Solar

Solar plants turn sunlight into electricity, mostly with photovoltaic panels and sometimes with mirrors that heat a fluid to drive a turbine.

4

Milestones achieved, from 1954 to 2026.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

In depth

The same ground is charted in more depth, as an industry of its own.

The road

AchievedWatch forOpen

Achieved

  1. 1954

    A practical solar cell

    On 25 April 1954 Bell Labs showed a silicon solar cell that turned about 6% of the sunlight falling on it into electricity, running a 21-inch Ferris wheel on sunlight alone. IEEE calls it "the first practical photovoltaic solar cell."

    ethw.org

    Credit

    Daryl Chapin, Calvin Fuller and Gerald Pearson, Bell Telephone Laboratories

  2. 2019

    A salt-storage tower fails

    Crescent Dunes near Tonopah, Nevada, a 110 MW plant that used mirrors to heat molten salt and could keep making power for up to 10 hours after dark, began commercial operation in 2015 with a $737 million federal loan guarantee. A salt tank leak in October 2016 shut it for about eight months. After more outages, NV Energy ended its power contract in October 2019 and the operator filed for bankruptcy in July 2020. Its power cost about $135 per MWh, against about $30 for a Nevada photovoltaic plant, according to the Journal of Petroleum Technology.

    Lessona plant can be overtaken by a cheaper technology before it starts running.

    jpt.spe.org

    Credit

    Tonopah Solar Energy (operator); US Department of Energy (loan guarantee)

  3. 2024

    Solar costs fall 90%

    IRENA puts the global average levelized cost of electricity from new utility-scale solar (a plant's lifetime cost divided by the energy it makes) at USD 0.043 per kWh in 2024, down from USD 0.417 in 2010, and 41% below the cheapest fossil-fuel alternative. Installed cost fell 87% over the same years to USD 691 per kW. Costs were lowest in China, at USD 0.033 per kWh, and rose in the United States and the European Union.

    irena.org

    Credit

    IRENA (figures); solar makers and builders worldwide

  4. 2026

    Two-layer cell record

    LONGi reports a 35.5% efficient tandem cell, a thin perovskite layer on top of a silicon cell so that each layer uses a different part of the sunlight, certified in July 2026 by ESTI, the European Commission's solar test lab. Its previous record, 34.85% in April 2025, was certified by NREL. LONGi did not disclose the cell's area and says it has no mass-production plan.

    pv-magazine.com

    Credit

    LONGi; ESTI, European Commission Joint Research Centre (certification)

Watch for

  1. Robots install 100 MW

    Maximo, a robotics company started inside the power company AES, says a fleet of four of its robots helped install 100 MW of panels at AES's Bellefield project in Kern County, California. It reports more than one panel a minute per robot and up to 24 panels per worker per shift hour, which it calls nearly double traditional methods in the region. It gives no baseline data, and no outside party measured the work.

    Achieved whenan outside party publishes measured installation rates against a documented manual baseline.

    solarpowerworldonline.com

    Claimed by

    Maximo, March 2026

Open

  1. 01

    Robot swaps a broken panel

    A robot that unclamps a cracked panel from a solar tracker (the motorized rack that tilts panels to follow the sun) and fits a new one, tested on an unpowered test rig, never on a live plant.

    The brief
    Credit · unclaimed
  2. 02

    Time the human baseline

    A public time-and-motion record (a timing of each step of a job) of crews installing panels by hand at utility-scale plants, so that robot makers' speed claims can be checked against something.

    The brief
    Credit · unclaimed

Open 01 · the brief

Robot swaps a broken panel

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A robot that unclamps a cracked panel from a solar tracker (the motorized rack that tilts panels to follow the sun) and fits a new one, tested on an unpowered test rig, never on a live plant.

Why it is still open

Robots now install new panels and inspect working plants. GameChange Solar and Raptor Maps, for example, pair tracker software with Raptor Maps' Sentry robot, which finds faults such as overheating connectors so that workers can take corrective action. A search found no robot that replaces a damaged panel.

pv-magazine-usa.com

Built with what exists

A collaborative robot arm rated for a panel's weight, on a wheeled base; suction grippers; cameras; an open robot model trained from human demonstrations (see the Note "Five demonstrations per task" and the Note "Open robot model weights"); LeRobot tools for recording and training (see the Note "No download"); a short section of tracker; panels not connected to anything.

  1. First step

    Build a one-table rig with two used panels and time a two-person crew doing ten swaps.

  2. Done looks like

    20 filmed swap attempts on the rig, with a published tally of successes, the minutes each took, and the minutes two people take for the same job.

Open 02 · the brief

Time the human baseline

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public time-and-motion record (a timing of each step of a job) of crews installing panels by hand at utility-scale plants, so that robot makers' speed claims can be checked against something.

Why it is still open

Maximo's claim of nearly double "traditional methods" comes with no baseline data or method. NREL's published time-and-motion study of solar installation covers 21 home rooftops in California, not utility-scale plants.

solarpowerworldonline.compv-magazine-usa.com

Built with what exists

Fixed or helmet cameras, used with the consent of crews and site owners and within site safety rules; video models or pose-estimation software to mark when each step starts and ends; NREL's time-and-motion forms, adapted; a sampling plan.

  1. First step

    Get one installer's permission to film one crew for one shift, and time 200 panels by hand.

  2. Done looks like

    Timed records for at least 10,000 panels across at least five sites and two tracker types, with minutes per panel per worker and the spread published.