Anchor handling and towing

Anchor handling is the work of laying, moving and recovering the anchors of floating rigs and towing rigs between sites, done by anchor handlers that pull chain and wire over a roller at the stern.

6

Milestones achieved, from 2003 to 2024.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 2003

    Pulled under by a wire

    The Danish anchor handler Stevns Power was lost in shallow water off Nigeria while working for a pipelaying barge. She had lifted an anchor from the seabed when the barge reeled in the anchor wire too fast; the wire pulled her stern first towards the barge, her after deck went under and filled with water, and she sank within moments. Eleven people died.

    Lessona line under load can pull an anchor handler under from either end.

    imca-int.com

    Credit

    as reported by Norway's Bourbon Dolphin Commission of Inquiry

  2. 2007

    Bourbon Dolphin capsizes

    On 12 April 2007 the Bourbon Dolphin, a 75.2 m anchor handler, was running out anchors for the drilling rig Transocean Rather in 1,100 m of water west of Shetland when she rolled over at 17:08; seven of the 15 people aboard were saved. The commission found no single cause: the winch could pull harder than the vessel could withstand, the shipyard's stability conditions for anchor work were "not realistic" and no rule required them to be approved, no weather limits were set, and a towing pin, one of the steel posts that hold the line in place at the stern, had been pushed down so the chain lay against the outer pin.

    Lessona winch must never be stronger than the hull can stay upright against.

    imca-int.com

    Credit

    Commission of Inquiry chaired by Judge Inger Lyng (NOU 2008:8)

  3. 2008

    Stability rules proposed

    The commission's report of 28 March 2008 found that "neither the IMO's regulatory system nor Norwegian regulations" set concrete stability requirements for anchor handlers, and that the industry had no standard practice. It proposed calculations with the winch's full pull at the outer towing pin and the line at least 25° off the vessel's centreline, with the heel, the angle the vessel leans to, kept within the angle at which its righting lever, the measure of how strongly it rights itself, has fallen to half its maximum. It also called for simulator training specific to each vessel.

    imca-int.com

    Credit

    Bourbon Dolphin Commission of Inquiry

  4. 2016

    Anchor work in IMO's code

    On 25 November 2016 IMO added a section for ships doing anchor handling, lifting and towing to Part B, the guidance part, of its 2008 Intact Stability Code, taking effect on 1 January 2020. It sets a residual righting area of at least 0.070 metre-radians and a residual righting lever of at least 0.2 m, limits the heel to the smallest of the half-maximum angle, the angle at which the deck edge goes under and 15°, and calls for stop pins that keep the wire from moving further outboard and for emergency release on winches.

    Lessonthe failures found on the Bourbon Dolphin reached worldwide guidance nine years after she capsized..pdf).

    wwwcdn.imo.org

    Credit

    IMO Maritime Safety Committee, Resolution MSC.415(97)

  5. 2019

    Water through the shark jaws

    Shark jaws are clamps at the stern that grip chain or wire under load; when lowered they sit flush with the deck in a housing below it. On 26 September 2019 the anchor handler Bourbon Rhode sank in Hurricane Lorenzo on passage from Las Palmas to Guyana; three of her 14 crew were rescued, four bodies were recovered and seven people were never found. Survivors said the chief engineer reported water entering the stern propulsion room through the inspection covers of the shark jaws' housing, covers an inspection had found leaking in May 2019, and the investigators found leaking covers on other anchor handlers in the same fleet.

    Lessonopenings for deck machinery are part of the hull and need the same watertight checks; in August 2020 the investigators told operators of similar systems to seal and test the covers after every opening.

    aet.gouvernement.lumaritime.public.lu

    Credit

    Luxembourg's Administration of Technical Investigations (AET)

  6. 2024

    Calculations before every job

    GOMO's chapter on anchor handling and rig moves, in its revision of May 2024 and later, says every vessel shall have its own anchor handling and towing manual, that "stability calculations shall be performed prior to commencement of any anchor handling operation," and that weather forecasts should come from two reputable forecasters.

    cdn.prod.website-files.com

    Credit

    the industry associations that sponsor GOMO

Watch for

  1. Anchor handling for floating wind

    Kongsberg Maritime says it will equip a 127 m floating wind construction vessel for Korea's Hana Shipping, to work at the Ulsan floating wind farm about 70 km offshore, with a 500-tonne towing and anchor-handling winch with three drums, plus winches and a tensioner for installing mooring ropes. It calls the ship "the first large FWCV order globally in recent years," with delivery due in July 2027.

    Achieved whenthe vessel is delivered and has laid moorings at Ulsan, as confirmed by the wind farm's developer or a class society.

    oedigital.com

    Claimed by

    Kongsberg Maritime, January 2026

Open

  1. 01

    Open check for anchor stability

    Open-source software that takes a vessel's hydrostatic data, its loading and a planned line tension and direction, and checks the result against IMO's 2016 anchor-handling criteria, showing the margin left at each step of a job.

    The brief
    Credit · unclaimed
  2. 02

    Mooring days for floating wind

    A count, from ship-tracking records, of the vessel days that anchor handlers and construction vessels spent laying the moorings of Hywind Tampen, Equinor's floating wind farm off Norway, per anchor and per turbine.

    The brief
    Credit · unclaimed

Open 01 · the brief

Open check for anchor stability

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

Open-source software that takes a vessel's hydrostatic data, its loading and a planned line tension and direction, and checks the result against IMO's 2016 anchor-handling criteria, showing the margin left at each step of a job.

Why it is still open

The Bourbon Dolphin commission wrote that it "cannot see that the industry has developed any standardised practice," and IMO's 2016 criteria set the tests without supplying a tool. A search found commercial stability software and research models of a vessel's motion while laying anchors, but no open implementation of the 2016 criteria checked against a public case..pdf)

imca-int.comwwwcdn.imo.org

Built with what exists

Python, a hull offset table run through open hydrostatics code, and the load conditions the commission published in chapter 9 of its report.

  1. First step

    Transcribe Table 9.1 and the vessel data from chapter 9 of NOU 2008:8.

  2. Done looks like

    Code that reproduces the commission's OK and not-OK stability verdicts for every load condition in its Table 9.1, plus ten more test cases with published inputs and answers.

Open 02 · the brief

Mooring days for floating wind

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A count, from ship-tracking records, of the vessel days that anchor handlers and construction vessels spent laying the moorings of Hywind Tampen, Equinor's floating wind farm off Norway, per anchor and per turbine.

Why it is still open

Equinor says the farm uses "a shared anchoring system" but publishes no figures for the vessel time it took, and a search found none published by others.

equinor.com

Built with what exists

Norway's open AIS data, the farm's position from Sodir, vessel names from published contract announcements, Python.

kystverket.no

  1. First step

    List the anchor handlers that appear in Norwegian AIS within 5 km of the farm during its installation.

  2. Done looks like

    A table of every vessel that worked at the site during installation, with its dates and days, and a figure for vessel days per anchor, with the method and code published.