This trade installs the systems inside a building, the electrical wiring, the water and drain pipes, and the heating, ventilation and air conditioning, together often called MEP, for mechanical, electrical and plumbing.
7
Milestones achieved, from 1897 to 2024.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
In depth
The same ground is charted in more depth, as industries of their own.
The road
AchievedWatch forOpen
Achieved
1897
One national wiring code
Early electric lighting started fires; arc lamps, for one, set fire to waste fibers in New England woolen mills. In 1897 architects, electrical firms, insurers and property owners wrote a single shared code for installing wiring in the US. The National Fire Protection Association (NFPA) took it over in 1911 and still publishes it as the National Electrical Code.
Credit
those combined groups, then NFPA, as told by the International Association of Electrical Inspectors (IAEI)
1928
Air conditioning enters office towers
The 21-story Milam Building opened in San Antonio, Texas, in January 1928, and the American Society of Mechanical Engineers (ASME) calls it the first air-conditioned high-rise office building in the US.
Credit
a design team led by Willis H. Carrier of Carrier Engineering Corporation (ASME landmark no. 155)
1968
Shock protection enters the code
A ground-fault circuit interrupter (GFCI) cuts the power when current leaks out of a circuit, for example through a person. Professor Charles Dalziel of UC Berkeley invented it. The 1968 National Electrical Code first required GFCIs, for underwater swimming pool lights; the 1971 edition added outdoor outlets and outlets on construction sites, and the 1975 edition added bathroom outlets.
Credit
Charles Dalziel (UC Berkeley); NFPA's code committee
1986
Lead banned from drinking-water pipes
In 1986 the US Congress amended the Safe Drinking Water Act so that pipes, solder and flux that were not "lead free" could no longer be used in drinking-water plumbing. "Lead free" then meant no more than 8% lead in pipes and 0.2% in solder and flux; a 2011 law cut it to a weighted average of 0.25% on surfaces that touch water, by the US Environmental Protection Agency's account. The EU's 2020 drinking water directive halves its lead limit from 10 to 5 micrograms per liter within 15 years and calls lead pipes in existing houses "a persisting issue".
LessonA material installed for generations keeps poisoning water long after it is banned, because the old pipes stay in the walls.
Credit
US Congress and EPA; EU Council and Parliament
1987
Refrigerants change by treaty
The refrigerant is the fluid an air conditioner pumps around to move heat. The Montreal Protocol, signed in 1987, phases out chemicals that damage the ozone layer, including the refrigerants then used in air conditioning. Their replacements, called HFCs, turned out to be strong greenhouse gases, and the Kigali Amendment of 2016 phases them down too. In the US, new home and light-commercial systems installed from 1 January 2025 must use a refrigerant with a global warming potential of 700 or less, by EPA's rule; global warming potential measures how much heat a gas traps compared with carbon dioxide.
LessonInstallers have had to change refrigerants twice in one working lifetime, first to protect the ozone layer and then the climate.
Credit
UNEP Ozone Secretariat and the treaty's member countries; US EPA
2008
Pipes and ducts modeled first
In virtual design and construction (VDC), the trades build their pipes, ducts and cables in a shared 3D computer model before installing anything, and fix the places where two systems would collide in the model rather than on site. A peer-reviewed study of a $96.9 million healthcare project of about 250,000 square feet in Northern California reported 100% prefabrication for the plumbing contractor, under 0.2% rework for the mechanical contractor, 20 to 30% labor savings for the MEP contractors, no conflicts during installation, and about 6 months and $9 million saved.
Credit
Atul Khanzode and Martin Fischer (Stanford's Center for Integrated Facility Engineering); Dean Reed (DPR Construction)
2024
A robot drills ceiling anchors
Hilti introduced Jaibot in November 2020, a semi-autonomous robot that drills ceiling holes for MEP hangers at points read from the building model, work otherwise done by hand from ladders and lifts. In October 2024 the general contractor Hensel Phelps reported that Jaibot, run by the MEP firm Welch & Rushe, drilled about 3,000 anchor holes at NIH Building 40A; it gave no measured time or accuracy figures.
Credit
Hilti; Hensel Phelps; Welch & Rushe
Watch for
Layout robots cut labor hours
Layout means marking on the floor where walls, pipes, sleeves and fixtures go. A study comparing Dusty Robotics' layout robot with manual layout on an eight-floor medical office building in Los Angeles reported 68% fewer labor hours, 18% fewer days, 50% better accuracy, and rework down from 6.42% to 0.25%. It is peer-reviewed and Stanford-led, but one author works for Dusty Robotics and one for DPR Construction, the contractor.
Achieved whenResearchers with no tie to the maker repeat the comparison on other buildings, or contractors publish measured results across several projects.
Claimed by
Kam, Tanaka, Brosque, Roedel, Lau and Fischer, Construction Robotics journal, December 2025
Anchor drilling robots in Frankfurt
On an office building in Frankfurt, the contractor Ed. Züblin AG is using two fischer robots to drill about 16,000 holes, 10 mm wide and 25 mm deep, for heating and cooling ceiling panels; crews then set the anchors by hand. Züblin says accuracy is higher, and fischer says the robots log the depth, time and position of each hole and any reinforcing bar they hit, but no figures were published.
Achieved whenZüblin or an outside party publishes measured placement accuracy, drilling rate and rework against hand drilling.
Claimed by
fischer and Züblin, June 2026
Open
01
Firestop photo test
An open, labeled set of photos of through-penetration firestops, and a published test of a vision model against an inspector's checklist. A through-penetration firestop is the sealant or collar that closes the gap where a pipe or cable passes through a fire-rated wall. Build mock wall panels on a bench with planted defects, such as missing sealant, the wrong gap around the pipe, shallow sealant or a missing sleeve. No fire testing is involved.
The briefCredit · unclaimed02
A robot arm crimps PEX
A bench rig where a low-cost robot arm makes a PEX crimp joint. PEX is plastic water tubing joined by squeezing a metal ring over a fitting. The arm slides the ring onto the tubing, seats the fitting, places the joint in a fixed, guarded powered crimper, and then checks it with a go/no-go gauge, a simple tool that shows whether the ring was squeezed to the right size. The test is dry: no water, no pressure, no live plumbing.
The briefCredit · unclaimed
Open 01 · the brief
Firestop photo test
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open, labeled set of photos of through-penetration firestops, and a published test of a vision model against an inspector's checklist. A through-penetration firestop is the sealant or collar that closes the gap where a pipe or cable passes through a fire-rated wall. Build mock wall panels on a bench with planted defects, such as missing sealant, the wrong gap around the pipe, shallow sealant or a missing sleeve. No fire testing is involved.
Why it is still open
The ASTM E2174 standard describes how qualified inspectors check installed firestops on site by eye, and a Korean study of 39 sites found wide variation in quality, with some sites having no firestops at all. Multivista has marketed an "AI Firestop Assessment" since about 2021, but publishes no accuracy figures and no data. This research found no public image set.
Built with what exists
Drywall-and-stud mock-up panels; short lengths of pipe and cable; listed firestop sealant; a phone camera; an open object detector or vision-language model.
First step
Take one manufacturer's listed-system drawing, turn it into a defect checklist, and build 10 penetrations.
Done looks like
At least 500 labeled photos released under an open license, then 20 new mock penetrations scored by both the model and a trained inspector, with a published tally of misses.
Open 02 · the brief
A robot arm crimps PEX
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A bench rig where a low-cost robot arm makes a PEX crimp joint. PEX is plastic water tubing joined by squeezing a metal ring over a fitting. The arm slides the ring onto the tubing, seats the fitting, places the joint in a fixed, guarded powered crimper, and then checks it with a go/no-go gauge, a simple tool that shows whether the ring was squeezed to the right size. The test is dry: no water, no pressure, no live plumbing.
Why it is still open
A University of Waterloo ergonomics fact sheet says crimping takes "a high level of grip force" and "may be repeated hundreds of times a day and with awkward postures", and suggests battery crimpers and push fittings, not automation. This research found no robot that makes these joints.
Built with what exists
An SO-100-class arm trained by demonstration with the open LeRobot software (see the Notes "No download" and "Five demonstrations per task"); a fixed battery crimper with a guard; PEX offcuts, rings and fittings; a go/no-go gauge; a camera.
First step
3D-print a fixture that holds the crimper and tubing, then record 50 demonstrations with the arm under remote control.
Done looks like
20 filmed attempts, each gauged, with a published pass/fail tally and the time per joint compared with a person's.