Crane and rigging
Crane and rigging is the trade that plans and makes lifts of heavy loads with cranes, slings and lifting hardware, and moves very heavy loads by road and across sites on trailers, transporters, jacks and skids.
c. 515 BCE
Greek builders began lifting temple blocks with cranes: the first stones cut with marks where lifting tongs gripped them, the sign of a true crane, come from temples of about 515 BCE.
31
Milestones achieved across 6 domains.
9
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
Greek builders were lifting temple blocks with cranes by about 515 BCE, and a 2019 study by Alessandro Pierattini of the University of Notre Dame argues that simpler lifting frames were in use about 150 years before that. The modern trade took shape between 1834 and 1922: iron wire rope in the mines of Germany's Harz mountains, a tower crane shown at Leipzig, a crane safety code from the American Society of Mechanical Engineers (ASME), and a crane built on a road truck. Heavy transport followed its own path, from trailer axles that share a load through hydraulics in 1956 to transporters that drive themselves in 1983.
Where it stands
The 20 largest crane makers sold about US$32.7 billion of cranes in 2024 or the year to March 2025, 2.7% less than a year before, by the count of the magazine International Cranes and Specialized Transport; Liebherr led, and four of the 20 were Chinese. The same magazine ranks Mammoet and Sarens, Dutch and Belgian heavy-lift firms, as the crane owners with the most lifting capacity. In the US the Bureau of Labor Statistics counted an average of 42 crane-related work deaths a year from 2011 to 2017, down from 78 a year from 1992 to 2010. Tower cranes run from cabins on the ground are at work on some sites, and the first mobile cranes that lift on battery power were delivered in December 2025 and April 2026.
What is open
Much of the trade's checking is still people reading paper: lift plans, load charts printed as PDFs, crane makers' dismantling manuals, permit manuals and inspection reports. The open jobs here are checks nobody has published: software that reviews lift plans and dismantling steps the way a second engineer would, load charts, permit rules and crane histories turned into checked open data, photo checks of fabric slings against break tests, and bench models that test the load-sharing and stability rules that riggers and heavy haulers rely on. None of them needs a live lift.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Lift planning
Lift planning is the desk work done before a crane lifts anything: finding the load's weight, choosing the crane and how it is set up, checking the ground and the weather, and writing down who does what.
5 · 2 · 2
Last achievedStandard and critical plans2014
Watch forA chatbot for lifting rules
2
openMobile cranes
Mobile cranes drive to a job on their own wheels or crawler tracks, set up, lift and leave, from small truck cranes to giant crawler and ring cranes.
4 · 1 · 2
Last achievedRing crane caps a reactor2023
Watch forBattery power on road cranes
2
openTower cranes
Tower cranes stand on a fixed base or on rails beside or inside a building, grow upward with it, and lift materials across the site for months or years.
6 · 2 · 2
Last achievedDriven from the ground2025
Watch forAI cranes in Hong Kong
2
openSlings and rigging
Rigging is the gear and the know-how that join a load to the crane hook: wire rope, chain and fabric slings, shackles, hooks and lifting beams, chosen and attached so the load hangs level and no part is overloaded.
4 · 1 · 2
Last achievedFour slings instead of eight2008
Watch forSlings with built-in pins
2
openHeavy transport
Heavy transport moves loads too big or heavy for ordinary trucks, such as transformers, plant modules and whole structures, on modular trailers, self-propelled transporters, jacks and skids, along routes that have to be surveyed and permitted first.
7 · 2 · 2
Last achievedHeaviest move on record2016
Watch forGermany switches permit systems
2
openInspection and operator certification
Inspection and operator certification check that cranes are fit to work and that the people running them have shown, by exam or license, that they can do so safely.
5 · 1 · 2
Last achievedA card is not enough2018
Watch forBritish Columbia licenses crane work
2
open
Advances to build with
1 research note
Open in crane and rigging
3 of 12 open deliverables
Open · Lift planning
Check lift plans by machine
Software that reads a finished lift plan (the method statement, crane setup, load weight, rigging, ground check and wind limit) and flags missing items and wrong numbers against the checklists in BS 7121-1 and ASME P30.1. Examples: a load above the chart capacity at the planned radius, rigging weight left out of the total, no wind limit for a large load, no check of the ground under the outriggers. An appointed person reviews every flag.
Built with what exists
A document-reading AI model such as the Claude-based reviewer Enveda described (see the Note "Seven more flagged"); purchased copies of BS 7121-1 and ASME P30.1 for the checklists; Python to recompute load totals and each lift's percentage of chart capacity.
Open · Mobile cranes
Reproduce a crane's tipping table
An open calculator that works out the wind speed that would tip a crawler crane at every combination of main boom and luffing jib angle, from its parts' weights, centers of gravity and wind areas, following ISO 4305, the international standard for checking a mobile crane's stability by calculation. On top of it, a warning that reads a weather forecast and says when a parked crane must be laid down.
Built with what exists
Python and NumPy; the tables in the DOB report as inputs and answers; ISO 4305:2014 and ISO 4302 (wind loads on cranes), bought for the method; the US National Weather Service forecast service (api.weather.gov) for the warning; a coding agent to write and run the tests (see the Note "Checked without being asked").
Open · Tower cranes
Check dismantling against the manual
Software that turns a tower crane maker's dismantling instructions into an ordered table of steps, with the pins allowed out at each step, and a checker that compares a recorded sequence with that table and flags any step out of order, such as pins removed from sections other than the one being lowered. It is tested on a scale-model tower and in simulation, with no person under any load.
Built with what exists
A document-reading AI model to draft the step table from the manual, checked by a tower crane technician (see the Note "Seven more flagged"); Python; a 1:20 model tower of aluminum sections joined by pins fitted with switches, read by a Raspberry Pi; MuJoCo or Project Chrono, open physics simulators, to show how a tower with missing pins responds to a side load.
Where it sits
Broader