Lift planning is the desk work done before a crane lifts anything: finding the load's weight, choosing the crane and how it is set up, checking the ground and the weather, and writing down who does what.
5
Milestones achieved, from 1972 to 2014.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1972
A British code for cranes
The British Standards Institution published CP 3010, a code of practice for the safe use of cranes, in November 1972. It was reissued as part of BS 5744 in 1979 and replaced in May 1989 by BS 7121-1, now in its 2016 edition, which covers the planning and management of lifts. BS 7121 calls the competent person who plans a lift the "appointed person", who keeps responsibility for the lift even when tasks are handed to others. In Britain the Health and Safety Executive (HSE) says that when a crane is hired, planning and supervising the lift stays with the user unless the crane company takes it on under a "contract lift".
Credit
British Standards Institution
1996
Lifts rehearsed on screen
Lift planning software lets a planner draw the crane, the load and the site on a computer and check a lift before the crane arrives. American Cranes & Transport traces it to Compu-Crane, founded by Doug Williams and Earl Johnson III; Jim Meehan started Lift Planner in 1996, and Tawnia Weiss, who had worked at Compu-Crane, founded A1A Software, which first developed 3D Lift Plan in 2007. In 2021 the magazine called 3D Lift Plan the most widely used lift planning software in North America and said most crane makers supply their cranes' data to it and to Lift Planner.
Credit
Doug Williams and Earl Johnson III (Compu-Crane), Jim Meehan (Lift Planner), Tawnia Weiss (A1A Software)
1999
Big Blue falls in Milwaukee
On 14 July 1999, at the Miller Park baseball stadium then being built in Milwaukee, Wisconsin, a Lampson Transi-Lift crane called Big Blue collapsed while lifting a curved roof section. The section weighed 913,000 lb (about 414 tonnes), and with 32,400 lb of rigging and hook the lift was at 97% of the crane's capacity as configured. The load was about 300 ft (90 m) up when it fell, killing three ironworkers in a personnel basket hung from another crane. In settling with OSHA, the US Occupational Safety and Health Administration, the crane company Lampson International stopped contesting an amended citation that said the maker's chart capacities do not take account of wind on the hanging load and that the employer had not adequately considered it; Lampson made no admission for civil cases.
LessonA load chart assumes still air, so a lift plan must add the wind's push on a large load.
Credit
OSHA investigators; settlement filed with the Occupational Safety and Health Review Commission
2014
Check the ground first
In October 2014 the UK's Construction Plant-hire Association (CPA) launched Ground Conditions for Construction Plant, free guidance on the pressure cranes and other machines put on the ground and how to check that the ground can carry it. The CPA said ground failure is a frequent cause of minor incidents and near misses, and of a significant number of serious injuries and deaths. The guide includes a simple tool that gives an indicative safe load for outrigger mats (pads laid under the feet of a crane's outriggers) by pad shape, pad size and type of ground, and it is meant to show site staff when to call a geotechnical or structural engineer. HSE, the Temporary Works Forum and contractors' bodies took part.
Credit
Construction Plant-hire Association (Tim Watson), with Mark Davies of RNP Associates
2014
Standard and critical plans
The American Society of Mechanical Engineers (ASME) published P30.1, Planning for Load Handling Activities, in 2014, a US standard for planning any move of a load, up or sideways. It sorts lifts into two kinds with their own plans, a standard lift plan and a critical lift plan, chosen by the nature of the lift and how exposed it is to things that affect safety. New editions followed in 2019 and 2024 (published 2025), and ASME has placed the standard on "stabilized maintenance", meaning it changes only when someone asks.
Credit
ASME
Watch for
A chatbot for lifting rules
Researchers at the University of Hong Kong built HeLPer, a chatbot that answers questions about crane-lifting rules from codes of practice, guidebooks and project documents. It runs on a fine-tuned Llama 3 model with retrieval-augmented generation, meaning it looks up passages in a document store before it answers. In the authors' own tests it scored highest of the models compared, including GPT-5.2, with accuracy 60% better than the base Llama 3; they say consistency and response time still need work.
Achieved whena group outside the authors tests it on lifting questions it has not seen, or a contractor reports its error count on live projects.
Claimed by
Zhiqian Zhang, Juhao Su and Wei Pan, University of Hong Kong, November 2026
Lift plans drafted by AI
Gheorghe Busuioc, founder of the UK firm Construct Tech and a former slinger-signaller (the worker who attaches loads and signals the crane operator), says his system combines AI-generated lift plans with 3D visuals, training videos, QR codes and a digital daily-checks app, built because many lift plans go unread on site. No figures on the plans' accuracy were given.
Achieved whenappointed persons outside the company review a sample of its plans against BS 7121 and publish how many needed changes.
Claimed by
Gheorghe Busuioc, Construct Tech, April 2026
Open
01
Check lift plans by machine
Software that reads a finished lift plan (the method statement, crane setup, load weight, rigging, ground check and wind limit) and flags missing items and wrong numbers against the checklists in BS 7121-1 and ASME P30.1. Examples: a load above the chart capacity at the planned radius, rigging weight left out of the total, no wind limit for a large load, no check of the ground under the outriggers. An appointed person reviews every flag.
The briefCredit · unclaimed02
Load charts as open data
An openly licensed, documented file format for crane load charts (the tables of what a crane may lift at each boom length, radius and setup) that records every setup a chart covers, a converter that turns a maker's PDF chart into that format, and a checker that compares every value with the source, with the error rate published. The files are for research and for testing planning tools, never a substitute for the chart in the cab.
The briefCredit · unclaimed
Open 01 · the brief
Check lift plans by machine
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
Software that reads a finished lift plan (the method statement, crane setup, load weight, rigging, ground check and wind limit) and flags missing items and wrong numbers against the checklists in BS 7121-1 and ASME P30.1. Examples: a load above the chart capacity at the planned radius, rigging weight left out of the total, no wind limit for a large load, no check of the ground under the outriggers. An appointed person reviews every flag.
Why it is still open
Tools that write plans or answer questions exist, but none that reviews a plan someone else wrote. Construct Tech says it generates plans with AI; the University of Hong Kong's HeLPer, built to support compliance checking, answers a person's questions about lifting rules but does not read a plan; 3D Lift Plan and Lift Planner check a lift the planner draws inside the software. Open-source projects on GitHub do the same: ProQee (2026) checks rigging calculations against DNV, ASME B30 and ISO rules for plans built in it, and a Brazilian crane firm's student-built app (2026) assembles its rigging plans. A web search for a tool that checks lift plans against BS 7121 found none, and no published error rate for lift plans.
Built with what exists
A document-reading AI model such as the Claude-based reviewer Enveda described (see the Note "Seven more flagged"); purchased copies of BS 7121-1 and ASME P30.1 for the checklists; Python to recompute load totals and each lift's percentage of chart capacity.
First step
Ask a crane hire firm for ten past contract-lift plans with client names removed, and write down the checks its appointed person applies to each.
Done looks like
100 lift plans, 30 of them with errors planted by an appointed person and not disclosed to the tool; the tool's catches and false alarms published next to those of two appointed persons reviewing the same plans; a pass means it misses no planted error that changes the percentage of capacity or leaves out a ground or wind check.
Open 02 · the brief
Load charts as open data
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An openly licensed, documented file format for crane load charts (the tables of what a crane may lift at each boom length, radius and setup) that records every setup a chart covers, a converter that turns a maker's PDF chart into that format, and a checker that compares every value with the source, with the error rate published. The files are for research and for testing planning tools, never a substitute for the chart in the cab.
Why it is still open
Charts are published as PDFs in operator manuals and specification sheets. A1A Software says 3D Lift Plan holds data for more than 900 cranes, some free because the maker sponsors them and others sold, and names no export or open format. Bigge, a crane company, offers a large free chart library, also as PDFs. Specification sheets warn that their layout differs from the machine's chart, as Terex's sheet for its RT 230XL crane does. The nearest thing to an open set is a Korean crane-selection tool on GitHub (September 2026) that stores charts for 75 cranes of 25 to 1,000 t from makers' public sheets as JSON files with a written schema. It keeps one setup per crane and at most 12 boom lengths, carries no license, and checks the files' structure but publishes no comparison of values with the source charts.
Built with what exists
pdfplumber or Camelot to pull tables from text PDFs; a vision-capable AI model for scanned charts; JSON Schema for the format, starting from the Korean project's schema with its author's permission; Python for the checker.
First step
Ask the Korean project's author whether its schema and files can be openly licensed, then convert ten public specification-sheet charts of one crane class with every counterweight, outrigger spread and working zone (over the side, front or rear) they list.
Done looks like
50 charts from at least five crane makers converted with every setup they cover; every value compared with the source by the checker and by a second person; the error rate per value published; no value in the released files higher than the chart it came from; the files released under an open license.