BRENNEN

Industries / Construction and property / Commercial and residential construction

Modular and prefab building

Modular and prefab building makes parts of buildings, such as wall panels and roof trusses, or whole finished rooms, in a factory, and ships them to the site to be put together.

c. 1830

H. Manning, a London carpenter, began making timber houses from standard panels that packed into a ship's hold, so that emigrants to the Australian colonies could put one up within hours of landing; the architectural historian Miles Lewis calls him "the first system builder in the modern sense".

latrobesociety.org.au

34

Milestones achieved across 6 domains.

8

To watch for: announced, not yet confirmed outside.

12

Open deliverables. Nobody has shipped them.

In one minute

Where it started

From about 1830 H. Manning of London sold houses made of standard timber panels to emigrants, who could put one up within hours of landing in Australia. Sears sold house kits from a catalog in the United States from 1908, and after World War II British aircraft plants helped build 156,623 temporary bungalows. US factories shipped nearly 600,000 mobile homes in 1973, built whole and towed to the site.

Where it stands

Japan has built houses from factory-made steel boxes since 1970, Singapore requires stacked room modules on selected government land sites, and a pair of 56-story towers there was stacked from modules made abroad. Large factory ventures have often failed, from Lustron in 1950 to Katerra in 2021 and several British modular house builders in 2023. In the US, modular houses were about 1% of single-family homes completed in 2025 by the Census Bureau's count, and a 2026 law let factory-built homes drop the steel chassis they once had to keep.

What is open

Much of what decides whether a module arrives whole and fits is not measured in public: the loads on it in transit, how far it departs from its drawings, how wet it gets before the roof is closed, and how long each lift takes. Most open jobs are shared datasets and tests of that kind, plus a few factory tasks still done by hand, such as setting electrical boxes, that robots trained from demonstrations could now attempt.

Domains

AchievedWatch forOpen

Narrower industries

Manufactured housing

Advances to build with

1 research note

Open in modular and prefab building

3 of 12 open deliverables

Open · Designing for the factory

A benchmark for module splitting

A public set of at least 50 real apartment floor plans, each split into factory modules by an experienced modular designer, with every module's width, length and weight and the road size limits it was split for. Add a scoring script that compares any automatic split, from an optimization program or an AI model, with the expert split on number of modules, number of different module sizes, and broken rules such as a module too wide to ship or bathrooms that do not stack.

Built with what exists

Floor plans from the SwissDwellings and MSD datasets as starting points; IfcOpenShell to read and write IFC, the open file format for building models; Python; current AI models such as Claude, Gemini or open-weight vision models as some of the methods tested.

Credit · unclaimed

Open · Factory production

Score wall-panel checks

A public test set of photos of finished, unsheathed wood wall panels on factory framing tables, each with hand-measured truth (stud positions, the size and place of each opening, and the two diagonals that show whether the panel is square), plus a script that scores any camera-checking tool against it.

Built with what exists

A phone or overhead camera; printed ArUco markers, square patterns that let software find scale and position; OpenCV and an open object-detection model such as YOLO; each panel's shop drawing exported from the plant's framing software.

Credit · unclaimed

Open · Transport

Open logs of module rides

A public dataset of acceleration, tilt and GPS readings from real module deliveries, each trip paired with notes from an inspection of the module before loading and after unloading, so that damage can be tied to road events such as turns, bumps and speed.

Built with what exists

Phones running a sensor-logging app, or low-cost loggers built on an Arduino-compatible board with an accelerometer and a GPS receiver; Python with NumPy and SciPy for the analysis; Zenodo to host the data.

Credit · unclaimed

Where it sits