BRENNEN

Industries / Energy, water and waste / Power generation

Storage

Grid storage holds electricity for later, by pumping water uphill, squeezing air into underground caverns, or charging large banks of batteries.

6

Milestones achieved, from 1929 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1929

    Water pumped uphill

    At the Rocky River plant in Connecticut, pumps raised water into Lake Candlewood when power was cheap, and at peak demand the water flowed back down the same pipe while the pump motors ran as generators. ASME says the Connecticut Light & Power Company "pioneered the use of pumped storage in the United States" there.

    asme.org

    Credit

    Connecticut Light & Power Company

  2. 1978

    Air stored in salt

    At Huntorf in West Germany, a 290 MW plant compresses air into caverns leached out of a salt dome and later releases it through a gas turbine to make power at peak times. Construction began in August 1974, with commercial operation expected by September 1978, according to a 1978 paper by its engineers, which calls it the world's first plant of its kind.

    osti.gov

    Credit

    Nordwestdeutsche Kraftwerke AG; H. C. Herbst and Z. S. Stys

  3. 2017

    A big battery responds fast

    The 100 MW, 129 MWh Hornsdale Power Reserve in South Australia, built with Tesla batteries, switched on on 1 December 2017. The market operator AEMO reported that it was the first technology other than conventional generators to provide regulation frequency services (constant small adjustments that keep the grid at 50 Hz) in Australia's main market, and that it responds "more rapidly to a contingency event than conventional synchronous generation."

    reneweconomy.com.au

    Credit

    Tesla (batteries); AEMO (assessment)

  4. 2019

    Korea's battery fires

    South Korea built more than 1,000 battery storage sites in 2017 and 2018, and 27 of its 55 recorded battery failures happened in 2018 and 2019. A government-industry taskforce investigated, and its measures, including safety testing of cells, battery-management systems and inverters, mandatory electrical protection, and safety retrofits, were taken up or copied in other countries, according to EPRI.

    Lessonbuilding fast without safety testing led to fires that set rules for everyone.

    restservice.epri.com

    Credit

    South Korea's government-industry taskforce; EPRI (record)

  5. 2025

    Moss Landing burns

    A fire in January 2025 burned Vistra's 300 MW battery facility at Moss Landing, California, where older batteries were packed closely in an enclosed, aging building. As of September 2026 Vistra said the cause was still unknown, and that month about 1,200 damaged modules that were still charged and could not be reached caught fire on their own. A state regulator, the CPUC, has a root-cause analysis under way.

    Lessonbatteries packed into one building can burn together, and damaged ones stay dangerous for months.

    calmatters.org

    Credit

    Vistra (operator); California Public Utilities Commission (investigation)

  6. 2025

    Fewer fires per battery

    EPRI's October 2026 study found that failures per GWh of installed grid batteries fell 98% between 2018 and 2025. In 2025 there were 24 incidents worldwide with 634 GWh deployed, half the 2024 rate. Most of the drop came from better design, codes and battery management between 2018 and 2020. EPRI notes there is no mandatory failure reporting in the US or Europe, so some incidents may be missing.

    restservice.epri.com

    Credit

    EPRI

Watch for

  1. A 100-hour battery

    Form Energy's iron-air batteries are designed to deliver their rated power for 100 hours, against about four hours for typical lithium-ion grid batteries. MIT Technology Review reported in October 2026 that Form is making batteries in West Virginia for a 150 MWh system for Great River Energy in Minnesota, set to come online in 2027; the utility's project page had expected operation by the end of 2025. Form's factory makes 2 GWh a year against 80 GWh promised under contracts, and no independent performance data has been published.

    Achieved whena year of measured output, duration and efficiency from the Minnesota system is published by the utility or another outside party.

    technologyreview.comgreatriverenergy.com

    Claimed by

    Form Energy and Great River Energy, October 2026

Open

  1. 01

    Measure real battery efficiency

    An open table, for every large battery in Australia's main grid, of its measured round-trip efficiency (the share of the energy put in that comes back out) and its loss of capacity over time, computed from public market data.

    The brief
    Credit · unclaimed
  2. 02

    Fire-safety files in one place

    An open table, for every large battery site in one state or country, of what its public permit files say about fire safety: fire-test results, spacing between battery units, fire suppression and emergency plans, with each fact linked to its page.

    The brief
    Credit · unclaimed

Open 01 · the brief

Measure real battery efficiency

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table, for every large battery in Australia's main grid, of its measured round-trip efficiency (the share of the energy put in that comes back out) and its loss of capacity over time, computed from public market data.

Why it is still open

Few batteries publish measured figures. Transgrid's 50 MW Wallgrove battery reported, under its government grant, that round-trip efficiency at its grid connection fell from 83.2% (December 2021 to June 2022) to 78.2% (January to June 2023). A search found no open, battery-by-battery measurement; the closest is a paid commercial service.

arena.gov.au

Built with what exists

AEMO's public five-minute dispatch data for each battery; Wallgrove's published figures as a check; Python.

  1. First step

    Try to reproduce Wallgrove's 83.2% figure for December 2021 to June 2022 from AEMO data.

  2. Done looks like

    Monthly round-trip efficiency for at least 30 batteries over at least two years, with Wallgrove's published values reproduced within one percentage point, and code and tables published.

Open 02 · the brief

Fire-safety files in one place

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table, for every large battery site in one state or country, of what its public permit files say about fire safety: fire-test results, spacing between battery units, fire suppression and emergency plans, with each fact linked to its page.

Why it is still open

EPRI notes there is "no mandatory reporting of failure incidents in the U.S. or Europe." In California, the CPUC did not vote on battery safety standards required by a 2022 law until after the Moss Landing fire. A search found no table drawn from permit files.

restservice.epri.comcalmatters.org

Built with what exists

Public permit records from county and state planning portals; a model that reads scanned documents and cites the page for each fact (see the Note "Seven more flagged"); two human checkers.

  1. First step

    Pull the public filings for ten approved battery projects in one county and list the fire-safety facts each contains.

  2. Done looks like

    At least 50 sites, each fact linked to a page in a public filing, with a second checker agreeing on at least 95% of facts.