The concrete trade builds the molds, sets the steel bars, places, compacts, finishes and cures fresh concrete on the building site, and repairs concrete structures when they decay.
1853
François Coignet, a chemical manufacturer, built a two-story house of concrete, 20 m by 15 m, beside his new factory at Saint-Denis, north of Paris, from concrete rammed in molds ("béton pisé moulé et massivé"); the historian Gilbert Richaud counts his Saint-Denis works among the first attempts in France to make concrete a cheap, everyday building material.
34
Milestones achieved across 6 domains.
6
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
The site trade began in France in 1853, when François Coignet built a house of concrete rammed into molds at Saint-Denis. Joseph Monier patented iron-reinforced tubs in 1867 and Ernest Ransome twisted steel bars in 1884. The first successful concrete pump, which a historian of construction equipment dates to 1927 in Germany, began to replace pouring towers, and power trowels, slipforms and system formwork followed in the 20th century.
Where it stands
About 14.0 billion m³ of concrete was made in 2020, by the Global Cement and Concrete Association's count, 40% of it for housing. Lasers set the height of large slabs, a robot ties bridge-deck bars, and pumps have pushed concrete more than 600 m up a tower. Forms, edges, inspections and repairs are still mostly hand work, and a 2007 European survey found almost half of concrete repairs showing signs of failure within five years.
What is open
Much of the open work is measuring what the trade now judges by eye or takes on trust: the pressure on real forms, shores against the drawing, coating damage on bars, vibration against voids, curing compound coverage and repair mortars against their labels. The rest is robots for the strips machines still leave, such as slab edges, and shared records, such as a casebook of pump boom failures and a register of how long repairs last. Most of it can be done with a phone, a university laboratory or public reports.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Formwork
Formwork is the temporary mold, with the shores and braces that hold it up, into which concrete is poured and which must stay in place until the concrete can carry its own weight.
5 · 1 · 2
Last achievedA building site that climbs2019
Watch forClimbing forms at a button
2
openReinforcement
Reinforcement is the steel, or sometimes glass-fiber bar, that is placed and tied inside the forms before the pour so the hardened concrete can carry the pulling forces it cannot carry alone.
6 · 1 · 2
Last achievedA code for glass-fiber bars2022
Watch forBar insertion learned in simulation
2
openPouring and pumping
Pouring and pumping is the work of moving fresh concrete from the delivery truck into the forms, by chute, bucket, pump or placing boom, and working it into every corner and around the steel before it stiffens.
5 · 1 · 2
Last achievedHidden cracks drop booms2021
Watch forBooms that follow a plan
2
openFinishing
Finishing is the work done on the top of a fresh slab as it stiffens: striking it off to height (screeding), floating and troweling it smooth and dense, and checking how flat and level it came out.
5 · 1 · 2
Last achievedScanners fail the flatness test2019
Watch forFloors measured for robots
2
openCuring and testing
Curing keeps new concrete wet and within a safe temperature range long enough for the cement to react, and site testing checks each load and the hardening concrete against what was specified.
6 · 1 · 2
Last achievedEnough compound beats even compound2025
Watch forRadar checks the curing coat
2
openRepair
Repair finds out why hardened concrete is cracking, spalling or rusting inside, then patches, strengthens or protects it so the structure can stay in service.
7 · 1 · 2
Last achievedA code for repairs2013
Watch forCement that reseals its cracks
2
open
Advances to build with
1 research note
Open in concrete
3 of 12 open deliverables
Open · Formwork
Form pressures from real pours
A public table of the pressure that fresh concrete puts on full-height site forms for walls and columns, each pour with its form height, pour rate, concrete temperature, slump or flow and mix type, set beside the pressure predicted by the formulas in ACI 347R-14, DIN 18218:2010 and CIRIA Report 108, with each formula's error.
Built with what exists
The Crossref and Semantic Scholar APIs to find field studies; Python for the formulas and error statistics; for new data, a university test column about 2 m tall fitted with diaphragm pressure transmitters and a data logger.
Open · Reinforcement
A shared rebar-tying test
A standard bench mat and scoring rules for rebar-tying robots: a mat of 13 mm bars on chairs with plain, crowded and two-layer crossings, scored on the share tied, ties that let the bars slip under a fixed push, and seconds per tie, with results published for at least two systems and for a person tying by hand.
Built with what exists
A robot arm with about 5 kg payload, such as a Fairino FR5 or UFactory xArm 6, carrying a battery rebar tier such as MAX's Twintier; an Intel RealSense D435 depth camera; a policy trained from a few demonstrations, for example NVIDIA's GR00T 2 (see the Note "Five demonstrations per task"), alongside the published OpenTie method; a push gauge for the slip test.
Open · Pouring and pumping
A casebook of boom failures
A public table of every concrete placing boom collapse that a regulator, coroner or court has investigated and published, worldwide, with the date, country, boom length and age, the part that failed (king post, turning column, boom link, pipe), the kind of crack, the last time the boom was taken apart and tested, its repair history, the deaths and injuries, and a link to the source; and a short report on which parts and which inspection gaps recur.
Built with what exists
Published summaries from WorkSafeBC, WorkSafe Victoria, WorkSafe Queensland, JNIOSH, NIOSH's FACE fatality investigations and OSHA's accident search; a language model that answers a fixed list of questions for each report, such as Gemini Decision 1 (see the Note "A thousand questions, one pass"), with a person checking every row; a spreadsheet or SQLite file published under an open license.