Industries / Energy, water and waste / Electric transmission and distribution / EV charging infrastructure
Payment and software
Payment and software is how drivers find a charger, start a charge and pay for it, and the software that links each charger to the company that runs it, to other networks and to drivers' apps.
7
Milestones achieved, from 2010 to 2024.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2010
An open charger language
A networked charger reports to a central computer that starts sessions, sets prices and logs faults, and in 2009 there was no common way for the two to talk. ElaadNL, a foundation set up by the Dutch distribution grid companies, wanted to buy 10,000 chargers from several makers, so it began the Open Charge Point Protocol (OCPP) in 2009 and published version 1.0, free to use, in 2010. ElaadNL handed OCPP to the new Open Charge Alliance in 2014, which calls version 1.6 of 2015 "the worldwide de facto standard"; the International Electrotechnical Commission (IEC) adopted OCPP as standard IEC 63584 in 2024, and Germany's standards body DIN has issued it as a national standard.
LessonA buyer large enough to insist on one open protocol can set it for a whole industry.
Credit
ElaadNL; Open Charge Alliance
2013
One contract, many networks
In May 2013 Hubject, a joint venture of BMW, Daimler, Bosch, Siemens and the utilities EnBW and RWE, switched on intercharge, a hub through which a driver with one provider's contract can charge at any operator connected to it, a service called roaming; Hubject's manager said it "enables simple charging for all users of electric vehicles everywhere". The hub supports OCPP and Hubject's own Open Intercharge Protocol.
Credit
Hubject; Bosch Software Innovations, which built the back end
2020
Plugging in starts payment
Plug & Charge, defined in the ISO 15118 standard, lets the car identify itself to the charger with a digital certificate, so plugging in starts and bills the session with no card or app. InsideEVs tested Ford's Mustang Mach-E at an Electrify America fast charger in December 2020 and called it "the very first electric vehicle to launch with Plug&Charge technology."
Credit
Ford; Electrify America
2022
Charging stopped by radio
Researchers showed that a radio signal of less than 1 W, sent from about 47 m away, can stop fast-charging sessions on the Combined Charging System (CCS), in their words "one of the most widely used DC rapid charging technologies", by interrupting the data link between car and charger. They named the attack Brokenwire, tested it on eight cars and 20 chargers, and disclosed it to the industry; the behavior it exploits is required by the DIN 70121 and ISO 15118 standards.
LessonA behavior that the standards require can itself be the weak point.
Credit
Sebastian Köhler, Richard Baker, Martin Strohmeier and Ivan Martinovic (University of Oxford and armasuisse)
2022
Apps open a back door
K. Sarieddine, C. Assi and three colleagues analyzed 31 widely used charging apps and the cloud systems behind them. They found missing checks on who the user and vehicle are, which let an attacker hijack other people's charging sessions remotely, and confirmed the attacks on a test bed.
LessonThe app and the cloud behind a charger are part of the charger.
Credit
K. Sarieddine, M. A. Sayed, S. Torabi, R. Atallah and C. Assi
2023
US rules for paying
The Federal Highway Administration's rule of 28 February 2023, for chargers built with federal highway money such as the NEVI program, requires a contactless debit and credit card reader plus a phone or text-message option, no membership, and a price in dollars per kilowatt-hour (kWh, the unit electricity is sold in) shown before the charge starts and fixed for the session. It also fixed the software: OCPP 2.0.1 between charger and network, ISO 15118 with Plug & Charge, OCPI 2.2.1 (the Open Charge Point Interface, which networks use to swap data and bill each other) by 28 February 2024, and free price and live-status data for outside app makers.
Credit
US Federal Highway Administration
2024
Card readers across Europe
The EU's Alternative Fuels Infrastructure Regulation (AFIR), Regulation (EU) 2023/1804, applies from 13 April 2024. Every public charger must let anyone charge without a contract; at chargers put in from that date, operators must take electronic payment, by card reader or contactless card device at 50 kW and above, or also by a QR code below 50 kW. Chargers of 50 kW and above must price by the kWh, may add only a per-minute idle fee, must show both before the charge starts, and older ones on the main European road network must add card payment by 1 January 2027.
Credit
European Parliament and Council of the EU
Watch for
A shared certificate list
Plug & Charge needs the car and the charger to trust each other's digital certificates. The SAE ITC EVPKI Consortium said in December 2025 that it had launched a production certificate trust list with six certificate authorities, including DigiCert, Hubject, Irdeto and ISS, with General Motors and Tesla taking part, as the base of an interoperable certificate system for the whole industry. At CharIN's Testival in Detroit in June 2026 it showed the list "currently featuring nine EVPKI-compliant roots from six companies" and previewed "the planned 2026 SAE EVPKI launch."
Achieved whencars from at least two makers start and pay for charges by Plug & Charge on at least two unrelated networks using the shared list, confirmed by an outside tester.
Claimed by
SAE ITC EVPKI Consortium, December 2025 and June 2026
Roaming markups ruled unlawful
On 6 October 2026 the Regional Court of Munich I (case 33 O 2062/25) found that the operator EWE Go broke AFIR's ban on discriminating between drivers and the companies that sell charging through apps, by charging Digital Charging Solutions (DCS), which sells charging through carmakers' apps, €0.837 per kWh at chargers where drivers paying on the spot paid €0.79 and EWE Go's own contract customers €0.52. The court held that EWE Go may bill DCS only the €0.52 rate and owes damages back to April 2024, amount still to be set. The trade site electrive calls it the first ruling to clarify that clause of AFIR.
Achieved whenthe judgment becomes final, by a ruling on appeal or by the time to appeal running out.
Claimed by
Digital Charging Solutions, upheld in a first-instance judgment of the Regional Court of Munich I, October 2026
Open
01
A public AFIR price scorecard
A monthly public scorecard, by operator and by country, of whether Europe's public chargers of 50 kW and above publish what AFIR requires on the national access points, the official open-data portals each EU country runs: a per-kWh price for paying without a contract, the payment methods accepted, and live status.
The briefCredit · unclaimed02
Check receipts against prices
An open audit in which drivers donate their own past charging receipts, a model reads each one, and a checker compares the energy, unit price and fees billed with the price the operator published for that charger at that time.
The briefCredit · unclaimed
Open 01 · the brief
A public AFIR price scorecard
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A monthly public scorecard, by operator and by country, of whether Europe's public chargers of 50 kW and above publish what AFIR requires on the national access points, the official open-data portals each EU country runs: a per-kWh price for paying without a contract, the payment methods accepted, and live status.
Why it is still open
A July 2026 study for the consumer group BEUC and Transport & Environment found outdated or missing price data "common" and "insufficient monitoring" of access-point duties, and called for "public compliance scorecards"; its evidence came from desk research, a survey and interviews, not from the data itself. At a September 2026 workshop, Google reported that only 11 of 44 countries it researched publish live availability on their access points, and ACE Auto Club Europa put ad hoc price coverage near 5% under Germany's model, both country-level counts rather than a check of each operator.
Built with what exists
The access points' public feeds; the OCPI NAP Extension v1.0 that the EVRoaming Foundation published in September 2026 to map each AFIR data field onto OCPI; Python; an agent that finds each country's endpoints and records what it read with links (see the Note "Findings that cite notes").
First step
Download one day of data from Austria's and Germany's access points and count, for each operator, the chargers of 50 kW and above that show a per-kWh ad hoc price.
Done looks like
For all 27 EU countries, every operator with 20 or more chargers of 50 kW and above scored each month for three months on the share of those chargers that carry a per-kWh ad hoc price, payment methods and live status, with code and raw snapshots public.
Open 02 · the brief
Check receipts against prices
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open audit in which drivers donate their own past charging receipts, a model reads each one, and a checker compares the energy, unit price and fees billed with the price the operator published for that charger at that time.
Why it is still open
The EU, UK and US rules all require the price to be shown before charging, per kWh at fast chargers, but the July 2026 BEUC and Transport & Environment study says AFIR's data "does not yet guarantee" a reliable price view across apps, chargers and receipts, and proposes common receipt data so that "mismatches between the price shown before charging and the price billed afterwards" become detectable. Checks so far have looked at the meter rather than the bill: EVCI Global, an inspection firm, tested hundreds of UK chargers with calibrated equipment and found that 31.5% recorded energy that did not match what they supplied, the RAC reported in March 2026.
Built with what exists
A vision-language model that reads PDF and screenshot receipts into fields; published price data from the EU access points, UK operators' open data and US network data feeds; Python. Receipts are collected with consent and stripped of names and card numbers; no payments are made by the project.
First step
Write the receipt schema (station, tariff, session, times, kWh, unit price, fees, total) and hand-label 50 donated receipts.
Done looks like