Industries / Energy, water and waste / Electric transmission and distribution / EV charging infrastructure
Fleet and depot charging
Fleet and depot charging powers buses, delivery vans, trucks and taxis, mostly overnight at the yard where they park and sometimes on the route, at power levels that now reach more than 1 megawatt (MW).
5
Milestones achieved, from 1897 to 2025.
3
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1897
Cabs that swap batteries
In March 1897 Henry Morris and Pedro Salom's Electrobat cabs began carrying passengers in New York, and by August the 12 cabs had covered more than 14,000 miles and carried nearly 5,000 passengers. At their station in a former ice-skating rink on Broadway, an overhead crane lifted out a cab's 1,250-pound battery and put in a charged one in about three minutes, and the fleet grew to more than 100 cabs by 1899 under the Electric Vehicle Company, National Geographic reports.
LessonThe swap station worked but the company failed on its finances, after an 1899 loan scandal, a fire and the Panic of 1907, while a gasoline taxi company grew from 65 to 700 cabs in about a year from 1907.
Credit
Henry Morris and Pedro Salom; Electric Vehicle Company
1912
Batteries rented by the mile
In 1912 the Hartford Electric Light Company in Connecticut began a service for electric trucks made by the General Vehicle Company: the utility looked after the batteries, kept the trucks in order through a garage company it set up, and charged a fixed monthly fee plus a rate per mile read from an approved odometer. By 1918, 96 trucks ran under the plan in a town of about 100,000, and Boston's Edison Electric Illuminating Company ran a similar service in which a flat battery could be swapped for a charged one at its stations within five minutes, the British trade weekly Commercial Motor reported.
Credit
Hartford Electric Light Company; Edison Electric Illuminating Company of Boston
2017
A city's buses all electric
Shenzhen announced at the end of 2017 that all 16,359 of its buses were electric, which the World Resources Institute (WRI), a research group, calls the world's first fully electric bus fleet. Operators charged every bus fully overnight when electricity was cheap and topped up at terminals at quiet times, with one charging outlet for every three buses, and opened the chargers to private cars to earn more from them.
Credit
the Shenzhen city government and its bus operators
2023
Trucks that swap batteries
About one-third of the battery electric heavy trucks sold in China in each of 2023, 2024 and 2025 could swap batteries, and Europe's first fully automated swap station for heavy electric trucks opened in Germany in 2023, the IEA reports. A truck station holding twenty-four 171 kWh packs carries about $440,000 of batteries at 2025 prices, by the IEA's estimate.
Credit
Chinese truck makers and swap operators, with shared designs such as CATL's #75 truck battery
2025
Megawatt plugs for trucks
SAE International issued J3271, its report on the Megawatt Charging System (MCS), on 5 March 2025, covering the plug, cables and cooling, communication, grid connection and interoperability testing. The month before, Milence, a joint venture of Daimler Truck, the TRATON Group and Volvo Group, put two MCS chargers made by Power Electronics into public use at the Port of Antwerp-Bruges, rated up to 1,440 kW (1,500 A at 1,000 V). The IEA counted more than 40 chargers faster than 1 MW in the EU by 2026 and reports that ABB, Alpitronic and Kempower launched MCS chargers in 2025.
Credit
SAE International; Milence; Power Electronics
Watch for
Europe's first megawatt corridor
Milence says that with megawatt charging added at Landvetter, near Gothenburg, in June 2025 it is close to finishing a route of more than 1,500 km from Antwerp to Stockholm with MCS chargers along it, and it has committed to at least 284 MCS charging points at 71 sites in 10 EU countries by 2027 under the EU's Alternative Fuels Infrastructure Facility. No report that the corridor is complete was found.
Achieved whenan outside count, such as the EU's European Alternative Fuels Observatory, shows the Antwerp to Stockholm hubs and at least 284 MCS points in public service.
Claimed by
Milence, June 2025
China's truck charging plan
Eleven Chinese government agencies set a goal in June 2026 for new-energy trucks to make up 40% of registrations of trucks over 12 metric tons by 2030, and plan about 3,000 charging and battery swap stations for them and 30,000 km of carbon-neutral freight corridors on key motorways, electrive reported, citing CnEVPost.
Achieved whenan official or independent count shows 3,000 such stations in service.
Claimed by
Chinese central government agencies, June 2026
Germany's public truck network
Under its 2024 "Power to Road" plan, Germany has tendered 350 charging stations for heavy trucks with 2,400 ultra-fast and 1,800 megawatt charging points, and the European Commission approved 1.6 billion euros of state funding for them in December 2025; at the start of 2026 Germany had about 70 truck charging stations with 270 points, the IEA reports.
Achieved whenthe 350 stations are open and counted by an outside party such as the European Alternative Fuels Observatory.
Claimed by
German federal government, 2024 to December 2025
Open
01
Count China's truck chargers
An open, station-level table of public charging and swap stations for heavy trucks in China, with operator, province, location, number of charging points, rated power and plug or swap, updated every quarter, each row linked to the notice or operator release it came from.
The briefCredit · unclaimed02
Check depot planners against reality
A test of free bus-depot planning software against real depots: feed each tool a transit agency's published timetable and bus data, and compare the tool's predicted number of chargers and peak power with what the agency built and reported.
The briefCredit · unclaimed
Open 01 · the brief
Count China's truck chargers
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open, station-level table of public charging and swap stations for heavy trucks in China, with operator, province, location, number of charging points, rated power and plug or swap, updated every quarter, each row linked to the notice or operator release it came from.
Why it is still open
The IEA says truck charging in China "is not as closely monitored" as in Europe, where the EU's observatory and the eTrucker app track it, and that estimates of China's public heavy-truck charging stations "vary between 5 000 and 9 000." Searches for an open station list found only single-province figures.
Built with what exists
Provincial energy and transport bureau notices; announcements from operators such as State Grid, TELD, Huawei and CATL; machine translation; an AI agent that reads Chinese-language releases and records each figure with the page it came from (see the Note "Findings that cite notes").
First step
Collect this year's notices from three freight-heavy provinces and build the table format on them.
Done looks like
At least 5,000 stations listed with a source each, totals by province, a written comparison with the IEA's 5,000 to 9,000 range, and a random 100 rows checked against a second source with the match rate published.
Open 02 · the brief
Check depot planners against reality
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A test of free bus-depot planning software against real depots: feed each tool a transit agency's published timetable and bus data, and compare the tool's predicted number of chargers and peak power with what the agency built and reported.
Why it is still open
Free tools now exist. GTFS4EV is an open-source Python tool that simulates bus operations and charging from GTFS timetable data, and WeBus, released in August 2026 by Berlin's transit operator BVG with TU Berlin and the Reiner Lemoine Institute, compares battery sizes and depot charging setups. Tools like these are used to plan: in April 2026 the ICCT used a simulation tool to size depot charging for São Paulo's network of about 13,300 buses, a plan for the future rather than a check against depots already built. No published comparison of such tools' outputs with depots as built was found. The IEA notes that poorly planned depot charging can raise peak power demand and lengthen grid connection times.
gtfs4ev.github.ioreiner-lemoine-institut.detheicct.orgcleanenergyministerial.org
Built with what exists
GTFS4EV and WeBus; transit agencies' public GTFS feeds (GTFS is the standard timetable format agencies publish for trip planners); agency board papers and grant reports that state each depot's charger count and grid capacity.
First step
Find three agencies that publish both a GTFS feed and a depot electrification report, and run GTFS4EV on one of their depots.
Done looks like
Ten depots in at least three countries, each with the tools' predictions and the as-built figures side by side, the error in peak kW and charger count reported, and all inputs and code public.