Pouring and pumping
Pouring and pumping is the work of moving fresh concrete from the delivery truck into the forms, by chute, bucket, pump or placing boom, and working it into every corner and around the steel before it stiffens.
5
Milestones achieved, from 1927 to 2021.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1927
Pipes replace pouring towers
In the early 1900s, big pours were fed from tall towers, first of timber and, by 1921, also of steel: concrete went up inside the tower in a bucket, then ran down chutes to the forms, and some such plants covered a 300 ft (90 m) radius, by the account of Tom Berry, archivist of the Historical Construction Equipment Association. Berry dates the first successful concrete pump to 1927. That year the German engineers Max Giese and Fritz Hell, dissatisfied with the pouring tower, set out to pump concrete from the mixer straight to the point of use. Mobile cranes made the towers obsolete in the 1930s.
Credit
Max Giese and Fritz Hell; Insley, maker of towers and chutes
1970
A boom on the truck
A boom pump is a truck carrying both the pump and a folding arm, the placing boom, that holds the delivery pipe out over the pour, so one truck can reach a slab or wall without a crane and bucket. Schwing, founded in Germany by Friedrich Schwing in 1934, shows its pumps with a lattice boom in 1968 and dates its patented Roll and Fold boom to 1970, by its own history. Booms of 32 m to 38 m now place routine house, wall and slab pours, as in the WorkSafe cases under 2021 below.
Credit
Friedrich Schwing's company, Schwing GmbH
1988
Concrete that compacts itself
Ordinary concrete has to be shaken with vibrators after placing to drive out air and fill the forms, and doing that well takes skilled workers. As their number fell in Japan, Hajime Okamura of the University of Tokyo proposed in 1986 a concrete that would flow into every corner of a form and around the steel under its own weight. With Ozawa and Maekawa he completed the first prototype of self-compacting concrete in 1988, from materials already on the market.
LessonWhen the skill that makes good concrete becomes scarce, the mix can be changed to need less of it.
Credit
Hajime Okamura and colleagues, University of Tokyo
2008
Pumped 606 m up
On the Burj Khalifa in Dubai, three trailer-mounted Putzmeister pumps run as one station by the subcontractor Unimix pushed concrete to a height of 606 m in April 2008, which Putzmeister calls the world record for vertical pumping. The station pumped about 165,000 m³ of high-strength concrete in 32 months, through pumps modified for concrete pressures that Putzmeister's engineers said could theoretically exceed 400 bar. SANY, a Chinese pump maker, says its pumps reached 621 m on the core of the Goldin Finance 117 tower on 8 September 2015, a height it says Guinness recognized.
Credit
Putzmeister and Unimix; SANY
2021
Hidden cracks drop booms
Every stroke of the pump shakes the boom, and cracks can grow where no daily check can see them. In 2002 a 12-year-old 21 m boom broke at a condominium site in Japan and killed a worker; Japan's National Institute of Occupational Safety and Health (JNIOSH) traced it to fatigue cracks at a weld edge, grown by the cyclic stress of pump pressure. In March 2021 a 38 m boom in British Columbia fell and killed two people when its turning column broke at a weld; it had been weld-repaired after damage four months before, and its steel had very poor resistance to cracking. In May 2021 a 32 m boom at St Albans, Victoria, killed its operator when the king post inside the turret snapped on a fatigue crack that WorkSafe Victoria said could have been found a year or more earlier by removing and testing the post.
LessonInspections that never take the boom apart cannot find the cracks that bring it down.
Credit
investigations by JNIOSH, WorkSafeBC and WorkSafe Victoria
Watch for
Booms that follow a plan
Putzmeister says its AutoPouring software moved a boom pump by itself along a pre-planned path to cast the floor slab of the Weissenhof.Forum in Stuttgart, with the builder ZECH Hochbau, while the operator watched, authorized the movement and still controlled the amount of concrete. Automatic control of the amount is still a research project, run as a master's thesis.
Achieved whena contractor or testing body outside Putzmeister reports AutoPouring slabs on several sites, with placing rates, measured flatness and the number of times the operator had to take over.
Claimed by
Putzmeister, April 2026
Open
01
A casebook of boom failures
A public table of every concrete placing boom collapse that a regulator, coroner or court has investigated and published, worldwide, with the date, country, boom length and age, the part that failed (king post, turning column, boom link, pipe), the kind of crack, the last time the boom was taken apart and tested, its repair history, the deaths and injuries, and a link to the source; and a short report on which parts and which inspection gaps recur.
The briefCredit · unclaimed02
Vibration logs against voids
A laboratory test that links a record of where and how long a poker vibrator was held in the concrete to the voids found once it hardens. Cast about two dozen small reinforced blocks, vibrate some well and some badly on purpose, log the vibrator by camera and by a motion sensor on its head, then saw the blocks open and measure the void area on the cut faces.
The briefCredit · unclaimed
Open 01 · the brief
A casebook of boom failures
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of every concrete placing boom collapse that a regulator, coroner or court has investigated and published, worldwide, with the date, country, boom length and age, the part that failed (king post, turning column, boom link, pipe), the kind of crack, the last time the boom was taken apart and tested, its repair history, the deaths and injuries, and a link to the source; and a short report on which parts and which inspection gaps recur.
Why it is still open
Each regulator publishes its cases one at a time, and searches found failure analyses of single booms but no table across countries. The nearest is a one-country count: Kento Yamagaki and colleagues at Nihon University sorted 212 concrete pumping accidents in Japan by type, from workers falling to booms, outriggers and turning stands breaking, and counted 27 deaths, without each machine's inspection and repair history. WorkSafeBC's February 2026 report on a 2023 collapse found that fatigue cracks had grown for years unnoticed, that a 2007 design upgrade from the maker never reached the owner, and that standards and regulations do not specifically require taking the boom apart at the annual inspection.
Built with what exists
Published summaries from WorkSafeBC, WorkSafe Victoria, WorkSafe Queensland, JNIOSH, NIOSH's FACE fatality investigations and OSHA's accident search; a language model that answers a fixed list of questions for each report, such as Gemini Decision 1 (see the Note "A thousand questions, one pass"), with a person checking every row; a spreadsheet or SQLite file published under an open license.
First step
Code the four cases above (JNIOSH 2002, WorkSafeBC 2021 and 2023, WorkSafe Victoria 2021) into a draft form, then pull every concrete pump entry from OSHA's accident search and WorkSafeBC's incident summaries.
Done looks like
At least 40 investigated failures from at least six countries, each row linked to its source, every row coded by two people with their agreement reported, and published counts by failed part and by whether the boom had ever been taken apart for testing.
Open 02 · the brief
Vibration logs against voids
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A laboratory test that links a record of where and how long a poker vibrator was held in the concrete to the voids found once it hardens. Cast about two dozen small reinforced blocks, vibrate some well and some badly on purpose, log the vibrator by camera and by a motion sensor on its head, then saw the blocks open and measure the void area on the cut faces.
Why it is still open
Monitoring systems exist, but they are checked against video, not against the concrete. Sanggyu Lee and M. Skibniewski (2022) track the positions of the workers placing and vibrating concrete on site and send alerts when the measured values fall out of the required ranges, and validated the system by comparing its data with a video record. Ren and colleagues (2024) estimate the pose of vibrator racks at a Chinese arch dam from camera images and checked their method in simulation. Neither published a comparison of the log with voids in the hardened concrete.
Built with what exists
A 25 to 38 mm electric poker vibrator of the kind hired for house pours; plywood forms with small rebar cages; a phone camera with a YOLO pose model and OpenCV to track the vibrator head; an ESP32 board with an accelerometer in a waterproof sleeve to log on-time; a concrete saw in a university materials lab; ImageJ to measure void area on photos of the cut faces.
First step
Cast six trial blocks with no vibration, short vibration and normal vibration, and check that the cut faces differ clearly enough to score.
Done looks like
24 blocks, each published with its vibration log and photos of three cut faces, and a reported tally of how often the log's "under-vibrated" flag matches blocks whose faces show more than a stated void area, with misses and false alarms counted.