Formwork

Formwork is the temporary mold, with the shores and braces that hold it up, into which concrete is poured and which must stay in place until the concrete can carry its own weight.

5

Milestones achieved, from 1969 to 2019.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1969

    Forms sold as systems

    Artur and Christl Schwörer founded PERI in Weissenhorn, Germany, with the stated aim of making building with concrete easier, faster and safer through standard, reusable formwork parts. Its first product was a timber formwork girder, the T 70, and in 1973 it brought out what it calls the world's first climbing scaffold, which moved the formwork and the working platform up a high-rise in one crane lift.

    peri.com

    Credit

    Artur and Christl Schwörer, PERI

  2. 1973

    Shores pulled too soon

    On 2 March 1973 part of the Skyline Plaza apartment building under construction at Bailey's Crossroads, Virginia, collapsed for its full height under the area where a floor slab was being cast, and the collapse spread through the attached parking garage. OSHA counted 14 workers killed and 34 injured. The National Bureau of Standards found that forms had been removed early, against OSHA's rules, that field-cured test cylinders had not been made, and that the 23rd-floor slab, still too weak, most likely failed in shear around its columns once its shoring came out.

    LessonA slab must be shown to be strong enough before its shores come out; OSHA's concrete rules now say forms and shores may not be removed until the employer determines, from the plans or a standard strength test, that the concrete can carry its load.

    nvlpubs.nist.govosha.gov

    Credit

    Edgar V. Leyendecker and S. George Fattal, National Bureau of Standards, for OSHA

  3. 1973

    Forms that rise while pouring

    Construction of the CN Tower in Toronto began on 6 February 1973, and its concrete tower, which rose to 450 m, was shaped with a slipform: a ring of forms that is jacked steadily upward while concrete is placed into it, so the walls rise without the forms being taken down and set up again.

    thecanadianencyclopedia.ca

    Credit

    Canadian National, owner, and its builders

  4. 2019

    Mesh as form and steel

    At the DFAB HOUSE on the NEST research building in Dübendorf, Switzerland, a mobile robot called the In situ Fabricator built on site a dense steel mesh that serves as both the reinforcement and the formwork of a slender, doubly curved, reinforced concrete wall. The method, called Mesh Mould, folds the two jobs into one robotic process, with the mesh acting as a "leaking formwork" that holds the concrete.

    link.springer.com

    Credit

    Kathrin Dörfler, Norman Hack, Timothy Sandy and colleagues, ETH Zurich

  5. 2019

    A building site that climbs

    China Construction Third Engineering Bureau builds towers beneath a platform that encloses the top floors, where workers fix rebar, assemble formwork and pour concrete, and that lifts itself one floor when a floor is done. China Daily, a state newspaper, reported in 2019 that the super-tall version was in its fourth generation after ten years of development, could bear more than 1,000 t and carry four tower cranes; by 2026 CGTN reported a smaller version, of more than 200 t, building housing in Urumqi. The developer says a floor can be finished in as little as four days, cutting the overall schedule by about 30%.

    chinadaily.com.cnnews.cgtn.com

    Credit

    China Construction Third Engineering Bureau

Watch for

  1. Climbing forms at a button

    Doka says its Shear Wall Climber SCP with FormDrive lets a crew raise whole levels of formwork, platforms and concrete placing equipment for a building core from a control panel, without a crane, and that it lowers labor and setup time. Its Boston reference project, the 17-story One Harbor Shore Drive, lists a cycle time of 1 to 2 days.

    Achieved whena contractor or researcher outside Doka publishes measured crew hours and days per floor for a core built with it, set against a comparable core built with conventional climbing forms.

    informedinfrastructure.comdoka.com

    Claimed by

    Doka, March 2026 (US launch)

Open

  1. 01

    Form pressures from real pours

    A public table of the pressure that fresh concrete puts on full-height site forms for walls and columns, each pour with its form height, pour rate, concrete temperature, slump or flow and mix type, set beside the pressure predicted by the formulas in ACI 347R-14, DIN 18218:2010 and CIRIA Report 108, with each formula's error.

    The brief
    Credit · unclaimed
  2. 02

    Shore layout against the drawing

    A tool that scans a field of shores, the adjustable posts that hold up slab formwork, with a phone's lidar or a set of photos, finds every shore, and reports spacing, lean from vertical and missing shores against the formwork drawing.

    The brief
    Credit · unclaimed

Open 01 · the brief

Form pressures from real pours

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of the pressure that fresh concrete puts on full-height site forms for walls and columns, each pour with its form height, pour rate, concrete temperature, slump or flow and mix type, set beside the pressure predicted by the formulas in ACI 347R-14, DIN 18218:2010 and CIRIA Report 108, with each formula's error.

Why it is still open

The largest compiled set found, by Kandiri, Shakor and Kurda (2022), holds 113 results from 30 earlier experiments, and the authors note most come from forms no more than 3 m high. Doka sells a sensor, DokaXact Pressure, that measures fresh concrete pressure on site, but publishes no data from it, and an open calculator on GitHub (saurabhdhon/formwork-pressure-calculator) applies the ACI 347 formula without any measured pours.

ijcsm.springeropen.comdoka.com

Built with what exists

The Crossref and Semantic Scholar APIs to find field studies; Python for the formulas and error statistics; for new data, a university test column about 2 m tall fitted with diaphragm pressure transmitters and a data logger.

  1. First step

    List every paper since 1990 that reports pressures measured on site forms, such as Stašauskas and Daukšys (Buildings, 2026, embedded pressure sensor on a single-sided wall), and extract the first ten pours.

  2. Done looks like

    At least 60 site pours from at least 10 independent sources in one open table, every formula computed for every pour, and the mean and worst-case error of each formula published with the code.

Open 02 · the brief

Shore layout against the drawing

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A tool that scans a field of shores, the adjustable posts that hold up slab formwork, with a phone's lidar or a set of photos, finds every shore, and reports spacing, lean from vertical and missing shores against the formwork drawing.

Why it is still open

OSHA requires shoring equipment to be inspected to see that it meets the formwork drawings, and the check is made by eye and tape. The Skyline Plaza investigators photographed shores out of plumb, battered shores reused and reshoring missing. The nearest prior work is on wall forms: Keyi Wu, Samuel Prieto, Eyob Mengiste and Borja García de Soto (Buildings, 2024) measured the spacing of studs, wales, ties and braces from laser scans on a real site and compared five cases with tape measurements, but did not cover slab shores, their lean or missing posts. The same check for rebar has been built several times (Wang and colleagues, Buildings, 2024, a depth camera measuring rebar spacing and cover in a slab to within 5 mm).

osha.govarxiv.orgdoi.org

Built with what exists

An iPhone Pro's lidar and a scanning app that exports point clouds; Open3D for finding vertical cylinders (RANSAC fitting); Meta's SAM 2 segmentation model for photos; Python to compare positions with a shoring plan read from the drawing.

  1. First step

    Borrow 20 steel shores from a formwork rental yard, stand them in a 4 by 5 grid on a level floor with three seeded faults, and scan the grid.

  2. Done looks like

    On 10 unloaded mock shore fields of 20 to 40 shores each, set up in a yard or a college construction lab with seeded faults (a missing shore, a shore 2° out of plumb, spacing 150 mm over plan), the tool finds every fault and measures spacing within 25 mm of a tape measure, with scans and results published.