Designing for the factory

Designing for the factory is the work of drawing a building so that most of it can be made as repeated parts or whole rooms in a plant, shipped, and fitted together on site.

5

Milestones achieved, from 1908 to 2023.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1908

    Houses from a catalog

    Sears, Roebuck and Company published its first Book of Modern Homes and Building Plans in 1908, with 22 designs. From 1915 it sold complete kits: precut lumber numbered to match the plans, windows, doors, flooring and the exact number of nails, shipped by rail for the buyer to unload and build. By most estimates Sears sold 70,000 to 75,000 houses by 1940, though it kept no sales records. It was not first: William and Otto Sovereign's company in Bay City, Michigan, founded in 1906 and later named Aladdin, began by making kits for boathouses, garages and summer cottages.

    LessonSears also lent buyers the money, and in the Depression it foreclosed on many of them and liquidated $11 million of home loans in 1934, by the Richmond Fed's account.

    richmondfed.org

    Credit

    Sears, Roebuck and Co., whose building-materials division Frank Kushel ran from 1906; William and Otto Sovereign of Aladdin

  2. 1957

    A shared kit for schools

    After 1945 Hertfordshire County Council's architects built prefabricated primary schools from a steel frame on an 8 ft 3 in grid, made with Hills of West Bromwich. In Nottinghamshire, where coal mining made the ground sink, county architect Donald Gibson's team chose a light pin-jointed steel frame by Brockhouse, with cross-bracing on springs so a school could ride the movement; it was used for the county's 1957–58 school program. Nottinghamshire then formed CLASP, the Consortium of Local Authorities Special Programme, with other councils to develop and order one system together. The historian Elain Harwood counts 213 CLASP buildings by 1962, when five schools rode coal extraction beneath them with modest repairs.

    LessonFire spread through the hidden voids between ceilings and roofs, and more fire stops were added after a 1965 fire in a Leicester school science block.

    e-flux.com

    Credit

    Nottinghamshire County Council (Donald Gibson, Dan Lacey, Henry Swain); F. W. Heathcote of Brockhouse Steel Structures

  3. 1972

    Capsules meant to be swapped

    Kisho Kurokawa's Nakagin Capsule Tower in Tokyo's Ginza district hung 140 factory-made steel capsules, each a one-room home, bolted to two concrete cores. The capsules were designed to be replaced every 25 years. The overhaul due in 1997 never happened, the building was poorly maintained, and it was dismantled in 2022 because its structure had decayed and held asbestos; a preservation group saved 23 capsules, and the Museum of Modern Art in New York keeps a restored one.

    LessonA module designed to be replaceable was never replaced; the owners of the capsules found no buyer to fund the tower's preservation and divided the capsules up instead.

    dezeen.comtimeout.comjapantimes.co.jp

    Credit

    Kisho Kurokawa

  4. 2019

    Seven kinds of prefab named

    A UK government working group published a framework that sorts "modern methods of construction" into seven categories, from whole 3D rooms made in a factory (category 1) and flat wall and floor panels (category 2) to site process improvements (category 7). It also uses pre-manufactured value (PMV), the share of a project's cost made off site rather than spent on site labor, supervision, equipment and temporary works, as a measure of how far a design relies on the factory. The aim was to give mortgage lenders, insurers and valuers one vocabulary for factory-built homes.

    gov.ukcast-consultancy.com

    Credit

    the Ministry of Housing, Communities and Local Government's joint industry working group, led by Mark Farmer of Cast Consultancy, with Buildoffsite, Homes England, NHBC and RICS

  5. 2023

    Apartment designs off the shelf

    After a Europe-wide tender, GdW, the federation of German housing companies, awarded framework contracts on 17 October 2023 to 20 bidders for 25 apartment-building designs made largely in factories. Member companies can order a design and adapt it locally without running a new Europe-wide tender for each project, and prices are fixed for five years except for changes tied to set construction price indices. By GdW's figures, the offers range from €2,370 to €4,370 per square meter of living space, and factory work cuts time on site to about six months on average. This was the second round; the first framework was awarded in 2018.

    LessonGdW's president said in the same release that type approval, approving a building design once for use across Germany, still had to be put into practice in every state building code.

    gdw.de

    Credit

    GdW, with the German construction industry federation (HDB), the federal building ministry and the Federal Chamber of Architects

Watch for

  1. AI plans with standard modules

    Researchers at ETH Zurich and the University of Hong Kong fine-tuned Stable Diffusion XL, an image-generating AI model, on apartment layouts from the SwissDwellings database so that it draws floor plans that fit a site boundary and place standard factory-made bathroom and kitchen modules. They report that it produced layouts within the boundary and with standard modules under varied conditions, in their own experiments.

    Achieved whena manufacturer builds a project from such a layout, or an outside test reports how often the layouts pass its design rules.

    ec-3.org

    Claimed by

    Hang Zhang, Jianpeng Cao, Anton Savov and Benjamin Dillenburger, European Conference on Computing in Construction, July 2026

Open

  1. 01

    A benchmark for module splitting

    A public set of at least 50 real apartment floor plans, each split into factory modules by an experienced modular designer, with every module's width, length and weight and the road size limits it was split for. Add a scoring script that compares any automatic split, from an optimization program or an AI model, with the expert split on number of modules, number of different module sizes, and broken rules such as a module too wide to ship or bathrooms that do not stack.

    The brief
    Credit · unclaimed
  2. 02

    Count a design's repeated parts

    A free script that reads an IFC building model, groups identical wall panels, floor cassettes, bathroom pods and modules, and reports how many different types there are and how often each repeats, with an estimate of pre-manufactured value (PMV) under a stated formula.

    The brief
    Credit · unclaimed

Open 01 · the brief

A benchmark for module splitting

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of at least 50 real apartment floor plans, each split into factory modules by an experienced modular designer, with every module's width, length and weight and the road size limits it was split for. Add a scoring script that compares any automatic split, from an optimization program or an AI model, with the expert split on number of modules, number of different module sizes, and broken rules such as a module too wide to ship or bathrooms that do not stack.

Why it is still open

Methods exist, among them Lin et al.'s segment-and-merge method (2025), Cao et al.'s graph search (2024) and Ghannad and Lee's CoGAN (2022), but each is tested on its own examples. The ETH Zurich team writes that annotated fabrication-aware datasets are "expensive and scarce", and trained its own model on five module prototypes of its choosing. Web and GitHub searches in November 2026 found no benchmark.

ec-3.org

Built with what exists

Floor plans from the SwissDwellings and MSD datasets as starting points; IfcOpenShell to read and write IFC, the open file format for building models; Python; current AI models such as Claude, Gemini or open-weight vision models as some of the methods tested.

  1. First step

    Ask two modular manufacturers for five past floor plans each with their module splits, with addresses removed, and permission to publish them.

  2. Done looks like

    50 plans with expert splits published under an open license, the scoring script, and scores for at least three methods, one of them an AI model.

Open 02 · the brief

Count a design's repeated parts

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A free script that reads an IFC building model, groups identical wall panels, floor cassettes, bathroom pods and modules, and reports how many different types there are and how often each repeats, with an estimate of pre-manufactured value (PMV) under a stated formula.

Why it is still open

PMV has rival definitions: the UK Department for Education divides materials plus off-site labor by materials plus all labor, while the RIBA's DfMA Overlay starts from gross capital cost less site overheads and site labor. Cast Consultancy's online PMV Estimator works from a choice of four residential building types and construction methods, not from a building model, and commercial quantity tools that read IFC do not report PMV. Web and GitHub searches in November 2026 found no open tool that computes PMV or part repetition from a model.

designingbuildings.co.ukcast-consultancy.com

Built with what exists

IfcOpenShell and Python; open sample IFC house and apartment models; the UK MMC definition framework's categories.

  1. First step

    Download one open IFC house model and count its wall and floor panel types by hand, to have a first answer the script must match.

  2. Done looks like

    The script run on 10 public IFC models, with its counts of panel and module types checked by hand on two of them and within 5%, and PMV reported under both formulas.