Industries / Energy, water and waste / Power generation
Storage
Grid storage holds electricity for later, by pumping water uphill, squeezing air into underground caverns, or charging large banks of batteries.
6
Milestones achieved, from 1929 to 2025.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
1929
Water pumped uphill
At the Rocky River plant in Connecticut, pumps raised water into Lake Candlewood when power was cheap, and at peak demand the water flowed back down the same pipe while the pump motors ran as generators. ASME says the Connecticut Light & Power Company "pioneered the use of pumped storage in the United States" there.
Credit
Connecticut Light & Power Company
1978
Air stored in salt
At Huntorf in West Germany, a 290 MW plant compresses air into caverns leached out of a salt dome and later releases it through a gas turbine to make power at peak times. Construction began in August 1974, with commercial operation expected by September 1978, according to a 1978 paper by its engineers, which calls it the world's first plant of its kind.
Credit
Nordwestdeutsche Kraftwerke AG; H. C. Herbst and Z. S. Stys
2017
A big battery responds fast
The 100 MW, 129 MWh Hornsdale Power Reserve in South Australia, built with Tesla batteries, switched on on 1 December 2017. The market operator AEMO reported that it was the first technology other than conventional generators to provide regulation frequency services (constant small adjustments that keep the grid at 50 Hz) in Australia's main market, and that it responds "more rapidly to a contingency event than conventional synchronous generation."
Credit
Tesla (batteries); AEMO (assessment)
2019
Korea's battery fires
South Korea built more than 1,000 battery storage sites in 2017 and 2018, and 27 of its 55 recorded battery failures happened in 2018 and 2019. A government-industry taskforce investigated, and its measures, including safety testing of cells, battery-management systems and inverters, mandatory electrical protection, and safety retrofits, were taken up or copied in other countries, according to EPRI.
Lessonbuilding fast without safety testing led to fires that set rules for everyone.
Credit
South Korea's government-industry taskforce; EPRI (record)
2025
Moss Landing burns
A fire in January 2025 burned Vistra's 300 MW battery facility at Moss Landing, California, where older batteries were packed closely in an enclosed, aging building. As of September 2026 Vistra said the cause was still unknown, and that month about 1,200 damaged modules that were still charged and could not be reached caught fire on their own. A state regulator, the CPUC, has a root-cause analysis under way.
Lessonbatteries packed into one building can burn together, and damaged ones stay dangerous for months.
Credit
Vistra (operator); California Public Utilities Commission (investigation)
2025
Fewer fires per battery
EPRI's October 2026 study found that failures per GWh of installed grid batteries fell 98% between 2018 and 2025. In 2025 there were 24 incidents worldwide with 634 GWh deployed, half the 2024 rate. Most of the drop came from better design, codes and battery management between 2018 and 2020. EPRI notes there is no mandatory failure reporting in the US or Europe, so some incidents may be missing.
Credit
EPRI
Watch for
A 100-hour battery
Form Energy's iron-air batteries are designed to deliver their rated power for 100 hours, against about four hours for typical lithium-ion grid batteries. MIT Technology Review reported in October 2026 that Form is making batteries in West Virginia for a 150 MWh system for Great River Energy in Minnesota, set to come online in 2027; the utility's project page had expected operation by the end of 2025. Form's factory makes 2 GWh a year against 80 GWh promised under contracts, and no independent performance data has been published.
Achieved whena year of measured output, duration and efficiency from the Minnesota system is published by the utility or another outside party.
Claimed by
Form Energy and Great River Energy, October 2026
Open
01
Measure real battery efficiency
An open table, for every large battery in Australia's main grid, of its measured round-trip efficiency (the share of the energy put in that comes back out) and its loss of capacity over time, computed from public market data.
The briefCredit · unclaimed02
Fire-safety files in one place
An open table, for every large battery site in one state or country, of what its public permit files say about fire safety: fire-test results, spacing between battery units, fire suppression and emergency plans, with each fact linked to its page.
The briefCredit · unclaimed
Open 01 · the brief
Measure real battery efficiency
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open table, for every large battery in Australia's main grid, of its measured round-trip efficiency (the share of the energy put in that comes back out) and its loss of capacity over time, computed from public market data.
Why it is still open
Few batteries publish measured figures. Transgrid's 50 MW Wallgrove battery reported, under its government grant, that round-trip efficiency at its grid connection fell from 83.2% (December 2021 to June 2022) to 78.2% (January to June 2023). A search found no open, battery-by-battery measurement; the closest is a paid commercial service.
Built with what exists
AEMO's public five-minute dispatch data for each battery; Wallgrove's published figures as a check; Python.
First step
Try to reproduce Wallgrove's 83.2% figure for December 2021 to June 2022 from AEMO data.
Done looks like
Monthly round-trip efficiency for at least 30 batteries over at least two years, with Wallgrove's published values reproduced within one percentage point, and code and tables published.
Open 02 · the brief
Fire-safety files in one place
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
An open table, for every large battery site in one state or country, of what its public permit files say about fire safety: fire-test results, spacing between battery units, fire suppression and emergency plans, with each fact linked to its page.
Why it is still open
EPRI notes there is "no mandatory reporting of failure incidents in the U.S. or Europe." In California, the CPUC did not vote on battery safety standards required by a 2022 law until after the Moss Landing fire. A search found no table drawn from permit files.
Built with what exists
Public permit records from county and state planning portals; a model that reads scanned documents and cites the page for each fact (see the Note "Seven more flagged"); two human checkers.
First step
Pull the public filings for ten approved battery projects in one county and list the fire-safety facts each contains.
Done looks like
At least 50 sites, each fact linked to a page in a public filing, with a second checker agreeing on at least 95% of facts.