BRENNEN

Industries / Construction and property / Commercial and residential construction / Modular and prefab building

Transport

Transport is the work of moving finished panels and modules from the factory to the site by road, rail or sea, within the size limits each road allows, without damaging them.

5

Milestones achieved, from 1955 to 2022.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1955

    Homes outgrow the road

    Marshfield Homes' "Tenwide" trailer home was 10 ft wide instead of the customary 8 ft, which made room for a hallway and rooms that could be closed off, but at first it was too wide to travel legally on the highways of many states, by the account of the Los Angeles Citywide Historic Context Statement, which dates it to 1955; Washington State's mobile home timeline dates 10-ft models to 1954. Widths grew as permits allowed: 12-ft models came in 1959 and 14-ft models in 1967, and Washington allowed 14-ft homes on its highways in 1970.

    LessonRoad permits, not the factory, set the width of a factory-built home.

    dahp.wa.govdahp.wa.gov

    Credit

    Marshfield Homes

  2. 2018

    A design load for fittings

    Godbole and colleagues modeled a truck and trailer carrying a module, with road roughness treated as a random input, and concluded that anything mounted in a module should be designed to withstand a vertical acceleration of up to 32 m/s² (3.3 g) in both directions, on top of gravity, to survive normal road transport without further checks.

    doi.org

    Credit

    Siddhesh Godbole, N. Lam, Mohamed Mafas, S. Fernando, E. Gad and J. Hashemi

  3. 2020

    Module rides measured

    Filomena Innella, Yu Bai and Zhihui Zhu put three-axis accelerometers on trailer beds and on building modules of different sizes and weights, carried on a tri-axle semi-trailer or a vessel carrier trailer along different routes in Australia. They published vibration spectra, which show how strong the shaking is at each frequency, by speed and road type, so that loads on a module in transit can be calculated.

    LessonThe work began because damage had been found in modules after delivery.

    doi.org

    Credit

    Filomena Innella, Yu Bai, Zhihui Zhu

  4. 2020

    Hong Kong writes delivery rules

    Modules for Hong Kong's modular integrated construction (MiC) projects are made in factories in mainland China's Greater Bay Area and cross into Hong Kong at one of six land boundary control points or by sea, by container ship or barge. The Construction Industry Council's September 2020 guide sets out the road rules: a load wider than 2.5 m needs a Wide Load Permit from the Transport Department and a traffic impact assessment of the route, a vehicle at the front and one at the rear as escorts, and a total height of no more than 4.6 m above the road. Hong Kong lanes are typically 3.3 m wide.

    mic.cic.hk

    Credit

    Construction Industry Council, Hong Kong

  5. 2022

    Turns rock modules most

    At the University of Nevada, Las Vegas (UNLV), Seung Ho Song fitted a sensor and cameras to Mojave Bloom, a steel-framed modular house built by UNLV's Team Las Vegas for the 2021 Solar Decathlon Design Challenge, and recorded it through lifting, road transport and offloading. Wide turns caused high side-to-side roll and high speeds caused high front-to-back tilt, and a solar panel on the roof was damaged.

    LessonFor this module, limiting roll mattered more than limiting tilt.

    oasis.library.unlv.edu

    Credit

    Seung Ho Song, UNLV

Watch for

  1. Modules shipped China to England

    CIMC Group says 63 modules for a senior apartment project in central England left Dongguan's Humen Port in early 2026 and were lifted into place in two weeks, and cites Shenzhen Customs figures of RMB 1.68 billion of prefabricated buildings exported through Shenzhen port in the first four months of 2026, up 19.6% on a year earlier. CIMC does not name the UK project.

    Achieved whenthe project's owner, builder or local authority names it and reports the modules' condition on arrival and the date the building opened.

    financialcontent.com

    Claimed by

    CIMC Group, July 2026

Open

  1. 01

    Open logs of module rides

    A public dataset of acceleration, tilt and GPS readings from real module deliveries, each trip paired with notes from an inspection of the module before loading and after unloading, so that damage can be tied to road events such as turns, bumps and speed.

    The brief
    Credit · unclaimed
  2. 02

    Check a ride model

    An open-source simulation of a truck and trailer carrying a module, of the kind Godbole and colleagues described, that predicts the shaking a module feels from its weight, its position on the trailer, the trailer's suspension and the road, checked against measured trips.

    The brief
    Credit · unclaimed

Open 01 · the brief

Open logs of module rides

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public dataset of acceleration, tilt and GPS readings from real module deliveries, each trip paired with notes from an inspection of the module before loading and after unloading, so that damage can be tied to road events such as turns, bumps and speed.

Why it is still open

Metvaei and colleagues at the University of New Brunswick wrote in November 2025 that models predicting damage from sensor data need "extensive, diverse training datasets that are rarely available for modular transport scenarios", and their own data is available only on request. Innella and colleagues (2020) measured trips in Australia and Song (2022) one house in Nevada; no open dataset from either was found.

cs.unb.caoasis.library.unlv.edu

Built with what exists

Phones running a sensor-logging app, or low-cost loggers built on an Arduino-compatible board with an accelerometer and a GPS receiver; Python with NumPy and SciPy for the analysis; Zenodo to host the data.

  1. First step

    Ask one modular factory to carry a logger on its next five deliveries and to share the before-and-after inspection notes.

  2. Done looks like

    30 deliveries from at least two factories logged and published with their inspection notes, with peak accelerations compared against the 3.3 g design figure of Godbole and colleagues.

Open 02 · the brief

Check a ride model

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open-source simulation of a truck and trailer carrying a module, of the kind Godbole and colleagues described, that predicts the shaking a module feels from its weight, its position on the trailer, the trailer's suspension and the road, checked against measured trips.

Why it is still open

Godbole and colleagues published their model, equations and design charts in a paywalled paper, and GitHub searches for this brief found no open code for module or trailer ride simulation. Innella and colleagues published measured vibration spectra by speed and road type that such a model could be checked against.

doi.orgdoi.org

Built with what exists

Python with NumPy and SciPy; road roughness profiles generated as random signals; the published measurements of Innella and colleagues for checking.

  1. First step

    Rebuild the two-dimensional truck-trailer model from Godbole and colleagues' paper and reproduce one of its design charts.

  2. Done looks like

    Code and inputs published, and the model's peak accelerations within 20% of the measured ones for at least two road types and two speeds.