Turnarounds

A turnaround is a planned shutdown of a process unit, often for weeks, in which thousands of jobs that cannot be done while it runs are done at once, mostly by contractors.

4

Milestones achieved, from 1959 to 2007.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

In depth

The same ground is charted in more depth, as an industry of its own.

The road

AchievedWatch forOpen

Achieved

  1. 1959

    Scheduling the shutdown by computer

    DuPont tested the critical path method, a way of finding the chain of jobs that sets how long a project takes, on plant shutdowns at its Louisville Works. The plant made a neoprene ingredient that could detonate, so almost all maintenance had to wait for shutdowns. By March 1959 the method had cut the average shutdown from 125 hours to 93, and the authors expected 78 with faster work on critical jobs. They found that most shutdown jobs recur every time and that only about 10% of them are critical, and Louisville made the method a regular part of its maintenance planning.

    mosaicprojects.com.au

    Credit

    James E. Kelley Jr. and Morgan R. Walker, for DuPont and Remington Rand

  2. 2005

    Contractors in the blast zone

    On 23 March 2005 BP's Texas City refinery was restarting part of its isomerization unit after a month-long turnaround, while about 800 contractor workers were on site for turnaround work. A tower overfilled, the release ignited, and 15 people were killed and 180 injured. All 15 dead were contract workers in or near temporary trailers that BP had placed as close as 121 feet (37 m) from the blowdown drum. The US Chemical Safety Board (CSB) asked the American Petroleum Institute to write guidelines for keeping occupied trailers away from process hazards.

    LessonTemporary offices for turnaround crews belong outside the reach of an explosion.

    csb.gov

    Credit

    investigated by the CSB, final report 2007

  3. 2005

    A permit marked N/A

    During a fall 2005 turnaround at Valero's Delaware City refinery, two contract workers died on 5 November when they entered a hydrocracker reactor that was being purged with nitrogen to protect new catalyst. One went in to retrieve a roll of duct tape and the other followed to rescue him. The safe work permit had marked the nitrogen purge "N/A", and the warning sign and barricade required by refinery procedures were not in place.

    LessonNitrogen gives no warning, so its hazard must be marked on the permit and at the opening.

    csb.gov

    Credit

    investigated by the CSB, case study 2006

  4. 2007

    A replacement put off

    During Chevron's 2007 turnaround at its Richmond, California refinery, the crude unit inspector recommended replacing a whole line with a more resistant chromium steel, because one component had lost a third of its wall thickness by 2002. The turnaround planning team did not accept the recommendation, judging from limited data that the pipe would last until the 2011 turnaround, and the thinned component was not reinspected. It ruptured on 6 August 2012.

    LessonWhat a turnaround leaves out of its scope can matter as much as what it includes.

    csb.gov

    Credit

    investigated by the CSB, interim report 2013

Watch for

  1. AI and robots on turnaround

    GS Caltex says its first-half 2026 turnaround at the Yeosu refinery in South Korea, covering nine units over about 60 days with about 3,000 workers a day and a budget of about 200 billion won, used an app that maps motor-operated valves, a robot that cleans heater tubes, and AI-equipped cameras that watch for missing protective gear, unclipped safety hooks and approaching heavy machines.

    Achieved whenGS Caltex or an outside party publishes measured results against earlier turnarounds, such as hours worked, schedule, injuries or near misses.

    view.asiae.co.kr

    Claimed by

    GS Caltex, July 2026

Open

  1. 01

    Tighten a flange by robot

    A robot that tightens the bolts of a pipe flange in the staged star pattern specified by ASME, raising the load in steps, on a test flange, and records the load in every bolt.

    The brief
    Credit · unclaimed
  2. 02

    A public turnaround to schedule

    An open test case of a realistic turnaround: about 2,000 jobs for one process unit, with crafts, durations, scaffolds, cranes, permits, and jobs that appear only after equipment is opened, plus baseline schedules from an open solver and from an AI agent.

    The brief
    Credit · unclaimed

Open 01 · the brief

Tighten a flange by robot

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A robot that tightens the bolts of a pipe flange in the staged star pattern specified by ASME, raising the load in steps, on a test flange, and records the load in every bolt.

Why it is still open

The work is done by a person with a handheld hydraulic tightening tool and can take several hours a flange; a 2019 student team at the University of Central Florida, sponsored by Siemens, built only a scaled prototype. A search found no robot doing it in a plant.

ece.ucf.edu

Built with what exists

A collaborative robot arm or a carriage that runs around the flange; an electric torque tool with a digital readout; an ultrasonic bolt-load gauge; open robot models such as NVIDIA's GR00T 2 (Notes: "Five demonstrations per task") trained with Hugging Face's LeRobot (Notes: "No download").

  1. First step

    Buy a used 6-inch flange pair with bolts and film a technician tightening it three times, measuring the bolt loads each time.

  2. Done looks like

    Twenty assemblies of a 6-inch test flange, with every bolt load measured by ultrasound and within 10% of target, and time per joint compared with two qualified bolting technicians on the same flange.

Open 02 · the brief

A public turnaround to schedule

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open test case of a realistic turnaround: about 2,000 jobs for one process unit, with crafts, durations, scaffolds, cranes, permits, and jobs that appear only after equipment is opened, plus baseline schedules from an open solver and from an AI agent.

Why it is still open

Turnaround plans are kept by the plants that make them. A 2025 paper that released the first open benchmark for refinery production planning said existing benchmarks lacked practical context or used oversimplified assumptions; its benchmark covers production planning, not turnarounds, and a search found no public turnaround case.

arxiv.org

Built with what exists

Google's OR-Tools solver; Kelley and Walker's finding that most shutdown jobs recur every time, to shape the job list; a coding agent that checks its own work, such as Thinking Machines' Inkling 2 Small (Notes: "Checked without being asked").

  1. First step

    Write the full job list for one heat exchanger and one distillation column, and ask two planners to correct it.

  2. Done looks like

    The test case published under an open license, rated realistic by two experienced turnaround planners, with baseline schedule lengths, and at least one outside team submitting a result.