Industries / Construction and property / Commercial and residential construction
Finishes
This is the work that closes in and finishes a building's surfaces: wallboard and plaster, paint, tile, floors, ceilings, and the cladding on the outside.
5
Milestones achieved, from 1894 to 2021.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
In depth
The same ground is charted in more depth, as industries of their own.
The road
AchievedWatch forOpen
Achieved
1894
Gypsum board is patented
Augustine Sackett's US patent 520,123, granted on 22 May 1894, describes a board of alternating layers of paper and plaster of paris, meant to replace thin wood strips (lath) covered in wet plaster on inside walls. It is the ancestor of today's drywall.
Credit
Augustine Sackett
1977
US bans lead paint
On 1 September 1977 the US Consumer Product Safety Commission banned consumer paint with more than 0.06% lead, for products made after 27 February 1978, and in December 1977 it banned consumer patching compounds with added asbestos. Patching compound fills cracks and joints and is then sanded smooth, which puts its contents into the air. The lead limit fell to 0.009% in 2009. By the World Health Organization's count, 48% of countries had confirmed legally binding controls on lead paint as of January 2024.
LessonSanding and scraping are part of finishing, so any harmful ingredient in a finish ends up as dust that workers and families breathe.
Credit
US Consumer Product Safety Commission
2009
Imported drywall corrodes homes
Drywall imported into the US from China between 2004 and 2007 gave off sulfur gases that corroded copper pipes, air-conditioning coils, wiring and appliances; a 2010 paper counts more than 550 complaints to the Consumer Product Safety Commission from 19 states and the District of Columbia. The Drywall Safety Act of 2012, signed in January 2013, made labeling rules for gypsum board mandatory and required a federal sulfur limit.
LessonBoards that look the same can differ in chemistry, so every board must be traceable to its maker.
Credit
Hooper and colleagues (International Journal of Molecular Sciences, 2010); US Congress
2017
Grenfell Tower cladding fire
On 14 June 2017 fire spread up the outside of Grenfell Tower, a residential block in London, and killed 72 people. The public inquiry found the main reason for the rapid spread was aluminum composite panels with polyethylene cores fitted as cladding. Its final report, on 4 September 2024, found that all 72 deaths were avoidable, that the panel maker Arconic "deliberately concealed" the danger, and that insulation makers manipulated fire tests.
LessonCladding must be tested and certified honestly as a whole wall, because a product sold as compliant can still carry fire up a tower.
Credit
Grenfell Tower Inquiry, chaired by Sir Martin Moore-Bick
2021
Drywall robot on paying jobs
Canvas built a robot arm on a scissor lift that sprays joint compound on drywall and sands it. The contractor Webcor used it on the 73,000 sq ft Newark Civic Center in California and in a boarding area of San Francisco airport's Terminal B, and a Webcor manager said it "increased our ability to deliver faster and more reliably". Canvas trains union finishers to run the robot. Its time savings are its own figures.
Credit
Canvas (San Francisco); Webcor
Watch for
Drywall robots on lifts
JLG, a maker of aerial work platforms, bought Canvas's core technology, and Canvas's staff joined JLG, which plans to pair it with its lifts to automate interior work such as drywall finishing. No product date was given.
Achieved whenJLG sells or rents a product using the system and a contractor outside JLG reports using it on a project.
Claimed by
JLG, January 2026
Painting and skim-coat robots
Legend Robot, of Shenzhen, showed a wall-painting robot that reaches 6.2 m and a robot that sprays putty for skim coats, for high ceilings and commercial walls, and claims a 50% efficiency gain and a "verified" cost cut of more than 60%, naming no verifier or baseline.
Achieved whenA named contractor or an independent tester publishes measured output and cost against a hand crew on the same job.
Claimed by
Legend Robot, February 2026
Open
01
Drywall finish-level grader
A public, labeled set of photos of finished drywall joints under raking light, light shone low across the wall to show ridges, and a model that predicts the finish level and flags defects such as ridges, tool marks and visible screw heads. A finish level is the trade's name for how much taping, coating and sanding a wall has had.
The briefCredit · unclaimed02
Tile lippage from a scan
A method that maps lippage at every joint of an installed tile floor from a scan, tested against the straightedge and feeler gauge. Lippage is the height step between the edges of neighboring tiles; guidance cited by the Ceramic Tile Education Foundation allows 1/32 in for common joints.
The briefCredit · unclaimed
Open 01 · the brief
Drywall finish-level grader
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public, labeled set of photos of finished drywall joints under raking light, light shone low across the wall to show ridges, and a model that predicts the finish level and flags defects such as ridges, tool marks and visible screw heads. A finish level is the trade's name for how much taping, coating and sanding a wall has had.
Why it is still open
A CertainTeed patent says the industry's finish levels are "a list of steps to be completed" rather than a measure of the result, and that better ways to define them "continue to be of interest". This research found no public dataset labeled by finish level.
Built with what exists
Drywall offcuts, joint compound and hand tools; a phone and an LED bar for raking light; an open vision model fine-tuned on a small set of examples.
First step
Finish ten joints each to levels 3, 4 and 5, and photograph them under fixed light.
Done looks like
300 photos of 60 test joints, each graded by three working finishers, published with the model's agreement with the finishers' majority grade next to how well the finishers agree with each other.
Open 02 · the brief
Tile lippage from a scan
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A method that maps lippage at every joint of an installed tile floor from a scan, tested against the straightedge and feeler gauge. Lippage is the height step between the edges of neighboring tiles; guidance cited by the Ceramic Tile Education Foundation allows 1/32 in for common joints.
Why it is still open
A 2024 IEEE paper says ceramic tile flatness is still mostly checked by hand with a steel ruler and feeler gauge, and its authors, who scanned tiles in the factory, call theirs the first study of tile flatness with 3D scanners. This research found no study of lippage on installed floors.
Built with what exists
Tile set on cement board test panels; feeler gauges and a straightedge; a phone depth sensor or a low-cost structured-light scanner; open point-cloud software. Phone depth sensors may not resolve steps under 1 mm, so test that first.
First step
Set one board, gauge 20 joints, and scan it with two different devices.
Done looks like
Five boards with 100 joints, half set with planted lippage from 0 to 2 mm, with gauge and scan readings for each joint published, the mean error, and the share of joints over 1/32 in that the scan caught.