Industries / Energy, water and waste / Power generation
Wind
Wind turbines turn the push of the wind on their blades into electricity, on land and at sea.
5
Milestones achieved, from 1887 to 2024.
1
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
In depth
The same ground is charted in more depth, as an industry of its own.
The road
AchievedWatch forOpen
Achieved
1887
A cottage lit by wind
In July 1887 James Blyth finished a cloth-sailed wind turbine in the garden of his home at Marykirk, Scotland. It charged batteries, and in a moderate breeze lit ten bulbs. Scotland's Engineering Hall of Fame calls it "the world's first-known structure for the generation of electricity from wind power," months ahead of Charles Brush's machine in the US.
Credit
James Blyth, Anderson's College, Glasgow
1941
The first megawatt turbine
The Smith-Putnam turbine on Grandpa's Knob, Vermont, was connected to the local grid on 19 October 1941; Guinness World Records lists it as the first megawatt wind turbine. A bearing failed in 1943 and could not be replaced during the war. Weeks after it restarted, on 26 March 1945, a poorly repaired blade broke off and was thrown about 750 feet, and its designer could not raise money for a successor.
Lessonone weak repair on a first-of-a-kind machine can end the program behind it.
Credit
Palmer Cosslett Putnam
1991
Turbines go to sea
DONG Energy, now Ørsted, built Vindeby off Lolland, Denmark, in 1991 to test "whether it was possible to generate green power offshore." Ørsted calls it the world's first offshore wind farm; it was dismantled in 2017.
Credit
DONG Energy (now Ørsted)
2017
Turbines that float
Equinor's 30 MW Hywind Scotland began producing in 2017. Its turbines stand on floating structures anchored to the seabed, which lets wind farms go into water too deep for fixed foundations. Equinor calls it the world's first commercial floating offshore wind farm and reports an average capacity factor (output as a share of the most it could make) of 54% over its first two years, against about 40% for UK offshore wind.
Credit
Equinor
2024
A blade breaks off Nantucket
In July 2024 a blade on a GE Vernova turbine at Vineyard Wind, off Massachusetts, broke apart and scattered thousands of pieces of fiberglass on Nantucket's beaches. GE Vernova blamed a production defect, in this blade and several dozen others, that its manufacturing process failed to catch. As of May 2026 the federal regulator BSEE's investigation had no completion date, and the two companies were in court.
Lessona defect missed at the factory can reach the sea, and the public may wait years for an official cause.
Credit
Vineyard Wind; GE Vernova; BSEE
Watch for
Twenty megawatts at sea
China Three Gorges says a 20 MW turbine with a 300 m rotor has been commissioned and connected to the grid more than 30 km off Fujian province, in water over 40 m deep, the world's first 20 MW offshore turbine to do so. It expects over 80 million kWh a year.
Achieved whena full year of output is published and confirmed by the grid operator or a certifier.
Claimed by
China Three Gorges Corporation, reported by CGTN, February 2026
Open
01
An open blade failure record
A public table of wind turbine blade failures worldwide, built from regulator reports, court filings, company statements and news, recording what failed and why, with each entry linked to its sources.
The briefCredit · unclaimed02
Grade blade erosion by severity
A public set of drone photos of turbine blades with leading-edge erosion (wear on the front edge from rain, hail and dust, which cuts output) graded on a severity scale, and a test of how well current vision-language models grade it.
The briefCredit · unclaimed
Open 01 · the brief
An open blade failure record
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public table of wind turbine blade failures worldwide, built from regulator reports, court filings, company statements and news, recording what failed and why, with each entry linked to its sources.
Why it is still open
Reporting on the US industry in 2022 found that "There is no national database of incidents" and that "Owners don't publicize them." The Vineyard Wind failure shows how long an official cause can take.
Built with what exists
Reports from BSEE and state siting boards; court records; news archives; a language-model agent that drafts each entry and cites the text behind it (see the Note "Findings that cite notes"); a written cause scheme; two human coders.
First step
Code 30 failures reported since 2020 to settle the cause categories.
Done looks like
At least 300 blade failures since 2000, each with a public source, causes coded by two people with their agreement reported, published under an open license.
Open 02 · the brief
Grade blade erosion by severity
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public set of drone photos of turbine blades with leading-edge erosion (wear on the front edge from rain, hail and dust, which cuts output) graded on a severity scale, and a test of how well current vision-language models grade it.
Why it is still open
A 2025 study of a vision-language model for blade inspection tested it on only 30 labeled images "due to the difficulty of acquiring verified blade imagery," and did not grade severity. A search found open blade image sets that label damage types but none that grade erosion severity.
Built with what exists
Drone photos donated by wind farm owners or inspection firms, starting from existing open blade image sets; a written five-step severity scale; current vision-language models; two experienced blade inspectors.
First step
Have two inspectors grade the same 100 images from an open set to test the scale.
Done looks like
3,000 images graded by two inspectors with their agreement reported, published openly, with the best model's agreement with the inspectors set beside the inspectors' agreement with each other.