Lining and support
Lining and support hold the ground up once it is dug and keep water out, with rock bolts, sprayed concrete, rings of precast concrete segments and concrete cast in place.
5
Milestones achieved, from 1907 to 1997.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1907
Concrete sprayed from a hose
Carl Akeley, a taxidermist at the Field Columbian Museum in Chicago, built a machine that blew dry plaster through a hose with compressed air and added water at the nozzle, to recoat the museum's crumbling facade; he unveiled it on 24 June 1907. He improved it into the "Cement Gun", shown at the Cement Show in New York in December 1910, where a paper described its use in lining the Hunter's Brook Siphon of New York's water supply. His patent, No. 991,814, was issued on 9 May 1911. Sprayed concrete, now usually called shotcrete, became one of the main ways to support rock in tunnels.
Credit
Carl E. Akeley, with Clarence L. Dewey
1964
Thin linings that yield
The New Austrian Tunnelling Method (NATM) supports weak ground by letting it deform a little under a flexible support, so that the ground around the tunnel carries much of the load. Crews spray a thin layer of concrete right after each advance, pin the rock with rock bolts (steel rods set in drilled holes), close the ring with a floor arch called an invert as early as possible, and measure how the ground moves; the permanent lining goes in once the movement slows below a set limit. L. von Rabcewicz introduced it at a colloquium in Salzburg in 1962. It was used on the Schwaikheim tunnel in 1964, and his paper in the magazine Water Power that year brought international recognition, by the account of Arild Palmström of NGI.
Credit
L. von Rabcewicz, L. Müller and F. Pacher
1979
A fire curve for tunnels
A fire curve is the path of temperature over time that a furnace follows when a sample of lining is fire tested. After a fire in the Velser Tunnel turned the attention of the Dutch transport agency Rijkswaterstaat to tunnel fires in the late 1970s, the research body TNO ran small-scale tests in 1979 and 1980 that set the RWS curve, which climbs to 1,350 °C. It stands for a worst case: a 50 m³ petrol tanker fire of about 300 MW burning for up to 120 minutes. TNO and Rijkswaterstaat published a fire test procedure for concrete in tunnels in 1986 and revised it in 1998 and 2008, and full-scale fires in Norway's Runehamar tunnel in 2003 confirmed the curve. Testers outside the Netherlands use it too: in 2002 Peter Tatnall reported sprayed concrete panels fired on the RWS curve at the Hagerbach test gallery in Switzerland.
Credit
Rijkswaterstaat; TNO, now Efectis
1996
Fire peels a tunnel lining
In 1996 a fire on a train burned for about 10 hours in the Channel Tunnel between England and France. MIT reports that the concrete lining "peeled away layer by layer like an onion," destroying whole portions of the ring and leaving the chalk exposed in places; repairs took six months. The failure is called explosive spalling: water in dense, strong concrete turns to steam faster than it can escape, and the pressure bursts off the surface. Fire tests followed, and the Channel Tunnel Rail Link, the high-speed line to London, put steel fibers and fine polypropylene fibers in the precast segments and sprayed linings of its 40 km of tunnels, Peter Tatnall reported in 2002. The plastic fibers melt at about 170 °C and leave fine channels for the steam; Efectis notes they reduce spalling but usually do not end it, and that results depend strongly on the type of fiber.
Lessonstrong, dense concrete needs a way for steam to escape in a fire.
Credit
Franz-Josef Ulm and colleagues at MIT (analysis); the Channel Tunnel Rail Link designers (fiber linings)
1997
A sealant poisons a ridge
Crews boring a rail tunnel through the Hallandsås ridge in southern Sweden met far more water than estimated, and cement grout injected into the cracks did not stop it. In 1997 they sealed the rock with Rhoca-Gil, a grout from Rhône-Poulenc made of acrylamide and N-methylolacrylamide, both toxic. In the cold, damp tunnel it did not fully set, and the chemicals ran out with the leaking water into streams and groundwater. Fish died, grazing cows were paralyzed, workers were poisoned, and work stopped in October 1997, not to resume until 2005. A government commission criticized the rail agency Banverket, the contractor Skanska and the unions in November 1998, and in January 2002 a Swedish court fined two Skanska managers and gave Skanska the maximum company fine, SEK 3 million. A 2001 study of 210 Swedish tunnel workers exposed to an acrylamide grout found strong evidence of nerve damage in 23, nearly all of whom recovered within 18 months.
Lessona sealant has to be tested in the cold, wet conditions where it will cure, and the people using it told its hazards.
jarnvagsmuseum.engelholm.seeurofound.europa.eueurofound.europa.eusjweh.fi
Credit
the Swedish government commission (findings)
Watch for
Segments for a mined tunnel
Tunnels dug by roadheaders, machines with a rotating cutting head on an arm, are usually lined with concrete poured behind formwork, while boring machines line as they go with precast segments. Sydney Metro West says it used a custom Lining Erector Machine to line two service tunnels of about 700 m at Clyde with precast segments, building a ring of four segments in about an hour and lining the last tunnel, 762 m long and 6 m across, in two months. The project calls it a world first and says the finish is watertight.
Achieved whenan outside party reports the lining's leakage and build rate, or another project uses the method and publishes its results.
Claimed by
Sydney Metro West, as reported by Infrastructure Magazine, October 2025
Open
01
Liner forecasts against later inspections
A test of tunnel lining deterioration forecasts against inspections made later. Fit yearly rates of change for each type of US highway tunnel liner from the first years of the National Tunnel Inventory (NTI), forecast the later years, and score the forecasts against what inspectors then recorded.
The briefCredit · unclaimed02
An open ring-building bench
A desk-sized model of ring building that anyone can copy: 3D-printed segments at about 1:10 scale, including the wedge-shaped key segment that closes each ring; a low-cost robot arm as the erector; a matching computer simulation; and a scoring rule for each ring built.
The briefCredit · unclaimed
Open 01 · the brief
Liner forecasts against later inspections
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A test of tunnel lining deterioration forecasts against inspections made later. Fit yearly rates of change for each type of US highway tunnel liner from the first years of the National Tunnel Inventory (NTI), forecast the later years, and score the forecasts against what inspectors then recorded.
Why it is still open
Under the US National Tunnel Inspection Standards, inspectors split the area of each liner among four condition states, from good to severe, and the Federal Highway Administration (FHWA) has published the inventory for every year from 2018 to 2026. Early models used the first, preliminary release: Hasan and Elwakil (2019) built regression models from it and noted that its inspection data were still incomplete, and Yamany and Elwakil (2019) modeled cast-in-place concrete liners. Muaz Ahmed, Ramy Khalef, Gasser Ali and colleagues trained machine-learning models on FHWA's tunnel data in 2021, and their best, a random forest, sorted tunnels into condition classes with 85.38% accuracy; it classifies the present condition and does not forecast later inspections. No study was found that tests such forecasts against the inspections filed since.
Built with what exists
The NTI Excel files for 2018 to 2026 from FHWA; by this session's count, the 2026 file holds 477 cast-in-place concrete liner records, 58 shotcrete, 55 unlined rock, 45 precast concrete and 40 steel; FHWA's Specifications for the National Tunnel Inventory for the element definitions; Python with pandas; a Markov chain model, which gives the chance each year that an area of liner moves from one condition state to the next.
First step
Download the 2018 and 2026 files, join the liner records by tunnel number, and count how much liner area changed condition state.
Done looks like
For each liner type with at least 40 records, rates fitted on 2018 to 2021 and a published error for forecasts of the 2022 to 2026 condition shares, compared with a forecast of no change; code and tables published.
Open 02 · the brief
An open ring-building bench
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A desk-sized model of ring building that anyone can copy: 3D-printed segments at about 1:10 scale, including the wedge-shaped key segment that closes each ring; a low-cost robot arm as the erector; a matching computer simulation; and a scoring rule for each ring built.
Why it is still open
Erectors on real machines are still mostly driven by operators, and published automation is partial or unchecked. HS2's Krokodyl robot removes the wooden spacers between delivered segments and inserts dowels but does not place segments; The Boring Company's claim of rings built with nobody aboard has no outside check. Gannouni and colleagues at RWTH Aachen trained a reinforcement learning agent to build rings in simulation in 2023, reporting that "no simulation environment is publicly available" for erectors and that placing the last segment needed finer control. No open bench that others can rerun was found.
Built with what exists
An SO-101 arm, an open design from TheRobotStudio supported by Hugging Face's LeRobot software, and LeRobot's tools for recording demonstrations and training policies (see the Note "No download"); open robot models that learn a task from a few demonstrations (see the Note "Five demonstrations per task" and the Note "Open robot model weights"); MuJoCo for the simulation; a desktop 3D printer; feeler gauges and calipers.
First step
Print one ring of segments and a key sized for the arm, and record 50 remote-controlled placements.
Done looks like
Published CAD files, code and scoring rules, and 20 filmed attempts at a full ring by a learned policy, with a tally of rings closed and the measured step and gap at every joint, beside the same tally for a person driving the arm by remote control.