Uptime and repair is the work of keeping public chargers working: measuring how often they fail, setting rules for reliability, training the technicians who fix them, and guarding them against vandals and thieves.

7

Milestones achieved, from 2013 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 2013

    Repairs stall in bankruptcy

    ECOtality, owner of the Blink charging network in the US, filed for bankruptcy in September 2013, and its service requests went unfinished during the proceedings. Car Charging Group bought more than 12,450 Blink Level 2 chargers and 110 fast chargers and said two months later that it had restored "more than 200 highly-utilized" public stations using a national network of electricians.

    LessonA charger keeps working only as long as someone is paid and able to repair it.

    prnewswire.com

    Credit

    Car Charging Group

  2. 2022

    One in four failed

    D. Rempel and colleagues tried every open public fast-charging port with a CCS plug in the nine-county San Francisco Bay Area, 655 ports at 182 stations, and counted a port as working if it charged a car for 2 minutes. Only 73.3% worked: 23.5% had blank screens, error messages, payment or network failures or broken connectors, and at 3.2% the cable was too short to reach the car. The authors noted this "conflicts with the 95-98% uptime" the networks reported, and called for verifiable definitions of uptime.

    LessonA network's own uptime figure can hide what a driver meets at the charger.

    ebi.ac.uk

    Credit

    D. Rempel, C. Cullen, M. Matteson Bryan and G. Vianna Cezar; study posted in 2022 and published in Human Factors

  3. 2023

    US sets 97% uptime

    The Federal Highway Administration's rule of 28 February 2023 requires every federally funded charging port to be up more than 97% of the year on average, counted minute by minute, with outages from grid failures, the car's fault, scheduled maintenance, vandalism or natural disasters excluded; electricians who install and maintain the chargers must hold the Electric Vehicle Infrastructure Training Program (EVITP) certificate or have finished a registered apprenticeship with charger training. California's Energy Commission adopted its own rules in October 2025, in force from 1 April 2026, setting a 97% uptime standard for state- or ratepayer-funded fast chargers installed from 2024, with semiannual reports and, for chargers installed after 27 September 2026, hourly data.

    govinfo.govlaw.cornell.eduacterra.org

    Credit

    US Federal Highway Administration; California Energy Commission

  4. 2023

    Britain demands 99% reliability

    The UK's Public Charge Point Regulations 2023, in force from 24 November 2023, require each operator's network of rapid chargers (50 kW and above) to be reliable 99% of the time on average over each calendar year from November 2024, measured by the status codes the chargers report. Operators must publish their reliability, run a free staffed helpline 24 hours a day, publish live availability as free open data, take contactless cards at new chargers of 8 kW and above, and show prices in pence per kWh; the Office for Product Safety and Standards enforces the rules.

    legislation.gov.ukassets.publishing.service.gov.uk

    Credit

    UK Department for Transport

  5. 2023

    Shared error codes

    Charger makers, carmakers and operators each used their own messages for the same faults, which slowed repairs. In December 2023 the National Charging Experience Consortium (ChargeX), run by Argonne, Idaho and National Renewable Energy laboratories and funded by the US Joint Office of Energy and Transportation, recommended 26 common error codes for chargers using OCPP, with an implementation guide. ChargeX's director told FedScoop that adoption "is voluntary."

    driveelectric.govfedscoop.com

    Credit

    ChargeX Consortium; ABB co-chaired the working group

  6. 2024

    Thieves cut charging cables

    With copper near a record price, thieves began cutting fast-charger cables across the US. Electrify America told the Associated Press that two years earlier a cable might be cut about every six months across its 968 stations, but that it had 129 cut through May 2024, more than in all of 2023; a scrap yard pays $15 to $20 for a cable that Minneapolis says costs about $1,000 to replace.

    LessonOne cut cable can take a whole station offline, so the cable needs guarding as much as the charger.

    ksl.com

    Credit

    reported by Tom Krisher, Associated Press

  7. 2025

    Uptime and success diverge

    In J.D. Power's 2025 study of 7,428 US owners, run with PlugShare, 14% said they had visited a public charger without being able to charge, down 5 percentage points from 2024 and the lowest in four years. ChargerHelp, a charger repair company, analyzed over 100,000 sessions at 2,400 chargers and found that 71% of attempts succeed on the first try, while networks report uptime of 98.7 to 99.9%, and that new stations succeed 85% of the time but only 69.9% by year three.

    LessonUptime counts the minutes a charger reports itself working, not whether a driver leaves charged.

    silicon.co.ukautomotiveworld.com

    Credit

    J.D. Power and PlugShare; ChargerHelp

Watch for

  1. UK networks report 99%

    InstaVolt, a UK rapid-charging network, publishes monthly figures under the 2023 regulations showing charger uptime between 99.12% and 99.63% every month from April 2025 to September 2026, excluding sites shut by vandalism. A September 2025 survey of more than 200 UK operators by Monta, a charging software company, found that only 4% reported average uptime of 99.5% or above, and a review of 38 rapid networks by the newsletter The Fast Charge, reported in April 2026, found that 16 appeared to meet the 99% rule for 2025 and 22 did not, while many figures were hard to verify.

    Achieved whenthe enforcement authority publishes compliance results, or an outside analysis of the open availability data confirms at least 99% for a full calendar year.

    instavolt.co.ukevfleetworld.co.ukelectricalreview.co.uk

    Claimed by

    InstaVolt, monthly through 2025 and 2026

Open

  1. 01

    Recompute UK reliability openly

    A public tracker that polls the free availability data that UK rapid-charging networks must publish, computes each network's reliability by the regulation's own definition, and sets the result beside the figure each network publishes about itself.

    The brief
    Credit · unclaimed
  2. 02

    Error codes in plain words

    An open table that maps every documented fault code of the ten most common fast-charger models to one of ChargeX's 26 shared codes, with the party responsible for the fix, and a small tool that labels a charger's OCPP log with those codes.

    The brief
    Credit · unclaimed

Open 01 · the brief

Recompute UK reliability openly

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public tracker that polls the free availability data that UK rapid-charging networks must publish, computes each network's reliability by the regulation's own definition, and sets the result beside the figure each network publishes about itself.

Why it is still open

The regulations make each operator publish its own reliability and report it to the government, which has not published a single register. The newsletter The Fast Charge checked 38 networks' published statements and reports in April 2026 and found that 16 appeared compliant, but it worked from the operators' own figures, many of them hard to verify. InstaVolt reports above 99% each month, while Monta's 2025 survey found only 4% of operators reporting 99.5% or above. No recomputation from the open status data was found.

legislation.gov.ukelectricalreview.co.ukevfleetworld.co.uk

Built with what exists

The operators' open OCPI availability feeds, which report each charger's status; a poller that records them every five minutes; Python; an agent that gathers each operator's published reliability statement with links (see the Note "Findings that cite notes").

  1. First step

    Find the open data endpoints of three rapid networks and log one week of status for every rapid charger they list.

  2. Done looks like

    Six months of records for the 10 largest UK rapid networks, each network's reliability computed under regulation 7 with the method published, and a table comparing it month by month with the network's own figure.

Open 02 · the brief

Error codes in plain words

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table that maps every documented fault code of the ten most common fast-charger models to one of ChargeX's 26 shared codes, with the party responsible for the fix, and a small tool that labels a charger's OCPP log with those codes.

Why it is still open

ChargeX published the 26 codes in December 2023 because makers and operators used "different messages to report similar errors," but adoption is voluntary. Its implementation guide numbers the shared codes CX001 to CX026 and shows how a charger can send one next to a maker's own code in the same OCPP message, but it maps no maker's codes. No public crosswalk from makers' own codes to the shared ones was found.

driveelectric.govfedscoop.cominl.gov

Built with what exists

The ChargeX error-code report and implementation guide; makers' public service manuals; a language model that drafts each mapping with the manual page it came from (see the Note "Findings that cite notes"); open-source OCPP software such as the EVerest charger stack and the SteVe server, run on a laptop, to produce test logs.

  1. First step

    Collect the public fault-code lists of three fast-charger models and map them by hand to the 26 codes.

  2. Done looks like

    Mappings for ten charger models covering at least 90% of their documented codes, each with a manual page reference, and two working charger technicians agreeing with at least 95% of a random sample of 200 mappings.