Industries / Transport and vehicles / Maritime and shipping / Offshore supply vessels
Cargo and deck work
Cargo and deck work is loading a supply vessel at its shore base, carrying deck cargo in containers and baskets and liquids and powders in tanks below deck, and passing it all to and from platforms by crane and hose while both are moving in the sea.
5
Milestones achieved, from 1989 to 2022.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1989
Rules for bulk chemicals
On 19 October 1989 IMO adopted guidelines that let offshore support vessels carry limited amounts of hazardous liquids in their tanks without meeting the full rules for chemical tankers. "Limited" meant no more than the lesser of 800 m³ or a volume equal to 40% of the vessel's deadweight, the weight it can carry.
Credit
IMO Assembly, Resolution A.673(16)..pdf)
1998
Containers built for open seas
IMO's guidelines for offshore containers, MSC/Circ.860 of 22 May 1998, replacing a circular of 18 June 1993, start from the fact that these boxes ride on the open deck of supply vessels and are lifted on and off installations by the platforms' cranes, "often" in "very unfavourable weather and sea conditions." Among other things a container must withstand a 30° tilt in any direction when fully loaded. The European standard EN 12079 was based on the circular, and today's ISO 10855 follows the same line.
Lessona box that is safe in a port can fail when it is snatched off a pitching deck.
Credit
IMO Maritime Safety Committee
2013
One rulebook for marine operations
The North-West European Area guidelines for supply and rig-move work were renamed the Guidelines for Offshore Marine Operations (GOMO) in 2013 and rewritten to apply outside the North Sea, under the care of the Marine Safety Forum. Among much else GOMO sets one colour code for bulk-hose couplings so that crews do not connect the wrong product: yellow for dry cement, orange for barytes and bentonite, blue for drinking water, brown for diesel.
Credit
Norwegian Shipowners' Association, Norwegian Oil and Gas Association, Netherlands Oil and Gas Production Association, Danish Shipowners' Association, Oil & Gas UK and UK Chamber of Shipping
2017
A chemical code for OSVs
On 6 December 2017 IMO adopted the OSV Chemical Code for offshore support vessels that carry hazardous liquids in bulk, to be applied from 1 July 2018 in place of the 1989 guidelines. It covers chemicals, oil-based and water-based drilling mud, liquid carbon dioxide and liquid nitrogen, and "contaminated backloads," the dirty fluids sent back from platforms to shore.
Credit
IMO Assembly, Resolution A.1122(30)..pdf)
2022
Wrong weight drops a load
On 8 May 2022 the crane on the rig Deepsea Atlantic was lifting a slip joint, a heavy section of drilling riser, from the supply ship Stril Mar. The manifest said 32 tonnes, but lifting clamps (856 kg) and protective covers (1,304 kg) added since delivery made it 35.2 tonnes; after repeated overload alarms the load fell, struck the ship's bulwark and landed on the seabed. Norway's offshore regulator found the crane setting was incorrect and that it "was operated outside its design criteria."
Lessona lift plan is only as good as the weight written on the manifest.
Credit
Havtil (then the Petroleum Safety Authority Norway)
Watch for
Crane aids for vessel lifts
EnerMech, a crane services company, and Optilift, which makes crane aids, signed a multi-year collaboration covering Optilift's Motion Reporter, which measures how the vessel moves relative to the crane and which they say will "reduce weather-related operational constraints," a People Detector that alerts the crane operator to people nearby, and a Boom Tip Indicator.
Achieved whenan operator or regulator publishes data showing lifts made safely in rougher seas than before, or fewer people inside the drop zone, with these aids in use.
Claimed by
EnerMech and Optilift, May 2026
Open
01
Robot hook-on, tested to scale
A tabletop test of a robot arm that slips a crane hook into the master link, the ring at the top of a container's lifting slings, on a deck that heaves and rolls like a supply vessel's, at about one tenth of full size.
The briefCredit · unclaimed02
Weights checked against records
A checker that reads a lift's cargo manifest, the item's certificate and its modification records, and flags any weight that does not add up before the lift is planned.
The briefCredit · unclaimed
Open 01 · the brief
Robot hook-on, tested to scale
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A tabletop test of a robot arm that slips a crane hook into the master link, the ring at the top of a container's lifting slings, on a deck that heaves and rolls like a supply vessel's, at about one tenth of full size.
Why it is still open
Deck crew still stand beside the load to hook it on. In one near miss reported in 2017, two crew were "ready to hook a load onto the installation crane" and one fell over a tag line, a rope used to steady the load, as it was hooked on. Evolift, a Norwegian company, described remote-controlled units that connect and release cargo at sea and built prototypes in 2019 and 2020, tested mainly at a fish farm; its EU project pages report no supply-vessel work.
Built with what exists
A low-cost open robot arm such as the SO-101 with Hugging Face's LeRobot software, a camera, NVIDIA's GR00T 2 robot model trained from a few demonstrations (covered in the Notes as "Five demonstrations per task"), and a hobby six-axis motion platform replaying deck motion.
First step
Build the scaled deck on the motion platform and drive it with motion from a simple wave model.
Done looks like
50 filmed attempts at a stated scaled sea state, with the number that succeeded and the median time per hook-on, next to 50 attempts by a person with a boat hook on the same rig.
Open 02 · the brief
Weights checked against records
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A checker that reads a lift's cargo manifest, the item's certificate and its modification records, and flags any weight that does not add up before the lift is planned.
Why it is still open
The Deepsea Atlantic slip joint weighed 33,286 kg when it left the manufacturer, two later modifications added 2,160 kg and about 100 kg of lines were removed, yet the manifest from the logistics base still said 32 tonnes. Searches for weight checks turned up tools only for shipping containers, under the international rule on verified container weights, and none for offshore cargo.
Built with what exists
An AI model that reads documents and pulls out figures, such as Meta's Muse Ember (covered in the Notes as "The jobs agents repeat") or the open-weight Mistral Large 4 run on one's own machine ("A trillion open parameters"); Python; made-up lift records.
First step
Write the first 20 records from the figures in the Deepsea Atlantic report.
Done looks like
A public test set of 200 made-up lift records with 20 planted weight errors, and a checker that finds at least 19 of them while wrongly flagging no more than 10 correct records.