Vessels

Vessels covers how supply boats, anchor handlers and wind-farm service ships are designed, built, bought and laid up as offshore work rises and falls.

7

Milestones achieved, from 1955 to 2023.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1955

    A boat built for rigs

    Rigs in the Gulf of Mexico were first served by war-surplus landing craft about 105 ft (32 m) long with their controls and machinery at the back, which Laborde called "thin-skinned and under-powered." His Ebb Tide put the wheelhouse and cabins at the bow and left 90 ft (27 m) of open cargo deck behind them, a combination he said "would allow one to maneuver the stern near the rig and control it there in much heavier weather." It cost about $225,000, and by Offshore magazine's account the design "was copied time and again" by competitors.

    Lessonputting the bridge forward and the deck aft let a boat work alongside a rig in weather the converted craft could not.

    offshore-mag.comoffshore-mag.com

    Credit

    Alden J. "Doc" Laborde; Tidewater Marine Service

  2. 1974

    North Sea boats get tougher

    When Norway's oil age began, the shipyard Ulstein judged the American designs unsuited to North Sea weather and drew broader hulls with higher sides. Its UT 704, first delivered in 1974, had a clear after deck 37.5 m long and 11 m wide, about 7,040 brake horsepower and about 80 tonnes of bollard pull, the force a vessel can pull while tied to a fixed post; 91 were built, by the count of IMarEST, the marine engineers' institute. Kongsberg, which now owns the UT designs, says more than 800 UT ships have been built since 1974.

    imarest.orgulstein.commynewsdesk.com

    Credit

    Ulstein

  3. 1981

    Rules written for supply boats

    On 19 November 1981 the UN's shipping agency, then called IMCO and now IMO, adopted guidelines for the design and construction of offshore supply vessels, because applying the general ship safety convention to them was "often inappropriate." The 2006 revision covers new supply vessels 24 m to 100 m long and defines one by the Ebb Tide's layout: accommodation and bridge in the forward part, an exposed cargo deck in the after part.

    wwwcdn.imo.orgwwwcdn.imo.org

    Credit

    International Maritime Organization..pdf).pdf)

  4. 2006

    A bow that leans back

    Ulstein's X-BOW slopes backward from the waterline, so the hull pushes into waves instead of slamming down on them. The first ship with it, the anchor handling tug supply (AHTS) vessel Bourbon Orca, a supply boat with large winches and engines for towing rigs and setting their anchors, was delivered to Bourbon Offshore Norway in 2006. In Ulstein's own side-by-side test she held 13 knots while the conventional Skandi Caledonia made 8, and more than 100 X-BOW designs had been sold by 2016.

    ulstein.comulstein.com

    Credit

    Ulstein; Bourbon Offshore Norway

  5. 2015

    Ships based at wind farms

    A service operation vessel (SOV) stays at an offshore wind farm for weeks, houses the technicians who maintain the turbines and lands them by gangway. ESVAGT took delivery of two purpose-built SOVs, Esvagt Froude and Esvagt Faraday, in 2015, and in 2018 the turbine maker Vestas gave it SOV contracts of up to 15 years for the Borssele III-IV and Triton Knoll wind farms. Ulstein's first two ships with its X-STERN design, delivered in 2016 and 2017, were SOVs for Bernhard Schulte.

    esvagt.comulstein.com

    Credit

    ESVAGT; Ulstein; Bernhard Schulte

  6. 2017

    Too many boats arrive

    Oil prices fell from late 2014 while ships ordered in the boom kept arriving: in December 2017 IHS-Markit, as cited by Tidewater, counted 3,445 vessels in three main classes and 245 more under construction. Tidewater filed for Chapter 11 bankruptcy protection on 17 May 2017 and came out on 31 July; at the end of that year 89 of its 227 vessels were stacked, laid up with the crew sent home. Hornbeck Offshore filed on 19 May 2020, and during the COVID-19 slump more than 1,500 vessels worldwide were laid up, by Westwood Global Energy's count.

    Lessonboats ordered on credit in a boom arrive years later, often into a market that no longer needs them.

    sec.govsec.govwestwoodenergy.com

    Credit

    Tidewater; Hornbeck Offshore; IHS-Markit and Westwood Global Energy for the counts

  7. 2023

    Fewer owners, older boats

    After the bust the largest owner grew by buying fleets instead of ordering ships: Tidewater bought GulfMark in November 2018 (65 vessels), Swire Pacific Offshore in 2022 (50 vessels) and, on 5 July 2023, 37 platform supply vessels from Solstad for about $594.2 million. A platform supply vessel (PSV) has a long open deck and tanks below it for liquids and powders. The average age of Tidewater's fleet rose from 9.6 years at the end of 2018 to 13.1 years at the end of 2025, and Westwood says more than half of the world's working fleet is now over 15 years old.

    sec.govsec.govtdw.com

    Credit

    Tidewater; Westwood Global Energy for the fleet age

Watch for

  1. Uncrewed ship in safety zones

    Reach Subsea says its uncrewed surface vessel Reach Remote 1 received a Cargo Ship Trading Certificate from the Norwegian Maritime Authority and was hired by Equinor, acting for the gas pipeline operator Gassco, to inspect about 3,500 km of pipeline, mostly in the second quarter of 2026. In March 2026 Equinor added reservoir monitoring at the Troll field and subsea inspection and repair work, and Reach says the vessel has worked inside the safety zones around installations.

    Achieved whenEquinor, Gassco or a regulator reports the inspection campaign finished with no crew aboard, or confirms routine uncrewed work inside platform safety zones.

    inderes.dkoffshore-technology.com

    Claimed by

    Reach Subsea, February and March 2026

Open

  1. 01

    Count laid-up boats openly

    A public weekly list of every supply vessel seen in Norwegian and Danish waters, each marked as working, idle in port or laid up, worked out from ship-tracking data, with the rule for each status and the code published.

    The brief
    Credit · unclaimed
  2. 02

    Wind or oil, by day

    From the same tracks, a quarterly count of the days supply and service vessels spend at oil and gas fields, at wind farms and in port, for Norwegian and Danish waters.

    The brief
    Credit · unclaimed

Open 01 · the brief

Count laid-up boats openly

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public weekly list of every supply vessel seen in Norwegian and Danish waters, each marked as working, idle in port or laid up, worked out from ship-tracking data, with the rule for each status and the code published.

Why it is still open

The fleet counts everyone quotes come from paid services that set their own definitions. Westwood counts 3,209 vessels working and 377 laid up at the end of 2025, while Tidewater calls a vessel stacked "if the vessel crew is furloughed or substantially reduced and limited maintenance is performed." A SINTEF proof of concept that maps several years of supply-vessel tracks runs on data it does not publish, and a search found no open register.

westwoodenergy.comsec.govgithub.com

Built with what exists

AIS (automatic identification system) positions that ships broadcast, free from Norway's Coastal Administration under an open licence and as historical files from the Danish Maritime Authority; Python with DuckDB or GeoPandas; installation positions from Norway's Offshore Directorate (Sodir).

kystverket.nodma.dk

  1. First step

    Download one month of Norwegian AIS history and list the supply vessels that never left port.

  2. Done looks like

    A status for every supply vessel seen over one full year, with a hand check of 50 vessels against their owners' published fleet lists that agrees on at least 45.

Open 02 · the brief

Wind or oil, by day

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

From the same tracks, a quarterly count of the days supply and service vessels spend at oil and gas fields, at wind farms and in port, for Norwegian and Danish waters.

Why it is still open

Tidewater lists "windfarm development and maintenance activities" among the work its fleet does, but its annual report gives no split of vessel days by industry, and Westwood's published summary gives use rates for the fleet as a whole. A search found no public count of vessel days by the industry they served.

sec.govwestwoodenergy.com

Built with what exists

The Norwegian and Danish AIS data above, oil and gas field outlines from Sodir, wind farm outlines from OpenStreetMap, Python.

  1. First step

    Draw the outlines of Denmark's offshore wind farms and count AIS vessel-days inside them for one month.

  2. Done looks like

    Four quarters of vessel days by industry for both countries, with the method and code published and 100 vessel-days checked by hand against charter announcements.