Small-diameter boring
Small-diameter boring puts pipes and ducts under roads, rivers and railways without digging a trench, by pushing pipe in behind a cutting head or pulling it into a drilled hole, in tunnels too small for a person or only just big enough.
6
Milestones achieved, from 1896 to 2018.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1896
Pipes pushed under tracks
Gary Brierley's history in Tunnel Business Magazine, citing Barbara Stack's 1982 handbook of tunneling machinery, credits the Northern Pacific Railroad with developing auger boring, in which a turning screw cuts soil and carries it back through a steel casing, and pipe jacking, in which hydraulic jacks in a pit push a string of pipes through the ground behind a cutting shield. The railroad used them from 1896 to put drains under its embankments.
Credit
Northern Pacific Railroad Co
1960
Jacks along the pipe
The force needed to push a pipe string grows with its length. Johnson Western Constructors jacked a 120-in (3.0 m) pipe 1,200 ft (366 m) from a single pit with a mechanized shield and four intermediate jacking stations, rings of jacks set between pipes partway along the string, with 3,800 tons of total jacking capacity, controlled from the surface. The job had been designed as a trench, and jacking proved cheaper.
Credit
Johnson Western Constructors
1970s
Nobody at the face
Microtunneling is pipe jacking with a remotely steered boring machine at the front, run from a control cabin at the surface, so nobody works in the pipe. Brierley writes that Japan's Iseki appears to have been the first to use remote-controlled slurry machines for utility lines in poor soil, in the 1970s, when Japan needed sewers and water pipes under crowded cities. In 1981 Iseki added a crushing head for cobbles and boulders and opened a British office that helped spread the method in Europe.
LessonBrierley warns that the many small machines on sale lead some designers to pick ones unsuited to the ground, and sums it up as "the ground is the boss.".
Credit
Iseki
1990s
Tests for jacking pipes
A jacked pipe carries the full push of the jacks along its length, and early concrete jacking pipes were ordinary sewer pipes with adapted joints. After a pipe string failed catastrophically on a pipe jacking contract for London's Thames Water Authority, the UK Pipe Jacking Association, with pipe makers and water companies, funded research at Oxford University in the late 1980s and early 1990s on pipe joints and packings, where most of the load passes from pipe to pipe, to set standard tests for pipe manufacture. The association's chairman wrote in 2017 that pipe failures are now rare when pipes are handled and installed correctly.
LessonWhile it is being pushed, a pipe is a structural member, and its joints need testing for that load, not only for the load of the soil once buried.
Credit
Pipe Jacking Association; Oxford University
2006
A drain cleaner finds gas
A cross bore is a new pipe or cable drilled straight through an existing pipe, often a sewer lateral, the pipe from a house to the sewer main, without anyone noticing. In March 2006 in Middletown, Ohio, a plumber clearing a blocked lateral with a drain-cleaning machine cut into a gas line that had been bored through it, and got a woman and her three grandchildren out seconds before the house exploded. Trenchless Technology reported that the explosion pushed cross bores to the top of the industry's agenda as the North American Society for Trenchless Technology (NASTT) formed a cross-bore committee; one search program in 2001 had already found nearly 400 cross bores in 200 miles of sewer.
LessonA bore has to be checked against the pipes it may have crossed, not only steered by the locator's reading.
Credit
NASTT Cross-Bore Committee
2018
Pipes pushed out to sea
Direct Pipe, a Herrenknecht method, joins a slurry microtunneling machine to a "Pipe Thruster" that grips a fully welded steel pipeline and pushes machine and pipe forward together, so the hole is lined as soon as it is cut. For Watercare, the water utility of Auckland, New Zealand, the contractor McConnell Dowell used it for a 1,930 m sea outfall at Army Bay in 2018 and a 2,021 m drive for the Snells Algies outfall in July 2020, each a distance record for the method by the maker's and contractor's count. At the end of each drive the machine was lifted from the seabed.
Credit
Herrenknecht; McConnell Dowell; Watercare
Watch for
A 3.2 km pipe jack
China Railway Engineering Equipment Group (CREG) says two 2.6 m pipe jacking machines it built drove water intake pipes for Nantong's Ligang Water Plant beneath the Yangtze riverbed, 43 m below it, breaking through on 24 June 2026. It says the left line, 3,214.96 m in one drive, is a world record for single pipe-jacking length, where large steel pipe jacking normally stays within 2,000 m.
Achieved whenthe plant's owner or an independent body publishes the as-built length and survey.
Claimed by
CREG, reported by Tunnel Business Magazine, July 2026
Open
01
Open jacking-force records
A public table of jacking force against distance for finished pipe jacking and microtunneling drives, taken from published case histories, with pipe size, ground type, lubrication and stoppages for each drive, and a score of how well the design methods used in industry predict each one. Jacking force is the total push the jacks must give, and it has to stay below what the pipes and the launch shaft can take.
The briefCredit · unclaimed02
Locator readings near steel
A controlled test of how far walkover locators misread depth near common sources of interference. In horizontal directional drilling (HDD), a radio transmitter called a sonde rides in the drill head, and a worker on the surface reads its depth and position with a hand-held receiver. The test sets a sonde and receiver at measured distances on open ground, then beside a rebar mat, a chain-link fence panel and a wire carrying another locator's signal, with no drilling or digging.
The briefCredit · unclaimed
Open 01 · the brief
Open jacking-force records
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of jacking force against distance for finished pipe jacking and microtunneling drives, taken from published case histories, with pipe size, ground type, lubrication and stoppages for each drive, and a score of how well the design methods used in industry predict each one. Jacking force is the total push the jacks must give, and it has to stay below what the pipes and the launch shaft can take.
Why it is still open
Brian Sheil of Oxford wrote in 2020 that predicting the total jacking force is complicated by geology, lubrication, work stoppages, the operator's driving style and pipe misalignment, and tested his forecasting method on two UK drives. Saeed Rahjoo's 2012 master's thesis at the University of Texas at Arlington compared recorded forces from pipe jacking projects with a series of prediction methods and reports "a high discrepancy" between their results. Chapman and Ichioka built a large database of microtunneling jacking forces in 1999, which was not found online. A GitHub search for "jacking force" found no repositories, and no open table spanning many drives was found in this session.
Built with what exists
Papers and theses that plot jacking records; WebPlotDigitizer to read the curves; an AI model to pull tables from PDFs, with a person checking each row (see the Note "Seven more flagged"); Python.
First step
Digitize the two UK drives in Sheil's openly posted 2020 manuscript and code one design method.
Done looks like
At least 40 drives from at least five countries, released under an open license with each curve linked to its source, and each design method's error at the end of each drive.
Open 02 · the brief
Locator readings near steel
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A controlled test of how far walkover locators misread depth near common sources of interference. In horizontal directional drilling (HDD), a radio transmitter called a sonde rides in the drill head, and a worker on the surface reads its depth and position with a hand-held receiver. The test sets a sonde and receiver at measured distances on open ground, then beside a rebar mat, a chain-link fence panel and a wire carrying another locator's signal, with no drilling or digging.
Why it is still open
Radiodetection, a locator maker, says sonde depth readings should be within ±3% "if conditions are suitable," and that a strong signal on an adjacent line "can often introduce ± 50% error." Trenchless Technology's "Drill Master" column lists how rebar, fences and power lines can make HDD depth readings wrong, without figures. No independent controlled test across interference sources was found in this session.
Built with what exists
Two or three commercial HDD walkover locating systems, or a cable locator with a sonde; a tape measure; plastic stands; a rebar mat and a fence panel from a builders' supplier; a spreadsheet.
First step
Borrow one locator and sonde, and measure the depth error at 2 m on open ground and beside one rebar mat.
Done looks like
For each locator, the depth error at 1, 2 and 3 m under five conditions, ten readings each, published with photos of the setup and the raw readings.