Industries / Transport and vehicles / Maritime and shipping
Barge and inland waterways
Barge and inland waterway transport moves bulk cargo such as grain, coal, oil, chemicals and containers along rivers and canals, in barges pushed by towboats or in self-propelled river ships, through the locks, dams and dredged channels that keep the water deep enough to float them.
605
Emperor Yang of the Sui dynasty ordered the Tongji Canal opened between the Yellow River and the Huai River so that taxes and goods from the south could be shipped continually to the capital at Luoyang; with the Yongji Canal of 608 it formed the first north-to-south main line of China's Grand Canal, according to China's nomination of the canal as a World Heritage site.
41
Milestones achieved across 7 domains.
11
To watch for: announced, not yet confirmed outside.
14
Open deliverables. Nobody has shipped them.
In one minute
Where it started
China dug canals in sections from the 5th century BCE, and in 605 the Sui emperor began linking them into the Grand Canal to ship tax grain to the capital; UNESCO, which listed it as a World Heritage site in 2014, says it is "still in use today as a major means of communication." In 984 a Chinese engineer built a pound lock, a chamber with a gate at each end that lifts boats from one water level to the next. Steamboats began pushing cargo up the Mississippi in 1812, diesel towboats pushing rafts of barges replaced steam after 1945, and in the 20th century the big rivers of the US, Europe and China were dammed into chains of deep pools joined by locks.
Where it stands
The Central Commission for the Navigation of the Rhine (CCNR) counts 458.4 million metric tons carried on EU waterways in 2025, 3.2 percent less than in 2024, and 281.9 million on the Rhine alone. The American Society of Civil Engineers puts US inland freight at about 465 million tons a year on 25,000 miles of waterways with 237 lock chambers, and the deferred maintenance backlog at US$7.5 billion; China's Ministry of Transport estimates that ports on the main stem of the Yangtze handled 4.2 billion tons in 2025. Low water is the recurring limit: the Rhine gauge at Kaub set a record low in August 2026, as the Mississippi at Memphis did in October 2022.
What is open
Much of what sets a barge's load and a tow's day is not public or not checked. Nobody publishes a running score of the river forecasts that set loading depths, a forecast of how long a tow will wait at a lock, or a public ranking of which locks are likely to close next, and crew deaths are published as summaries rather than case by case. Most of these jobs need public gauge, lock and ship-tracking data, small AI models that read reports, and low-cost cameras and sensors, not new boats.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Towboats and barges
This is the boats themselves: the unpowered barges that hold the cargo, the towboats that push them lashed together in a raft called a tow, and the self-propelled river cargo ships common in Europe and China.
6 · 2 · 2
Last achievedA hydrogen towboat slips2025
Watch forFleet boats on swapped batteries
2
openRiver levels and channels
Barges need a channel of known depth, so this work keeps rivers deep and clear: pulling out sunken trees, dredging shoals, reading water levels at gauges, and setting how deep boats may load when the river falls.
5 · 1 · 2
Last achievedKaub falls to single figures2026
Watch forA deeper middle Rhine
2
openNavigation
Navigation is steering boats and tows along rivers and canals: knowing where the channel runs, what the water is doing, how high the bridges are, and where other boats are.
6 · 2 · 2
Last achievedBridge heights tied to gauges2024
Watch forNo captain on board
2
openLocks and dams
A lock is a chamber with gates at each end that raises or lowers boats between two water levels, and a navigation dam holds a river back into a chain of deep pools; this work is building, funding and running them.
7 · 1 · 2
Last achievedOlmsted opens, years late2018
Watch forA canal claims lock records
2
openLoading and assembling tows
This is the work at the riverbank: loading and unloading barges at terminals, parking them in fleets until a towboat collects them, putting them together into tows, and the freight data that prices each trip.
4 · 2 · 2
Last achievedContainers on the lower Mississippi2016
Watch forBarges counted from orbit
2
openCrew and safety
This is the work of staffing towboats and inland vessels, licensing and inspecting the people and boats, and learning from the accidents that kill crew members or the public.
7 · 2 · 2
Last achievedTowboats join the inspected fleet2022
Watch forDigital crew papers in Europe
2
openMaintenance
Maintenance keeps lock gates, machinery and concrete, and the barges and towboats themselves, in working order: inspecting them, often under water, and repairing or replacing parts while traffic waits or detours.
6 · 1 · 2
Last achievedGermany seals lock ratings2026
Watch forA setting for quoin gaps
2
open
Narrower industries
Advances to build with
1 research note
Open in barge and inland waterways
3 of 14 open deliverables
Open · Towboats and barges
Fuel per ton-mile by river
An open estimate of how much fuel towboats burn to move a ton of cargo one mile on each major US river, upstream and downstream separately, by tow size and river flow, with the method and code published.
Built with what exists
the Corps of Engineers' Waterborne Commerce tons and ton-miles for each waterway; its lock traffic records, which give each tow's barges and direction at each lock and already feed USDA's weekly barge counts; ship-tracking (AIS) records of towboat speeds; USGS river flow gauges; towboat horsepower from Coast Guard vessel records; Python with pandas; the TTI and Dager figures as checks on the totals.
Open · River levels and channels
Scoring low-water forecasts
An open scorecard for the river-level forecasts that decide how deep barges load: the National Weather Service (NWS) forecasts for the Mississippi at St. Louis, Memphis and Cairo, and the published forecasts for the Rhine at Kaub. For each gauge and each day of lead time, publish the average error, the bias at low water, and how often the forecast missed a fall below the level at which draft limits begin.
Built with what exists
The Iowa Environmental Mesonet's archive of NWS river forecast messages (RVF products); USGS and Corps gauge records for what happened; PEGELONLINE, the German federal gauge service, for Kaub readings; the BfG's 2008 to 2015 Kaub forecast set as a first test; daily saved copies of the Kaub forecasts on ELWIS, the German waterways administration's skipper site, from the first day of the project; Python with pandas.
Open · Navigation
A clearance for every span
A public table giving, for every bridge with more than one navigable span on the Ohio, Upper Mississippi and Illinois rivers, the vertical clearance of each span and the gauge it is measured from, compared with what the Corps' inland electronic charts and the National Bridge Inventory show.
Built with what exists
The Corps' IENC files, read with GDAL/OGR; the FHWA National Bridge Inventory; state transportation department bridge plans where published; USGS 3DEP airborne lidar to check the height of each span's underside; Corps and USGS gauge readings; QGIS.
Where it sits
Broader
