Industries / Construction and property / Commercial and residential construction
Painting
The painting trade prepares and paints the walls, ceilings, trim and outsides of houses and other buildings, by brush, roller or spray, to protect them and give them color.
1283
The earliest record of a painters' guild in London, the "Paynters", is a set of ordinances (trade rules) recorded in 1283, according to its successor, the Worshipful Company of Painter-Stainers; its members painted and gilded wood, metal and stone, including the interiors of churches.
27
Milestones achieved across 6 domains.
5
To watch for: announced, not yet confirmed outside.
12
Open deliverables. Nobody has shipped them.
In one minute
Where it started
Painters in medieval London kept a guild, first recorded in 1283, that set rules for the trade and fought other trades over who could do which work. It joined with the stainers, who painted cloth hangings, in 1502 and received a royal charter in 1581. For centuries painters mixed their own paint from white lead, oil and pigment and put it on by brush, until factory-made paint, the roller of about 1940 and the airless sprayer of 1958 changed how fast a wall could be covered.
Where it stands
Paint for building walls is the largest part of the paint industry by both volume and value. ChemQuest, a consultancy, puts the whole industry at 48.9 billion liters in 2024 and decorative paint for buildings at 27.7 billion liters, worth EUR 81 billion. Most of it still goes on by hand. Lead paint banned decades ago remains on older walls, and the few painting robots on sale mostly spray open walls, with speed figures that come from their makers.
What is open
Many of the trade's working numbers have never been tested in public: how far phone scans miss on paintable area, how long jobs really take against the bid, how true a visualizer app's colors are, and how hot a heat gun actually blows. Painting robots have no shared test against painters in the same room, and no robot yet cuts a straight edge with a brush. Each job can be attempted with phones, low-cost instruments, open robot software and AI models that read documents.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Estimating
Estimating is measuring the surfaces to be painted, working out the labor hours and paint they will take, and turning that into a price.
4 · 1 · 2
Last achievedPhones draw the room2022
Watch forAI takeoffs for painters
2
openSurface preparation
Surface preparation is the work done before paint goes on: washing, scraping, sanding, filling, caulking and priming, and checking that the surface is dry and sound.
4 · 0 · 2
Last achievedBare wood spoils the paint2001
2
openSpraying, rolling and brushing
This is the work of putting paint on walls, ceilings and trim by brush, roller or spray gun, and of doing it without harming the painter.
5 · 0 · 2
Last achievedPainting named a cancer cause1989
2
openColor
This is the work of choosing, naming, specifying and matching the colors a building is painted, from a color card or a scanned sample to the tinted can.
4 · 1 · 2
Last achievedPocket color readers scored2024
Watch forAn AI agent picks colors
2
openRobots
This is the work of machines that spray, roll or sand walls and ceilings, inside rooms or on the outside of a building, in place of a painter on a ladder, a lift or a hanging platform.
4 · 2 · 2
Last achievedField test finds slow robot2026
Watch forRobots sand a Netflix venue
2
openLead paint
This is the work of living with, testing for and safely repainting over the lead-based paint left on older buildings, and the laws and lawsuits that decided who carries the risk and the cost.
6 · 1 · 2
Last achievedWipes find lead taken home2025
Watch forA spray glows on lead
2
open
Advances to build with
1 research note
Open in painting
3 of 12 open deliverables
Open · Estimating
Phone scans checked for painting
A public test of whether phone room scans give the wall and ceiling areas a painter bids on. Scan at least 20 furnished rooms with two or more apps built on RoomPlan, turn each scan into paintable area under PCA's P10 counting rules, and compare that, room by room, with the same rooms measured by a painter with a tape and a laser distance meter.
Built with what exists
An iPhone or iPad Pro with a LiDAR sensor; apps built on Apple's RoomPlan, such as RoomScan Pro or Magicplan; a laser distance meter and tape; a short Python script that applies the P10 rules (openings of 100 square feet or more deducted, smaller ones not) to each scan's exported walls and openings.
Open · Surface preparation
Bare-wood test, today's primers
A repeat of FPL's weathering-before-paint test with the primers and siding woods sold today. Boards from one batch are left outdoors bare for 0, 1, 2, 4, 8 and 16 weeks, half of each set is scuff-sanded, and all are primed with three widely sold primers, then tested for adhesion and photographed outdoors each year after.
Built with what exists
Pine or cedar siding boards; an outdoor rack facing south; three current acrylic primers; a portable pull-off adhesion tester used to ASTM D4541, in which a metal disc glued to the paint is pulled off and the force recorded; a camera.
Open · Spraying, rolling and brushing
Why sprayer injections happen
A public table of the paint-sprayer injection injuries in the US emergency room sample since 2000, each coded by what the person was doing when it happened, such as clearing a clogged tip, wiping the tip, testing the spray with a hand, or working with the tip guard off, with a national estimate for each cause.
Built with what exists
The National Electronic Injury Surveillance System (NEISS), the US Consumer Product Safety Commission's free sample of emergency room visits, which gives each case a product code, a short narrative and a statistical weight; Python with pandas; a language model such as Claude to read each narrative and assign a cause from a fixed list, checked by a person on a sample (see the Note "A thousand questions, one pass").
