needs its maker's support for its whole life and a plan to discharge it before it is moved.
Credit
FreeWire Technologies; investigated by Technical Safety BC
Watch for
Flexible hookups in California
A flexible service connection lets a site connect before the grid upgrades it needs are built, if it accepts a cap on the power it draws, either fixed in advance or managed live by the utility's control software. The CPUC's decision D.26-02-025 of February 2026 sets up flexible connections as a standard offer and adds them to the utilities' twice-yearly reports; the proposed version named PG&E and SCE and noted that PG&E had issued similar "load limit letters" since mid-2023.
Achieved whenthe utilities' reports show charging sites connected under the option, with the power granted and the months saved against waiting for a full upgrade, and an outside reviewer confirms the figures.
Claimed by
CPUC, February 2026
PG&E says it meets targets
In its March 2026 report PG&E said 97% of its projects finished within the state's maximum times and 89% within the average, and that 90% of its EV-tariff projects beat the average. At the CPUC's June 2026 workshop the Interstate Renewable Energy Council (IREC), a clean-energy nonprofit, reported that the three utilities compute these figures in different ways, that only SCE's could be fully reproduced from its raw data, that PG&E leaves the intake step (median about 57 to 59 days) out of the customer's share of the time, and that 28.4% of PG&E's 4,444 commercial projects still in progress had already overrun the maximum for a step.
Achieved whenan independent recalculation from the raw data, using one method for all three utilities, confirms the share of EV projects connected within the targets.
Claimed by
PG&E, March 2026
Open
01
EV hookup times, one method
A public tracker of how long California's three large utilities take to connect EV charging sites, recomputed from the project-level spreadsheets they file twice a year. Use one method for all three: days in each of the eight steps the CPUC defined, the utility's time and the customer's time, total time from request to power on, and projects still waiting, for projects on the EV infrastructure tariffs (Rule 29 at PG&E and SCE, Rule 45 at SDG&E).
The briefCredit · unclaimed02
Score load maps against outcomes
A test of whether utilities' load hosting capacity maps, which show how much new demand each stretch of the local grid can take without upgrades, predicted where fast-charging sites could connect. For each DC fast-charging site opened in one utility's territory, record what the map showed for that circuit before the site opened and compare it with the site's charging power.
The briefCredit · unclaimed03
A ledger of V2G exports
A public table of vehicle-to-grid projects that gives, for each, the energy its vehicles actually sent back to the grid, over what period, for which grid services and for what payment, next to what was forecast at launch, with every figure linked to a regulator filing, grid-operator record or published report, and "not published" where nothing is.
The briefCredit · unclaimed
Open 01 · the brief
EV hookup times, one method
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public tracker of how long California's three large utilities take to connect EV charging sites, recomputed from the project-level spreadsheets they file twice a year. Use one method for all three: days in each of the eight steps the CPUC defined, the utility's time and the customer's time, total time from request to power on, and projects still waiting, for projects on the EV infrastructure tariffs (Rule 29 at PG&E and SCE, Rule 45 at SDG&E).
Why it is still open
The utilities report against the 2024 targets, and IREC and the CPUC's consultant Guidehouse analyzed the data for the proceeding across all tariffs. But at the CPUC's June 2026 workshop IREC showed that the three utilities compute their headline figures differently, that only SCE's could be reproduced in full, and that the reports do not say which projects are chargers outside the EV tariffs, how many ports they have, or where they are. PG&E's EV-tariff projects average 111 days for its own steps and 560 days end to end by its own count.
Built with what exists
The utilities' Excel data reports posted by the CPUC; Python with pandas; a coding agent to write and test the parsing code; an agent that cites the file and row behind each figure (see the Note "Findings that cite notes").
First step
Download the September 2025 and March 2026 data reports, keep the Rule 29 and Rule 45 rows, and try to reproduce PG&E's 111-day and 560-day figures.
Done looks like
For each utility and each filing since March 2025, EV-tariff averages recomputed with one published method, each matching the utility's reported figure or with every gap above 5% explained, with code and tables public and refreshed within a month of each new filing.
Open 02 · the brief
Score load maps against outcomes
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A test of whether utilities' load hosting capacity maps, which show how much new demand each stretch of the local grid can take without upgrades, predicted where fast-charging sites could connect. For each DC fast-charging site opened in one utility's territory, record what the map showed for that circuit before the site opened and compare it with the site's charging power.
Why it is still open
Atlas Public Policy's December 2024 report, based on interviews with charging developers and utilities, counts 58 utilities in 26 states publishing such maps, says areas the maps show as having room can turn out to need "costly and years-long upgrades" because most maps leave out higher-voltage sub-transmission limits, and quotes a developer saying only the utility can really know how accurate a map is. IREC reported in 2020 that California utilities' first system-wide results, in January 2019, showed zero room for new load in 60 to 70% of their results, which IREC judged implausible. NREL and IREC's 2022 guidance sets out how utilities should validate the maps, but no published test against what sites actually got was found; published studies model hosting capacity rather than score the maps.
Built with what exists
The utility's published map layers; the US Department of Energy's station list through its API, which gives each site's open date, number of fast-charging ports and power in kilowatts; QGIS or GeoPandas to match sites to circuits; a scheduled script that saves a dated copy of the map each month.
First step
Start saving a dated copy of one utility's load map this month, and pull that territory's fast-charging sites with their open dates and power from the station list.
Done looks like
For at least 200 DC fast-charging sites in one utility territory, a public table of map capacity before opening against site power, the share of sites where the map showed enough room, and the method, followed by monthly map copies so that new sites can be scored against what the map showed beforehand.
Open 03 · the brief
A ledger of V2G exports
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of vehicle-to-grid projects that gives, for each, the energy its vehicles actually sent back to the grid, over what period, for which grid services and for what payment, next to what was forecast at launch, with every figure linked to a regulator filing, grid-operator record or published report, and "not published" where nothing is.
Why it is still open
The V2G Hub lists 157 projects with more than 12,200 chargers in 27 countries, with each project's dates, charger count and services, but its project data has no field for energy returned. A 2023 review of V2G trials worldwide for ClimateXChange, a Scottish research center, by the consultancy ERM lists each trial with a description and a source, not the energy it exported. The best-known US fleet, Zum's 74 electric school buses with bidirectional chargers in Oakland, was launched in August 2024 with Zum's claim of 2.1 GWh a year back to the grid; neither PG&E's account nor Electrek's reports a measured figure.
Built with what exists
The V2G Hub's project list as a starting roster; regulator dockets such as the CPUC's filings for PG&E's vehicle-grid integration pilots and SDG&E's V2G school bus pilot; grid operators' market records; an agent that reads filings and cites the page behind each number (see the Note "Findings that cite notes").
First step
Copy the V2G Hub's project list and search the CPUC's records for the reports of the vehicle-grid integration pilots it funded in 2019 and 2022.
Done looks like
At least 30 projects in at least five countries, each with measured exported energy in megawatt-hours and the period it covers or a dated "not published" entry, every figure linked to its source, and a column comparing measured with forecast where both exist.