Docks and piers

Docks, wharves, quays and piers are where ships tie up and where cargo and people cross between ship and shore: a wharf or quay runs along the shore, a pier or jetty reaches out into the water, and a pontoon floats.

5

Milestones achieved, from 1899 to 2024.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1899

    Concrete jetties for ships

    Reinforced concrete is concrete with steel bars cast inside it to carry tension. Louis Gustave Mouchel, working with François Hennebique's patented system, built a riverside wall on reinforced concrete piles at Southampton for the London and South-Western Railway in 1897, then a crane jetty at Woolston by 1899 and dock work at Liverpool. Two years later came a jetty extension at Devonport for the Admiralty, which, the industrial historian Roy Day wrote, "surely set the seal of approval on reinforced-concrete marine works."

    b-i-a-s.org.uk

    Credit

    L. G. Mouchel and the Mouchel-Hennebique firm; John Dixon, engineer of the London and South-Western Railway

  2. 1944

    Harbors towed across the Channel

    For the invasion of Normandy, the Allies built two harbors in Britain and towed them across after D-Day: floating roadways that rode up and down with the waves, pierheads that rose and fell with the tide, and breakwaters of scuttled ships and sunken concrete caissons. A storm two weeks after D-Day wrecked Mulberry A at Omaha Beach beyond repair, while Mulberry B at Arromanches, built for 90 days, landed 628,000 tons of supplies, 40,000 vehicles and 220,000 troops by 31 October 1944, by the Allied headquarters' count.

    LessonMulberry A was put in fast with shortcuts, such as fewer anchors on its roadway than the design called for, and a 2017 wave hindcast by Zoe Jackson and colleagues found that its site also met larger waves than Mulberry B's.

    ibiblio.orgdoi.org

    Credit

    Allied planners of Operation Neptune; Royal Engineer Allan Beckett, whose flexible roadway design was chosen

  3. 1958

    Air-filled rubber fenders

    A fender is the cushion that keeps a ship's hull off a dock or another ship. Yokohama Rubber says it developed the world's first pneumatic, or air-filled, fenders for offshore use in 1958, drawing on its work on tires and aircraft fuel tanks. Floating pneumatic fenders are now standard at ports, terminals and ship-to-ship transfers, and are made to an international standard, ISO 17357-1.

    y-yokohama.comy-yokohama.com

    Credit

    Yokohama Rubber

  4. 1995

    Kobe's quay walls slide

    Many of Kobe Port's quay walls were rows of caissons, huge concrete boxes set side by side on the seabed. In the Hyogoken-Nambu (Kobe) earthquake of 17 January 1995 they moved toward the sea by about 3 m on average and 5 m at most, and tilted and settled, but did not overturn. Frozen soil samples and shake-table tests showed that rising water pressure in the soil under and behind the caissons, which weakened it, drove most of the movement, while quay walls built to a higher earthquake standard "performed very well."

    LessonThe soil around a quay wall, not the concrete, decides how far it moves in an earthquake.

    doi.org

    Credit

    Inagaki, Iai, Sugano, Yamazaki and Inatomi, of Japan's Port and Harbour Research Institute among others

  5. 2024

    A repair weakens a wharf

    On 23 December 2024 waves of nearly 19 feet tore about 150 feet off the end of the Santa Cruz Municipal Wharf in California, and three workers fell into the sea; none was seriously hurt. Crews repairing the previous winter's storm damage had pulled down a restaurant and part of the roadway to reach and replace 70 piles, and the mayor said the buildings and roadway had been the weight that held the deck down on its piles.

    LessonTaking weight off a pier deck during repair can let waves lift it, and a rule protecting nesting birds limited the work to September through March, the storm season.

    kqed.org

    Credit

    City of Santa Cruz (owner); reported by KQED

Watch for

  1. Quay walls with digital twins

    A digital twin is a computer model kept in step with readings from the real structure. The European CLARION project, launched in 2024 with 20 partners from 11 countries, says sensors on "smart quay walls" at the Port of Rotterdam were used to tune a finite element model (a computer model that splits the wall and soil into many small pieces) into a digital twin, and that machine learning then predicted future stresses from tides and temperature, with the aim of extending the life of existing quay walls by 25 years.

    Achieved whensomeone outside the project compares the twin's forecasts with later sensor readings from the same wall and publishes the error, or a port extends a wall's approved working life on the model's evidence.

    repository.tudelft.nl

    Claimed by

    Alfred Roubos (TU Delft and Port of Rotterdam) and co-authors, at the International Conference on Soil Mechanics and Geotechnical Engineering, Vienna, June 2026

Open

  1. 01

    Quay walls moved by earthquakes

    An open table of every documented case of a quay wall, sheet-pile wall or pile-supported wharf that moved in an earthquake, with the wall type and height, the soil behind and below it, the measured shaking, and the measured seaward movement, settlement and tilt. Then test a simple rule against it, such as movement as a share of wall height against peak ground acceleration.

    The brief
    Credit · unclaimed
  2. 02

    Deck clearance for California piers

    For every open-coast public pier in California, a table of the deck's height above the sea and the storm wave crest it has to clear, today and with 0.5 m of sea level rise, ranked from least to most clearance.

    The brief
    Credit · unclaimed

Open 01 · the brief

Quay walls moved by earthquakes

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table of every documented case of a quay wall, sheet-pile wall or pile-supported wharf that moved in an earthquake, with the wall type and height, the soil behind and below it, the measured shaking, and the measured seaward movement, settlement and tilt. Then test a simple rule against it, such as movement as a share of wall height against peak ground acceleration.

Why it is still open

S. J. Hung and S. D. Werner compiled port earthquake damage case by case in 1982, for example a caisson quay wall at Shimizu that slid 8.3 m seaward in 1930, but their table is a scanned print. The case histories that designers calibrate against, such as those in PIANC's 2001 seismic guidelines for port structures, sit in a printed book, as Gazetas and colleagues show, and later cases such as Kobe sit in separate papers. A search for a compiled, downloadable set found none.

nehrpsearch.nist.govissmge.orgdoi.org

Built with what exists

pdftotext and Tesseract OCR for scanned reports; an AI model that reads tables from page images, with every value checked by a person against the page; the open archives of J-STAGE, the NEHRP library and the International Conference on Coastal Engineering; USGS ShakeMap for the shaking at each port; Python and pandas.

  1. First step

    Transcribe the Hung and Werner table, add the Kobe caisson figures, and check every number against its page.

  2. Done looks like

    A public CSV of at least 80 cases from at least 12 earthquakes, each value with a page reference, and a plot of movement against shaking with a fitted line and its scatter stated.

Open 02 · the brief

Deck clearance for California piers

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

For every open-coast public pier in California, a table of the deck's height above the sea and the storm wave crest it has to clear, today and with 0.5 m of sea level rise, ranked from least to most clearance.

Why it is still open

The Associated Press counted at least half a dozen California public piers closed after repeated storm damage over 2023 and 2024, and Capitola is rebuilding its wharf on piles that can be raised as the sea rises. A search found local studies, such as San Francisco's for its own port, but no statewide table of pier deck clearance.

pbs.orgkqed.org

Built with what exists

NOAA Digital Coast lidar for deck heights; wave records from Scripps' Coastal Data Information Program (CDIP) buoys and NOAA tide gauges; the USGS Coastal Storm Modeling System (CoSMoS) for future storm water levels; QGIS, PDAL and Python.

  1. First step

    Work out the numbers for Santa Cruz, Capitola and San Diego's Ocean Beach pier, and see whether the method ranks them among the least clearance.

  2. Done looks like

    A public table covering every open-coast public pier, with the count stated, deck height and estimated crest height for each, and a check of whether the piers with the least clearance are the ones that lost deck sections in the 2023 to 2025 storms.