Tunneling
Tunneling digs passages through rock and soil, or under water, for roads, railways, water and utilities, and lines them so that they stay open, dry and safe to use.
c. 530 BCE
On the Greek island of Samos, the engineer Eupalinos of Megara had a tunnel about 1,036 m (3,400 ft) long cut by hand through Mount Kastro from both ends at once, to carry spring water to the city; the American Society of Civil Engineers says the two halves met with a difference in height of only about 2 ft (0.6 m) and that Herodotus described it in about 440 BCE.
33
Milestones achieved across 6 domains.
8
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
People were cutting water tunnels through rock by hand nearly 3,000 years ago: Hezekiah's tunnel in Jerusalem, about 533 m long, around 700 BCE, and the Eupalinos tunnel on Samos about 170 years later, both dug by two teams working toward each other. The modern trade took shape in the 1800s, when compressed-air drills and nitroglycerin drove long rail tunnels through hard rock and shields held up soft ground under rivers. The first rotary boring machines followed in the 1880s.
Where it stands
Tunnels are now driven in two main ways: by drilling and blasting one round at a time, or by tunnel boring machines that cut the whole face and line the tunnel as they go, some as wide as 17.6 m. China alone had 18,573 railway tunnels in service at the end of 2023, 23,508 km in all, by the count of Gong Jiangfeng and colleagues in the journal Tunnel Construction. Rules written after fires and collapses set how tunnels are ventilated and how people escape, and smaller machines push pipes under roads and rivers with nobody inside.
What is open
Much of what decides a tunnel's cost and safety is still judged by eye and recorded one project at a time: how geologists rate the rock at the face, how fast cutters wear, how much explosive a round needs, how far the ground above will sink and how long blast fumes take to clear. Those records stay with contractors and researchers, so the rules of thumb are seldom tested across many tunnels. Free satellite radar, public inspection data, low-cost robot arms and AI models that read papers are enough to start pooling and testing them.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Ground investigation
Ground investigation finds out what rock, soil, water and gas lie along a tunnel's route, before and during digging, and watches how the ground above moves while the tunnel is built.
5 · 1 · 2
Last achievedSettlement measured from orbit2019
Watch forStrata predicted from machine data
2
openDrill and blast
Drill and blast drives a tunnel one round at a time: a rig called a jumbo drills a pattern of holes into the rock face, crews charge the holes with explosive and fire them in a set order, and the broken rock, called muck, is loaded out before the next round.
5 · 1 · 2
Last achievedTwice the planned explosive2025
Watch forBattery loaders at the face
2
openBoring machines
A tunnel boring machine (TBM) cuts the whole round face of a tunnel in one pass with a rotating cutting wheel, carries the spoil away behind it and, in weak or wet ground, holds the ground up while the lining is built.
5 · 3 · 2
Last achievedOne machine, four modes2015
Watch forLinghang under the Yangtze
2
openLining and support
Lining and support hold the ground up once it is dug and keep water out, with rock bolts, sprayed concrete, rings of precast concrete segments and concrete cast in place.
5 · 1 · 2
Last achievedA sealant poisons a ridge1997
Watch forSegments for a mined tunnel
2
openSmall-diameter boring
Small-diameter boring puts pipes and ducts under roads, rivers and railways without digging a trench, by pushing pipe in behind a cutting head or pulling it into a drilled hole, in tunnels too small for a person or only just big enough.
6 · 1 · 2
Last achievedPipes pushed out to sea2018
Watch forA 3.2 km pipe jack
2
openVentilation and safety
Ventilation and safety keep people alive underground: fresh air in and fumes, dust and gas out while a tunnel is built, and smoke control, escape routes and rescue once it is in use.
7 · 1 · 2
Last achievedForty-one trapped, no escape2023
Watch forFewer people at the face
2
open
Advances to build with
1 research note
Open in tunneling
3 of 12 open deliverables
Open · Ground investigation
Face ratings from many geologists
A public set of 200 photos of tunnel faces and rock exposures, each rated blind on the Q-system's six numbers by at least five engineering geologists, and a test of whether AI vision models land inside the spread between the people.
Built with what exists
Face photos used with permission from tunnel owners and university groups; NGI's free Q-system handbook and its rating tables; a rating form; Python for Krippendorff's alpha, a score of agreement among several raters that discounts chance; a vision model that returns probabilities for fixed answers (see the Note "A thousand questions, one pass"); TRaiC for tracing joints.
Open · Drill and blast
Twenty dummy rounds by robot
A bench test of a robot that loads a rock face the way a charging crew does, with no explosive or detonator at any stage. A camera finds each drilled hole, and the arm pushes an inert dummy cartridge, a wooden or 3D-printed cylinder, to the bottom of the hole. The face is a scaled concrete or timber panel drilled to a published drill plan, with the holes at the plan's angles.
Built with what exists
LeRobot, Hugging Face's open robot-learning software, and its low-cost SO-101 arm (see the Note "No download"); an open robot model fine-tuned on a few dozen demonstrations (see the Notes "Open robot model weights" and "Five demonstrations per task"); a depth camera such as an Intel RealSense; OpenCV to find the holes; a drilled concrete paver or timber panel; wooden dowels as dummies. Robot models that learn a task from a few demonstrations are what make a small-team attempt possible.
Open · Boring machines
An open cutter wear table
A public table of disc cutter use on finished hard-rock TBM drives, gathered from papers, theses and project reports. Disc cutters are the steel rings on the cutting wheel that crack the rock, and changing them stops the machine. Each row gives the tunnel, machine diameter, cutter size, rock type and strength, abrasiveness test results such as the Cerchar abrasivity index and the Cutter Life Index, and cutters changed per kilometer or per cubic meter. Then score the published wear models, those of the Colorado School of Mines (CSM), the Norwegian University of Science and Technology (NTNU) and Gehring, against it.
Built with what exists
Open-access papers and theses (NTNU Open, Politecnico di Torino's thesis archive, open journals); an AI model that reads PDFs and pulls out figures, with a person checking each row (see the Note "Seven more flagged"); Python with pandas.
Where it sits
Broader
In outline