Removing equipment is taking away what a well leaves behind once it is plugged: the casing and conductor cut off below the ground or seabed, the wellhead, the platform above it, and on land the pumps, tanks and buried flowlines.

5

Milestones achieved, from 1986 to 2017.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1986

    Blasts and dead turtles

    Platform legs and well conductors are often cut about 5 m below the seabed with explosives. Between 19 March and 19 April 1986, while explosives were used to remove ten structures off the upper Texas coast, 51 dead sea turtles, mostly endangered Kemp's ridleys, washed up there. From 1987 a company that wanted to use explosives in the Gulf of Mexico needed a permit that required observers approved by the National Marine Fisheries Service (NMFS), detonation only in daylight, and staggered charges. The observer program still runs, but its records are closed to the public.

    Lessonthe evidence linking the blasts to the deaths was circumstantial, and it was enough to put wildlife rules on every blast.

    spo.nmfs.noaa.govfisheries.noaa.gov

    Credit

    Edward Klima, Gregg Gitschlag and Maurice Renaud, NMFS Galveston Laboratory; Minerals Management Service

  2. 2010

    Deadlines for idle iron

    Idle iron is the trade's name for wells and platforms left standing after they stop being used. A 2008 internal review had found many idle platforms and unplugged wells in the Gulf of Mexico that a hurricane could damage. In September 2010 the US offshore regulator told operators in a formal notice that a well unused for five years must be plugged within three years, and an idle platform removed within five. In 2024 the Government Accountability Office reported that of about 1,600 platforms and 8,000 wells in the Gulf, more than 500 platforms and 2,700 wells were overdue for decommissioning.

    Lessona deadline without enforcement did not clear the backlog.

    bsee.goveverycrsreport.com

    Credit

    Bureau of Ocean Energy Management, Regulation and Enforcement (now BSEE); Government Accountability Office (audit)

  3. 2013

    Wells closed from a ship

    In the shallow southern North Sea many wells drilled from jack-up rigs end at a wellhead on the seabed, known as a mudline well. In April 2013 Offshore Installation Services, part of the Acteon group, reported its 16th campaign closing such wells without a rig. From a chartered anchor-handling supply ship it set cement plugs across all the casing annuli (the rings between casing strings) through the ship's moon pool, then cut the wells below the seabed with an abrasive cutting tool and recovered the wellheads. This campaign closed nine wells for several operators, four for GDF SUEZ E&P UK and two for RWE Dea, after the UK energy department asked operators to fully abandon suspended wells.

    offshoresource.com

    Credit

    Offshore Installation Services and Claxton Engineering (Acteon); GDF SUEZ E&P UK; RWE Dea

  4. 2017

    A forgotten line explodes

    On 17 April 2017 a house in Firestone, Colorado, exploded, killing a resident and a plumber who were replacing a water heater in the basement. Gas from a well about 170 feet away had travelled along a 1-inch plastic flowline, the pipe that carried the well's output, which had been cut, most likely during the house's construction in 2015, and never sealed, the National Transportation Safety Board found. A 1999 company record said the old lines had been abandoned; the state's records showed that was wrong. On 2 May 2017 Colorado's regulator ordered operators to inspect every flowline within 1,000 feet of a building and to properly abandon any line not in use, and new flowline rules followed in March 2018.

    Lessona buried line counts as removed only when it is cut below ground and sealed, and the record of it is checked.

    ntsb.gov

    Credit

    National Transportation Safety Board (investigation); Colorado Oil and Gas Conservation Commission (rules)

  5. 2017

    A platform lifted whole

    On 28 April 2017 the ship Pioneering Spirit lifted the 24,000-tonne topsides of Shell's Brent Delta platform off its legs in the North Sea in one piece, a world lifting record, and carried them to Able UK's yard at Teesside for recycling and disposal. Its bow has a slot and eight sets of motion-compensated lifting beams that straddle a platform; topsides had usually been taken apart piece by piece. By August 2026 the same ship had also lifted the more than 17,000-tonne topsides of TAQA's North Cormorant platform in one piece and delivered them to Shetland.

    gcaptain.comoffshore-mag.com

    Credit

    Allseas; Shell

Watch for

  1. Lasers in place of milling

    Foro Energy built a high-power laser tool, funded by the US energy research agency ARPA-E, to cut away casing when a well is plugged. In November 2020 the Department of Energy cleared a test of it inside an abandoned well, and the project said the tool could save 30 to 50% of the time by doing away with mechanical milling. In February 2026 BiSN, a maker of bismuth plugs, bought Foro and said Foro had over 12,000 successful deployments of its lasers, without saying how many were in well abandonment.

    Achieved whenan operator or ARPA-E publishes results of laser cuts made during real abandonments, with the time per cut set against milling.

    energy.govbisn.com

    Claimed by

    Foro Energy and ARPA-E, November 2020; BiSN, February 2026

Open

  1. 01

    Trace Colorado's unknown flowlines

    A public table and map that follows up Colorado's 2017 flowline inventory: for each segment whose status was unknown or that was scheduled for abandonment, what later public records show (abandoned and reported, still active, or no later record), the status of the well it served, and its distance from the nearest building.

    The brief
    Credit · unclaimed
  2. 02

    Promised against delivered

    A public table that sets each UK offshore decommissioning programme beside its close-out report: what the operator promised to remove, cut or leave in place, and what it reports doing. It records how piles, casings and conductors were cut and how deep below the seabed, the tonnes brought ashore and the shares reused, recycled and sent to landfill, what was left on the seabed (footings, buried pipelines, rock), and how the seabed was shown to be clear (overtrawl, survey or remotely operated vehicle), by whom and when.

    The brief
    Credit · unclaimed

Open 01 · the brief

Trace Colorado's unknown flowlines

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table and map that follows up Colorado's 2017 flowline inventory: for each segment whose status was unknown or that was scheduled for abandonment, what later public records show (abandoned and reported, still active, or no later record), the status of the well it served, and its distance from the nearest building.

Why it is still open

After the Firestone explosion the regulator's staff found 120,815 flowline segments within 1,000 feet of a building; operators showed that 107,297 had passed a pressure test or been abandoned and that 428 had failed, and the status of 13,090 was still being worked out, with staff noting incomplete data and many duplicate reports in the raw file. The inventory the regulator still offers for download was last updated on 15 August 2017; of its 128,826 rows, 7,987 mark the line's start as scheduled for abandonment and 83 mark the line as abandoned, by this session's count. No later public analysis of the inventory was found in this session's web and GitHub searches.

pritzkerlaw.comecmc.colorado.gov

Built with what exists

The 2017 inventory spreadsheet and the 2018 database in the same download; the regulator's public well and facility records (COGIS) for well status and plugging dates; an open building footprint layer; Python with pandas and GeoPandas; QGIS.

  1. First step

    Load the 2017 spreadsheet, remove duplicate reports as the 2017 staff memo describes, and count the unique segments in each status.

  2. Done looks like

    Duplicates removed and counted; every unknown or scheduled segment given a later status with the record behind it; a second person rechecking 100 random rows and agreeing on at least 95; table, map and code published and sent to the regulator.

Open 02 · the brief

Promised against delivered

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table that sets each UK offshore decommissioning programme beside its close-out report: what the operator promised to remove, cut or leave in place, and what it reports doing. It records how piles, casings and conductors were cut and how deep below the seabed, the tonnes brought ashore and the shares reused, recycled and sent to landfill, what was left on the seabed (footings, buried pipelines, rock), and how the seabed was shown to be clear (overtrawl, survey or remotely operated vehicle), by whom and when.

Why it is still open

The UK regulator for offshore decommissioning, OPRED, reviews each operator's seabed clearance evidence when its close-out report arrives. Its page links about 50 close-out reports, by a count made for this page in November 2026, each a separate document, with no combined table. A close-out report holds the facts needed: Guinevere's report, for example, says its piles were cut 3 m below the mudline as planned and its well casings and conductor were cut with an abrasive water jet. Crossref searches in this session found no study comparing programmes with close-out reports.

assets.publishing.service.gov.ukgov.ukassets.publishing.service.gov.uk

Built with what exists

OPRED's published programmes and close-out reports; OSPAR's inventory of offshore installations for locations; a vision-language model to read their tables, quoting the page for each value (see the Note "Findings that cite notes"); open-weight models for local runs (see the Note "A trillion open parameters"); two human checkers; Python.

  1. First step

    Code five close-out reports, such as Guinevere's and Kittiwake's, and their programmes by hand to settle the fields.

  2. Done looks like

    Every close-out report on the page coded against its programme, each value linked to a page; a second person agreeing on at least 95% of 200 sampled values; counts published of promises met, changed and missed.