6
Milestones achieved, from 2013 to 2025.
2
To watch for: announced, not yet confirmed outside.
2
Open deliverables. Nobody has shipped them.
The road
AchievedWatch forOpen
Achieved
2013
A state pays for microgrids
Connecticut's storm law of 2012, Public Act 12-148, passed largely in response to long outages after storms in 2011, set up a state microgrid programme. On 24 July 2013 the governor announced $18 million for nine projects that would keep police and fire stations, shelters, a hospital, grocery stores and fuel stations powered during grid outages; he called it the nation's first statewide microgrid pilot.
Lessongrants did not make projects quick to build; by early 2016 the state legislature's research office counted three of eleven funded projects operating, one dropped, and no applications yet for a third round.
Credit
Connecticut Department of Energy and Environmental Protection; Governor Dannel P. Malloy
2016
Neighbours trade solar credits
In April 2016, on a street in Brooklyn, New York, LO3 Energy and the blockchain firm Consensus Systems started TransActive Grid, a test market among 15 households (two with solar panels, 13 possible buyers) that recorded each sale on a blockchain, a shared ledger that cannot be quietly rewritten. NPR reported that by law the neighbours could not buy or sell actual electricity from each other, so they traded credits for the environmental value of the solar power, while the power itself still came through the utility, Con Edison.
Lessonthe hard part of a neighbourhood grid is the law on who may sell power, not the software that keeps the accounts.
Credit
LO3 Energy (Lawrence Orsini); Consensus Systems
2018
Costs of 80 microgrids
The National Renewable Energy Laboratory (NREL) gathered costs for 80 US microgrids and found average costs per megawatt of generating capacity of $2.1 million for community microgrids, $2.5 million for utility ones, $3.3 million for campuses and $4.1 million for commercial and industrial sites. The controller, the computer system that runs the microgrid, ranged from 0.5% to 21% of total cost, with a median of 7%.
Lessoncosts were reported in many different forms and published only as averages, so later projects cannot be compared row by row.
Credit
Julieta Giraldez, Francisco Flores-Espino (NREL), Sara MacAlpine (Juwi), Peter Asmus (Navigant Research)
2022
Mini-grid power gets cheaper
A mini-grid is a microgrid that serves a village or town with no main grid. The World Bank's energy programme ESMAP counted 21,500 mini-grids serving 48 million people worldwide, and found that the cost per kilowatt-hour of the best solar-hybrid mini-grids fell from $0.55 in 2018 to $0.38 in 2021, while the upfront cost per customer fell from about $2,000 to $700 to $800 by 2021, by the count of AMDA, the African mini-grid developers' association.
Lessonthe remaining gap to $0.20 per kilowatt-hour, ESMAP's 2030 target, depends on customers using power in the daytime, such as for milling and pumping, as much as on cheaper parts.
Credit
ESMAP (Energy Sector Management Assistance Program), World Bank
2024
One microgrid, many properties
A 2018 California law, SB 1339, told the state's utility regulator to make microgrids easier to build. In January 2021 the California Public Utilities Commission (CPUC) created a $200 million Microgrid Incentive Program for communities hit by outages, and on 7 November 2024 it adopted rules for a multi-property microgrid tariff, a set of utility terms under which one microgrid may serve several separate properties and customers.
Credit
California Public Utilities Commission; California Legislature
2025
Outage costs re-surveyed
Lawrence Berkeley National Laboratory's Interruption Cost Estimate (ICE) Calculator turns an outage into dollars, which is how many utilities and regulators justify paying for a microgrid. Version 2.0, released in April 2025, replaced surveys from 1989 to 2012 with new ones of more than 3,000 households and nearly 4,000 businesses at eight utilities; it puts a 24-hour outage at about $55 for a typical household and $12,646 for a typical business, in 2023 dollars. Version 2.2 followed in February 2026 with six more utilities.
Lessonthe surveys stop at 24 hours, so the multi-day outages that microgrids are built for are still valued by guesswork.
Credit
Peter Larsen, Joseph Eto and Kristina LaCommare (Berkeley Lab); Resource Innovations
Watch for
California's grant microgrids
PG&E said on 17 September 2026 that it had chosen six more community microgrids, for $30 million, in the second round of California's Microgrid Incentive Program, on top of $43 million for nine projects chosen in 2025, and that first-round winners had signed grant agreements that pay for engineering, design and development. Each project must be able to run in island mode, cut off from the main grid, for at least 24 hours in a row; one second-round project pairs about 1.5 MW of solar with a 2 MW battery. Lake County's board chair said the grant would let the county "fully vet the environmental and financial feasibility" of its three proposed microgrids.
Achieved whena funded microgrid has been built and has carried its customers through an outage or test in island mode, as reported by the utility or the CPUC.
Claimed by
PG&E, September 2026
Texas pays for backup microgrids
At the close of its 2025 session the Texas Legislature funded the Texas Backup Power Package, $1.8 billion for microgrids at hospitals, nursing homes, water plants, and police and fire stations. Projects may receive up to $500 per kilowatt of generating capacity and must combine solar, batteries and gas or propane generators.
Achieved whenthe state publishes a list of funded microgrids that have been built and are operating.
Claimed by
Texas Legislature, June 2025
Open
01
Microgrid costs from public filings
A public, project-level table of what built microgrids cost: total cost, generating capacity, storage, year, type of site, and the document and page each number comes from. Sources are records anyone can read, such as Connecticut's grant awards, California Microgrid Incentive Program filings, ARENA (Australian Renewable Energy Agency) project reports and US Department of Energy grant reports. Use it to redo NREL's 2018 cost per megawatt by type of site.
The briefCredit · unclaimed02
What NY Prize's studies became
A table of the 83 community microgrid feasibility studies that New York's NY Prize competition paid for in 2015, each with its estimated cost and benefit-cost ratio (estimated benefits divided by costs), plus whether the microgrid was built and running by 2026, with a dated source for that status, and, for those built, the actual cost beside the estimate.
The briefCredit · unclaimed
Open 01 · the brief
Microgrid costs from public filings
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A public, project-level table of what built microgrids cost: total cost, generating capacity, storage, year, type of site, and the document and page each number comes from. Sources are records anyone can read, such as Connecticut's grant awards, California Microgrid Incentive Program filings, ARENA (Australian Renewable Energy Agency) project reports and US Department of Energy grant reports. Use it to redo NREL's 2018 cost per megawatt by type of site.
Why it is still open
NREL's 2018 study surveyed 80 microgrids but published only averages and ranges, not project rows. The Department of Energy's Onsite Energy Installation Database, kept by ICF and Oak Ridge National Laboratory, lists US microgrids (461 operating in 2021, with 3.1 GW) as a downloadable spreadsheet, but its descriptions cover sites, technologies and capacity, not cost. The one open cost dataset found, from the University of Leeds (2025), is drawn from published papers, which are mostly designs rather than built projects.
osti.govbetterbuildingssolutioncenter.energy.govenergy.govarchive.researchdata.leeds.ac.uk
Built with what exists
pdftotext or pdfplumber; Python and a spreadsheet; the DOE installation spreadsheet as the list of sites to look for; a small AI model built for pulling figures out of long documents, such as Meta's Muse Ember (Note: "The jobs agents repeat"), told to return the page number with every figure.
First step
Fill the first ten rows from Connecticut's 2013 award list and ARENA's Agnew report.
Done looks like
At least 60 built microgrids, every figure linked to a page; a second person checks 15 rows chosen at random and agrees with at least 14; a table of cost per megawatt by type of site set beside NREL's 2018 averages.
Open 02 · the brief
What NY Prize's studies became
The first to publish is credited on this line, and the deliverable moves from Open to Achieved.
What to build
A table of the 83 community microgrid feasibility studies that New York's NY Prize competition paid for in 2015, each with its estimated cost and benefit-cost ratio (estimated benefits divided by costs), plus whether the microgrid was built and running by 2026, with a dated source for that status, and, for those built, the actual cost beside the estimate.
Why it is still open
NREL's 2018 cost study already pulled cost estimates from 80 of the studies, which it put at plus or minus 30%, but published only summary charts and noted that 11 projects went on to the design stage in March 2017. NYSERDA's 2017 evaluation, written by Brookhaven National Laboratory, reviewed a sample of the studies. No published count of how many were built, or of how their costs compared with the estimates, was found.
Built with what exists
The study PDFs on nyserda.ny.gov; pdftotext; Python; an extraction model with page citations (Note: "The jobs agents repeat"); news archives and town records for each site's status.
First step
Download the studies from NYSERDA's NY Prize folder, starting with the Town of Warwick study, and pull out the benefit-cost result from ten of them.
Done looks like
83 rows, each status backed by a dated public source; a one-page summary of the share built, whether the built ones had higher predicted benefit-cost ratios than the rest, and how far actual costs landed from the estimates where both are public.