Industries / Industrial equipment and services / Industrial services
Turnaround management
Turnaround management is the work of deciding, planning and running the planned shutdowns in which a refinery, chemical plant or similar site stops a unit for weeks so that equipment that cannot be reached while it runs can be inspected, cleaned and repaired, and then started up again.
1959
DuPont planned the maintenance shutdowns at its Louisville Works with the new critical path method, a way of finding the chain of jobs that sets how long the work takes, and cut the average shutdown from 125 hours to 93.
16
Milestones achieved across 4 domains.
2
To watch for: announced, not yet confirmed outside.
4
Open deliverables. Nobody has shipped them.
In one minute
Where it started
A process plant runs day and night for years, and some of its equipment can only be opened when it stops. In 1959 DuPont showed that a shutdown could be planned like a project, job by job, and made shorter. By 1999 the method had its own textbook, Tom Lenahan's Turnaround Management, built on his years at ICI.
Where it stands
Most refineries stop each unit every three to five years, by the industry body AFPM's count, and a large turnaround can take more than a million hours of work. A site's headcount can rise from about 300 to more than 2,000 overnight, mostly contractors, writes Frederic Baudart of Fluke. The benchmarking firm AP-Networks reported in 2016 that more than two-thirds of turnarounds in its database ran over plan by 10% or tripped after startup. Many of the trade's rules were written after deaths during shutdowns and restarts, from Texas City in 2005 to Deer Park in 2024.
What is open
Turnaround data is held by the plants and the benchmarking firms, so outsiders cannot check claims of shorter, cheaper shutdowns. Small teams could build a public record of turnaround outcomes from company filings, test a phone-camera check that the right flange is being opened on a mock-up, and build a tool that checks a startup procedure against the list of changes made during the shutdown.
Domains
AchievedWatch forOpen
Domain
Progress
Last achieved
Watch for
Open
Deciding the scope
Deciding the scope means choosing which jobs go into a turnaround, which can be done while the unit runs, and how long the unit can run before the next one.
4 · 1 · 1
Last achievedScope growth measured2016
Watch forOpen code for risk ranking
1
openPlanning and scheduling
Planning turns the work list into job packages, with crafts, hours, scaffolds, cranes, parts and permits. Scheduling fits them into the shortest safe shutdown.
4 · 1 · 1
Last achievedTwo in three miss2016
Watch forShort turnarounds and AI planners
1
openContractors and the site
During a turnaround most of the work is done by contract crews brought in for weeks, with their own trailers, tools and supervisors, beside units that are still running.
4 · 0 · 1
Last achievedA turnaround crew on a live unit2024
1
openStartup
Startup brings the unit back from cold, empty and open to full running, after a check that the work is finished, blinds are out and the people not needed have left.
4 · 0 · 1
Last achievedToo many people at a restart2010
1
open
Open in turnaround management
3 of 4 open deliverables
Open · Deciding the scope
Run or wait, a casebook
A public casebook of at least 200 maintenance jobs taken from published accident reports, each coded for whether it was done on a running unit or in a shutdown, whether the equipment could be isolated and drained, and what happened. Then a written set of rules, and an AI model that applies them, that flags jobs which should wait for a shutdown.
Built with what exists
CSB reports and the French accident database ARIA, both public; a spreadsheet; an AI model that reads long documents (see the Note "Seven more flagged").
Open · Planning and scheduling
A public turnaround record
A public table of refinery and chemical plant turnarounds, each with the planned start and length as announced and the actual dates as later reported, and with every figure linked to the filing, press release or trade report it came from.
Built with what exists
SEC EDGAR full-text search; company news releases and earnings call transcripts; Python; an AI model that reads long documents and pulls out dates (see the Note "Seven more flagged").
Open · Contractors and the site
Check the flange before opening
A phone app that confirms a worker is standing at the flange named on the permit before it is opened. It reads a tag or marker on the flange, compares the camera view with photos taken when the blind or isolation was planned, and gives a clear yes or no. Tested on a mock-up pipe rack with no process fluid, never on live plant.
Built with what exists
A smartphone; printed AprilTag or QR markers; an open image-matching or object-recognition model; the permit as a spreadsheet row.
Where it sits
Broader
In outline