  1. 1987

    Diver surveys for barges

    US Coast Guard rules set how often tank vessels, tank barges among them, must be drydocked and have their hulls and cargo tanks examined, with a separate schedule for vessels that spend at least six months a year in fresh water. An owner may ask to replace alternate drydockings with an underwater survey by divers if the hull has an effective protection system; a vessel 15 years or older needs a full set of hull gaugings (measurements of steel thickness) at its next drydocking showing no appreciable deterioration. The section's text dates from a Coast Guard rule of 23 October 1987, amended through 2009.

    law.cornell.edu

    Credit

    US Coast Guard

  2. 1991

    A score for lock gates

    In 1984 the Corps of Engineers started its Repair, Evaluation, Maintenance, and Rehabilitation (REMR) research program to pay more attention to how fast its structures wear out. An Iowa State University team built inspection and rating methods that "uniformly and consistently describe the current condition of miter lock gates," the paired steel leaves that close like double doors at the ends of most lock chambers. By 1999 the Corps used a Condition Index from 0 to 100, computed from "objective and repeatable measurements," to set maintenance priorities.

    api.openalex.orgapi.openalex.org

    Credit

    Lowell Greimann, James Stecker, Anthony Kao and Kevin Rens, Iowa State University, for the Corps' REMR program

  3. 2015

    Strain gauges on gates

    Miter gates are used at more than 75 percent of US lock and dam sites. The Corps' SMART Gate study (Structural Monitoring and Analysis in Real Time of Lock Gates) put sensors on the downstream miter gates of Lock and Dam 27 near St. Louis to catch fatigue cracks, dragging debris or barge impacts that "may otherwise go unnoticed" until repairs become costly. Later work used strain and water-level readings at Greenup Lock and Dam to detect gaps forming where a gate bears on the lock wall, and after anchorage failures at Boggs Lock and Dam (2023) and Port Allen Lock (2024), strain gauges were installed to watch the repaired gates.

    dpi-proceedings.comdpi-proceedings.com

    Credit

    US Army Corps of Engineers and its Engineer Research and Development Center (ERDC), with Z. R. Treece, N. E. Wierschem and B. F. Spencer Jr

  4. 2024

    Cracks close Wilson Lock

    On 25 September 2024 divers found cracks in the lock gates of the main chamber at Wilson Locks and Dam on the Tennessee River in Alabama, a chamber completed in 1959, and the Corps closed it. Traffic moved to the 60-foot by 300-foot auxiliary lock, adding 16 to 24 hours of locking time for a typical 15-barge tow. The same year cracks in a monolith closed Holt Lock in June, and a miter sill failure closed Demopolis Lock for four months. Wilson reopened on 2 July 2025 after crews repaired both downstream miter gates and fitted new pintles (the hinges the gates swing on) made by Tennessee Valley Authority machinists.

    LessonWhen one chamber fails at a site with only a small spare, the cost lands on every tow for months: here more than nine months of locking times up to a day longer.

    waterwaysjournal.netwaterwaysjournal.net

    Credit

    US Army Corps of Engineers, Nashville District, and the Tennessee Valley Authority

  5. 2025

    One closure, planned together

    From 22 March to 11 April 2025, Germany's waterways office for the Danube and the Main-Danube Canal shut every lock on the canal and four on the Danube at once, at a time agreed with the shipping industry over two years, and bundled its repairs into that window. Eight of the 20 chambers were drained so that parts normally under water could be inspected and mended; about €10 million of contracts went to more than 150 outside workers, beside nearly 300 of the office's own staff and five diving teams. The office says all 32 lock gates on the canal have been replaced since 2008 during these yearly closures.

    bad-abbach.de

    Credit

    Wasserstraßen- und Schifffahrtsamt Donau MDK

  6. 2026

    Germany seals lock ratings

    Asked in the Bundestag about the condition of federal waterway structures, the German government answered on 20 April 2026 that 205 of its 617 weirs and locks are more than 100 years old. It classified the condition ratings themselves as confidential ("VS-Vertraulich"), saying publication could enable sabotage, and pointed to its ELWIS online service for current lock closures.

    dserver.bundestag.de

    Credit

    Federal Ministry of Transport (Bundesministerium für Verkehr)

Watch for

  1. A setting for quoin gaps

    The quoin is the joint where a miter gate leaf bears on the lock wall. Gaps set too tight or too loose there push load into the gate's anchorage and pintle, which can crack them. ERDC engineers wrote that "there is currently no standardized procedure for setting these quoin gaps," used computer models to find the settings that minimize stress in the anchorage and pintle, and said the results would be checked by physical tests on a fully instrumented gate.

    Achieved whenthe physical test results are published and a Corps engineering manual adopts a gap-setting procedure.

    dpi-proceedings.com

    Claimed by

    Anita H. Brown and Travis B. Fillmore, ERDC Coastal and Hydraulics Laboratory, in the Structural Health Monitoring 2025 proceedings, 2025

Open

  1. 01

    Which lock closes next

    a public table of every lock closure on US Corps locks and German federal waterway locks from 2015 on (lock, dates, planned or not, stated cause), and a model that ranks locks by the unplanned closure hours to expect next year.

    The brief
    Credit · unclaimed
  2. 02

    What divers can see

    a tank test that measures how reliably an underwater camera and an imaging sonar on a small remotely operated vehicle (ROV) find cracks of known size in steel plate like lock gate plating, at set levels of murky water, and publishes detection curves.

    The brief
    Credit · unclaimed

Open 01 · the brief

Which lock closes next

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

a public table of every lock closure on US Corps locks and German federal waterway locks from 2015 on (lock, dates, planned or not, stated cause), and a model that ranks locks by the unplanned closure hours to expect next year.

Why it is still open

The US Government Accountability Office found in 2018 that the Corps lacked an approach for tracking deferred maintenance, as CRS reports. In April 2026 the German government made its lock condition ratings confidential and pointed to closure notices instead. Justin Chimka of the University of Arkansas modeled yearly counts of unscheduled closures at the Corps' key locks from its public lock reports in 2021 and found that coal tonnage and average processing time predicted more of them, but the model explains about half the variation and was not tested on later years. Oni, Madson and MacKenzie (2024) rank maintenance choices for a single lock from experts' estimates, not from closure records. No search found a public forecast of lock closures scored on later years, or one that covers Europe.

everycrsreport.comdserver.bundestag.derosap.ntl.bts.govapi.openalex.org

Built with what exists

LPMS lock unavailability reports, which CISA lists among Corps Locks outputs, or a Freedom of Information Act request; German closure notices published on ELWIS, read with PyMuPDF; a low-cost language model to pull the lock, dates and cause from each notice and quote the sentence it used (see the Note "The jobs agents repeat"); the lifelines library in Python for survival models; ASCE's 2020 count as a cross-check.

cisa.gov

  1. First step

    request the 2020 unavailability records for all Corps locks and compare their count with ASCE's 9,147.

  2. Done looks like

    closures from 2015 to 2025 for at least 100 US and 50 German locks; the US total for 2020 within 5 percent of ASCE's 9,147; a model trained on data through 2022 whose top 20 locks for 2023 to 2025 account for more unplanned closure hours than the top 20 ranked by age alone, with both scores published.

Open 02 · the brief

What divers can see

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

a tank test that measures how reliably an underwater camera and an imaging sonar on a small remotely operated vehicle (ROV) find cracks of known size in steel plate like lock gate plating, at set levels of murky water, and publishes detection curves.

Why it is still open

Gate cracks are found under water by divers, as at Wilson Lock in 2024, or when a chamber is drained so that parts normally under water can be seen. Searches found ROV crack-detection research (for example Kala, Viel and Bergantin, ICRA 2026) and a Ship Structure Committee study of detection rates for visual inspection of ships, but no published detection rate by crack length and water clarity for lock-gate steel.

waterwaysjournal.netbad-abbach.deapi.crossref.org

Built with what exists

a BlueROV2 from Blue Robotics with its low-light camera and a Ping360 scanning sonar; steel plates with slots and fatigue cracks cut by a fabrication shop; kaolin clay to cloud the water, measured with a turbidity meter in NTU; a pool or test tank; a YOLO image detector as one reader and two people as others, all blind to the crack layout.

  1. First step

    have a shop cut 20 slots from 5 to 150 mm in two steel plates and film them with the ROV camera in clear water.

  2. Done looks like

    60 cracks from 5 to 150 mm long, viewed at three water clarities (about 5, 20 and 50 NTU) by camera, by sonar and by the two people; the crack length found 90 percent of the time published for each method and clarity, with all images and the layout key.