Locks and dams
A lock is a chamber with gates at each end that raises or lowers boats between two water levels, and a navigation dam holds a river back into a chain of deep pools; this work is building, funding and running them.
7
Milestones achieved, from 984 to 2018.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
984
Two gates make a lock
A pound lock is a short chamber closed by a gate at each end; letting water in or out lifts or lowers a boat from one level to the next. Gale's reference work Science and Its Times says the Chinese engineer Qiao Weiyue (spelled there Ch'iao Wei-Yo) built "the world's first canal lock" in 984, on the canal linking the Yangtze and Yellow rivers, and that the invention "gained little use there" but spread in Europe, where it first appeared in 1396.
Credit
Qiao Weiyue
1694
A canal over the hills
UNESCO says the Canal du Midi in southern France, built between 1667 and 1694, links the Mediterranean and the Atlantic through 360 km of waterways and 328 structures such as locks, aqueducts and tunnels. It calls it "the first major summit level canal": its locks climb to a high point, where water from the Montagne Noire hills, held back by the Saint-Ferréol dam, keeps the top reach full.
Credit
Pierre-Paul Riquet, its designer and builder
1930
A stairway of pools
On the upper Mississippi, Congress authorized a 9-foot channel in 1928, and in 1930 a system of locks and dams to make it, later enlarged in steps up to 1958, according to the US Army Corps of Engineers. The dams are rows of concrete piers with movable gates between them that hold the river in deep "slack-water" pools during low and medium flows, and the locks pass boats from pool to pool "like a stairway of water."
LessonLocks built for the 1930s are short for today's tows; at Lock and Dam 25 a typical 15-barge tow is split and locked through in two passes that take over two hours, against 30 to 45 minutes in one pass through a planned 1,200-foot chamber, by Marine Log's account.
Credit
the US Congress and the US Army Corps of Engineers
1978
Barge owners start paying
Until the late 1970s the US federal government paid the whole cost of building inland waterways. The Inland Waterways Revenue Act of 1978 put a tax on fuel burned by commercial barges, and the Water Resources Development Act of 1986 made waterway users pay half the cost of new locks and major lock rebuilds through the Inland Waterways Trust Fund, while running and maintaining the waterways stayed fully federal, according to the Congressional Research Service (CRS). In 2014 Congress raised the tax from 20 to 29 cents a gallon.
LessonA tax fixed in cents loses value to inflation; CRS calculated in 2013 that if the 1994 rate had been tied to consumer prices, it would have raised about $300 million more by then.
Credit
the US Congress
1992
The Rhine meets the Danube
The Main-Danube Canal opened on 25 September 1992. It runs 171 km from Bamberg on the Main to Kelheim on the Danube and climbs over the divide with 16 locks, and it completed a waterway of about 3,500 km from the North Sea to the Black Sea, according to the Austrian encyclopedia AEIOU.
LessonAn earlier canal on a similar line, King Ludwig I's Ludwig Canal, had 100 locks and a narrow channel; it was hard to navigate and was abandoned in 1945 after war damage.
Credit
Rhein-Main-Donau AG, the company founded in 1921 to build it
2016
A lift for 3,000-ton ships
At the Three Gorges Dam on the Yangtze, ships pass the dam through a staircase of locks or, since trial operation began on 18 September 2016, a ship lift: a water-filled chamber 120 m long and 18 m wide with 3.5 m of water, raised up to 113 m with a ship of up to 3,000 t inside. Maritime Executive reported in November 2016 that the lift takes less than an hour each way, against about four hours through the locks.
Credit
China Three Gorges Corporation, owner and operator; designed with a joint venture of Krebs+Kiefer International and Lahmeyer International
2018
Olmsted opens, years late
Olmsted Locks and Dam on the lower Ohio River, with two chambers 1,200 feet long and 110 feet wide, replaced Locks and Dams 52 and 53, built in 1929; its ribbon cutting was on 30 August 2018. Congress authorized it in 1988 at $775 million, to open in 2006; in 2012 the Corps asked to raise the limit to $2.918 billion. The US Government Accountability Office (GAO) found the main causes were a low first estimate, an "in-the-wet" method of building the dam from precast concrete shells of 2,600 to 3,700 tons set in the river, and a cost-reimbursement contract used after no firm bid a fixed price.
LessonThe new method was chosen to cost less and finish sooner, but its estimate did not account for the river conditions that slowed the work, by GAO's finding.
Credit
US Army Corps of Engineers, Louisville District
Watch for
A canal claims lock records
China's Pinglu Canal, 134.2 km from Nanning to the Beibu Gulf, opened to navigation on 16 September 2026 for ships of up to 5,000 t, with three lock complexes at Madao, Qishi and Qingnian. The release claims four world records, among them "the fastest lock operation speed for ship locks of its kind" and "the highest water head of a water-saving ship lock globally".
Achieved whenlock cycle times, water use per lockage and traffic for its first year are measured and published by someone outside the project.
Claimed by
Guangxi International Communication Center, in a Media OutReach release, September 2026
Open
01
Forecast waits at each lock
a public page that forecasts how long a tow will wait at each of the busiest US locks 6, 24 and 48 hours ahead, with a range, from public data, and that scores its own past forecasts every day.
The briefCredit · unclaimed02
Replay a chain of locks
an open simulator that replays recorded days on a chain of five consecutive Upper Mississippi locks and compares the first-come rule with one schedule for the whole chain that tells each tow when to arrive and how fast to go, reporting waiting hours and fuel.
The briefCredit · unclaimed
Open 01 · the brief
Forecast waits at each lock
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
a public page that forecasts how long a tow will wait at each of the busiest US locks 6, 24 and 48 hours ahead, with a range, from public data, and that scores its own past forecasts every day.
Why it is still open
The Corps of Engineers' lock data system (the Lock Performance Monitoring System, LPMS) publishes queue reports, lock status, closure reports and delays through its Corps Locks website, by the description of the US Cybersecurity and Infrastructure Security Agency, but no forecast of waits. Under federal rules the tow that arrives first normally locks through first, so a pilot learns the wait only on arrival. Researchers have modeled waits before: a 2011 Texas Transportation Institute study by Ximing Wu, Meng-Shiuh Chang, Steven Fuller and Yu Yvette Zhang fitted delay and lockage times at Upper Mississippi and Illinois locks and showed how to predict them for a given tow, and Golak, Defryn and Grigoriev (2022) optimized tow speeds on Dutch ship-tracking data. The University of Arkansas's TransMAP hub collects the Corps Locks reports at better than yearly resolution. No search found a public, running wait forecast for US locks that is scored against what happened.
cisa.govlaw.cornell.edurosap.ntl.bts.govapi.semanticscholar.orgcastuofa.github.io
Built with what exists
LPMS queue and traffic reports (through Corps Locks or a Freedom of Information Act request); US Geological Survey river gauges and National Weather Service river forecasts; ship-tracking (AIS) positions of tows approaching each lock; Python with LightGBM quantile models.
First step
obtain one year of queue records for Lock 27 and compute the error of the "same as now" forecast, the number to beat.
Done looks like
a back-test over all of 2025 at the seven high-traffic locks that CRS charts (Mississippi Locks 25, 26 and 27; Peoria and LaGrange on the Illinois Waterway; Smithland and Newburgh on the Ohio) in which the 24-hour forecast's mean absolute error is at least 30 percent lower than a "same as now" forecast; then 90 days of live forecasts, published before the fact and scored after.
Open 02 · the brief
Replay a chain of locks
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
an open simulator that replays recorded days on a chain of five consecutive Upper Mississippi locks and compares the first-come rule with one schedule for the whole chain that tells each tow when to arrive and how fast to go, reporting waiting hours and fuel.
Why it is still open
First-come is the rule. Researchers have optimized tow speeds between locks on Dutch AIS data (Golak, Defryn and Grigoriev, 2022) and simulated decision rules for Upper Mississippi locks (Smith, Sweeney and Campbell, 2007), but no search found an open replay of recorded US days with code and data that others can rerun.
Built with what exists
LPMS lockage records; AIS tracks from the US government's MarineCadastre archive; Python with SimPy for the simulation and Google OR-Tools for the schedule; published towboat fuel curves. Anthropic Fellows simulations found one agent serving a whole group used a shared resource better than one agent per person, a design question that applies to tows sharing a lock (see the Note "Many agents, one budget").
First step
build a first-come replay of one week at Lock and Dam 25 and check its waits against the recorded ones.
Done looks like
30 recorded days replayed; the simulated first-come totals match recorded waiting hours within 10 percent; the chain schedule's waiting hours and fuel are published beside them with code and data; two working towboat pilots review five of its schedules and say whether each could be run.