Mobile cranes drive to a job on their own wheels or crawler tracks, set up, lift and leave, from small truck cranes to giant crawler and ring cranes.
4
Milestones achieved, from 1922 to 2023.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1922
A crane on a truck
Henry J. Coles of London, who set up as a crane maker in 1878, built steam cranes from the 1880s and rail-mounted steam cranes from 1890. In 1922 the firm launched a mobile crane on a Tilling-Stevens petrol-electric truck chassis with solid tires, so the crane could drive itself to a job by road instead of running on rails. Grace's Guide, an archive of British industrial history, lists the launch but makes no claim that it was the first.
Credit
Henry J. Coles Ltd
1977
Road speed with site grip
An all-terrain crane drives on public roads at truck speed but has all-wheel drive and steering, so it can also move around rough building sites. The trade magazine Cranes & Access (Vertikal) says the true breakthrough came in 1977, when Liebherr introduced its purpose-built LTM 1020 and 1025 with separate cabs for driving and for lifting. Sources disagree on the first: Cranes & Access calls the Demag Krake of 1956, of which only one was built, "arguably" the first, while Crane Briefing says Grove built the world's first, the AT180, in Germany in 1976. By 2008 Cranes & Access wrote of the all-terrain crane's "total domination", after it began in the 1970s as "an unreliable novelty".
Credit
Liebherr, Grove and Demag
2016
Lowered into the wind
On 5 February 2016 a Liebherr LR 1300 crawler crane with a 194 ft (59 m) main boom and a 371 ft (113 m) luffing jib, a second boom hinged at the top of the main boom that can be raised and lowered, fell across Worth Street in Manhattan, killing one person and injuring three pedestrians. The investigation done for New York City's Department of Buildings (DOB) by Crane Tech Solutions, with structural analysis by SGH, found the operator had not laid the boom down overnight, as the maker's manual required, despite a forecast of gusts up to 35 mph. He then lowered the main boom to about 72°, an angle at which SGH calculated a wind of 4 mph from behind would tip the crane. DOB revoked the operator's license in 2018, barred from city streets crawler set-ups that must be laid down in winds of 20 mph or less, and required anemometers (wind meters) and site wind plans.
LessonA long boom passes through angles where a light wind can tip the crane, so it must be laid down before the wind arrives.
Credit
Crane Tech Solutions and SGH for the NYC Department of Buildings
2023
Ring crane caps a reactor
A ring crane is a lattice-boom crane that turns on a large circular track built on the ground. Sarens, a Belgian heavy-lift firm, designed and built the SGC-250, called Big Carl, which began working at EDF's Hinkley Point C nuclear site in England in September 2019. On 15 December 2023 it lifted a 245-tonne steel dome, 47 m wide, onto the first reactor building in one lift of about an hour and a half, timed for a window of low wind. The Construction Index gives its capacity as up to 5,000 tonnes at a radius of 40 m; EDF calls it the world's largest land-based crane.
Credit
Sarens, for EDF Energy
Watch for
Battery power on road cranes
Liebherr delivered the first LTM 1150-5.4E, a 150-tonne all-terrain crane whose lifting motions run on electricity, to Mammoet on 12 December 2025, while prototype testing went on at its factory. Liebherr says its battery runs the crane for up to four hours without a power connection, and it planned series deliveries from spring 2026. Mammoet estimated from two weeks of its own fuel data that it could run the crane fully electric nine days in ten. In April 2026 Manitowoc handed Mammoet the first Grove GMK5150L-1e, a plug-in hybrid with a 180 kWh battery that Vertikal reports gives about eight hours of electric work. Both cranes keep a diesel engine for driving.
Achieved whena hire firm or an independent party publishes the measured fuel and electricity use of such cranes over months of paid work.
Claimed by
Liebherr and Mammoet, December 2025; Manitowoc and Mammoet, April 2026
Open
01
Reproduce a crane's tipping table
An open calculator that works out the wind speed that would tip a crawler crane at every combination of main boom and luffing jib angle, from its parts' weights, centers of gravity and wind areas, following ISO 4305, the international standard for checking a mobile crane's stability by calculation. On top of it, a warning that reads a weather forecast and says when a parked crane must be laid down.
The briefCredit · unclaimed02
Size crane batteries from records
A public method and tool that takes a crane hire firm's daily engine records, such as hours run, fuel burned and idle time, and works out for each working day whether a given battery would have covered the crane's lifting work, then reports the share of days covered for each crane size and season.
The briefCredit · unclaimed
Open 01 · the brief
Reproduce a crane's tipping table
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open calculator that works out the wind speed that would tip a crawler crane at every combination of main boom and luffing jib angle, from its parts' weights, centers of gravity and wind areas, following ISO 4305, the international standard for checking a mobile crane's stability by calculation. On top of it, a warning that reads a weather forecast and says when a parked crane must be laid down.
Why it is still open
The investigation report on the 2016 Worth Street collapse prints both the inputs, Liebherr's weights, centers of gravity and wind areas for each part, and SGH's table of tipping wind speeds for main boom angles of 70° to 82° and jib angles of 36° to 55°, which makes a ready test case. The models used by SGH, Crane Tech Solutions and Liebherr are not public. Published research estimates the wind that tips a top-slewing tower crane (35 to 53 m/s, Applied Sciences, 2025), Hobby code on GitHub models a truck-mounted crane tipping under its load (a MATLAB and Adams study, 2024) and a crawler crane tipping when it brakes while traveling (2025), but neither handles wind, and no open code has been checked against an investigation's table. ISO 4305 itself is a paid, copyrighted standard.
Built with what exists
Python and NumPy; the tables in the DOB report as inputs and answers; ISO 4305:2014 and ISO 4302 (wind loads on cranes), bought for the method; the US National Weather Service forecast service (api.weather.gov) for the warning; a coding agent to write and run the tests (see the Note "Checked without being asked").
First step
Type SGH's table and Liebherr's table of parts from the report into a spreadsheet, and compute one cell by hand.
Done looks like
The calculator marks the same cells unstable as SGH's table and matches every other cell within 2 mph; given the forecast quoted in the report for the evening of 4 February 2016, it says the crane had to be laid down that night.
Open 02 · the brief
Size crane batteries from records
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public method and tool that takes a crane hire firm's daily engine records, such as hours run, fuel burned and idle time, and works out for each working day whether a given battery would have covered the crane's lifting work, then reports the share of days covered for each crane size and season.
Why it is still open
Mammoet ran this kind of analysis privately on a two-week sample and estimated that Liebherr's battery crane could run on electricity nine days in ten. The makers state battery hours, four for Liebherr's crane and about eight for Grove's, without saying what workload those hours assume. A life-cycle study that Liebherr ran with the consultancy Frontier Economics, using an LTM 1160-5.2 crane as its example, modeled emissions for diesel, biofuel, hydrogen and battery power; it worked from assumed use, not measured working days. A search of the Crossref index of papers for crane fuel and energy studies found work on trucks and on off-road machines in general, but none on mobile cranes.
Built with what exists
The telematics exports, meaning the engine data that cranes send back to their owners, that a hire firm already keeps; Python and pandas; the makers' published battery capacities; a fuel-to-energy conversion with its assumptions stated; one battery crane with a meter on its charging cable to check the method.
First step
Ask a hire firm for three months of daily fuel and engine-hour records for its 100 to 150 tonne all-terrain cranes, and turn them into daily energy use.
Done looks like
A year of daily records from at least 30 cranes, published with crane identities removed, giving for each crane size the share of days a 180 kWh battery would have covered, separating driving from lifting where the records allow; checked against at least a month of metered use on one battery crane, with the gap stated in percent.