Industries / Construction and property / Commercial and residential construction
Modular and prefab building
Modular and prefab building makes parts of buildings, such as wall panels and roof trusses, or whole finished rooms, in a factory, and ships them to the site to be put together.
c. 1830
H. Manning, a London carpenter, began making timber houses from standard panels that packed into a ship's hold, so that emigrants to the Australian colonies could put one up within hours of landing; the architectural historian Miles Lewis calls him "the first system builder in the modern sense".
34
Milestones achieved across 6 domains.
8
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
From about 1830 H. Manning of London sold houses made of standard timber panels to emigrants, who could put one up within hours of landing in Australia. Sears sold house kits from a catalog in the United States from 1908, and after World War II British aircraft plants helped build 156,623 temporary bungalows. US factories shipped nearly 600,000 mobile homes in 1973, built whole and towed to the site.
Where it stands
Japan has built houses from factory-made steel boxes since 1970, Singapore requires stacked room modules on selected government land sites, and a pair of 56-story towers there was stacked from modules made abroad. Large factory ventures have often failed, from Lustron in 1950 to Katerra in 2021 and several British modular house builders in 2023. In the US, modular houses were about 1% of single-family homes completed in 2025 by the Census Bureau's count, and a 2026 law let factory-built homes drop the steel chassis they once had to keep.
What is open
Much of what decides whether a module arrives whole and fits is not measured in public: the loads on it in transit, how far it departs from its drawings, how wet it gets before the roof is closed, and how long each lift takes. Most open jobs are shared datasets and tests of that kind, plus a few factory tasks still done by hand, such as setting electrical boxes, that robots trained from demonstrations could now attempt.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Designing for the factory
Designing for the factory is the work of drawing a building so that most of it can be made as repeated parts or whole rooms in a plant, shipped, and fitted together on site.
5 · 1 · 2
Last achievedApartment designs off the shelf2023
Watch forAI plans with standard modules
2
openFactory production
Factory production is the work of building wall panels, roof trusses or whole room-sized boxes, called modules, on a production line indoors, ready to ship to the site.
6 · 2 · 2
Last achievedRobots frame module walls2020
Watch forRobotic microfactories cut time
2
openTransport
Transport is the work of moving finished panels and modules from the factory to the site by road, rail or sea, within the size limits each road allows, without damaging them.
5 · 1 · 2
Last achievedTurns rock modules most2022
Watch forModules shipped China to England
2
openSite assembly
Site assembly is the work of lifting factory-made modules or panels into place with cranes, joining them to each other and to the foundation, and sealing the joints against the weather.
5 · 1 · 2
Last achievedStacked modules reach 56 stories2022
Watch forAustralia's tallest module tower
2
openQuality and codes
Quality and codes covers the rules a factory-built building must meet, who checks it in the plant and on site, and how lenders and insurers come to trust it.
7 · 2 · 2
Last achievedThe chassis comes off2026
Watch forOff-site rules in model codes
2
openFinance and scheduling
Finance and scheduling is the work of paying for a factory and its output before the building exists, and of planning factory and site work so that they run at the same time.
6 · 1 · 2
Last achievedUS modular share shrinks2026
Watch forA house factory goes public
2
open
Narrower industries
Manufactured housing
Advances to build with
1 research note
Open in modular and prefab building
3 of 12 open deliverables
Open · Designing for the factory
A benchmark for module splitting
A public set of at least 50 real apartment floor plans, each split into factory modules by an experienced modular designer, with every module's width, length and weight and the road size limits it was split for. Add a scoring script that compares any automatic split, from an optimization program or an AI model, with the expert split on number of modules, number of different module sizes, and broken rules such as a module too wide to ship or bathrooms that do not stack.
Built with what exists
Floor plans from the SwissDwellings and MSD datasets as starting points; IfcOpenShell to read and write IFC, the open file format for building models; Python; current AI models such as Claude, Gemini or open-weight vision models as some of the methods tested.
Open · Factory production
Score wall-panel checks
A public test set of photos of finished, unsheathed wood wall panels on factory framing tables, each with hand-measured truth (stud positions, the size and place of each opening, and the two diagonals that show whether the panel is square), plus a script that scores any camera-checking tool against it.
Built with what exists
A phone or overhead camera; printed ArUco markers, square patterns that let software find scale and position; OpenCV and an open object-detection model such as YOLO; each panel's shop drawing exported from the plant's framing software.
Open · Transport
Open logs of module rides
A public dataset of acceleration, tilt and GPS readings from real module deliveries, each trip paired with notes from an inspection of the module before loading and after unloading, so that damage can be tied to road events such as turns, bumps and speed.
Built with what exists
Phones running a sensor-logging app, or low-cost loggers built on an Arduino-compatible board with an accelerometer and a GPS receiver; Python with NumPy and SciPy for the analysis; Zenodo to host the data.
