Piles

Piles are long columns of timber, steel or concrete driven or set into the seabed to carry docks, piers, wharves and platforms.

4

Milestones achieved, from 1730 to 2025.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1730

    Shipworms eat the dike piles

    In the fall of 1730 dike inspectors in Zeeland found that the naval shipworm (Teredo navalis), a wood-boring clam, had riddled the wooden piles that shielded the province's sea dikes, and by 1731 inspectors in Holland and Friesland found the same. By the end of the 1730s many regions had adopted a design by two West Frisian water officials that took most of the wood out of the water and faced the seaward slope with heavy stone.

    LessonSundberg ties the outbreak to hot, dry summers that made the water saltier, so how long a timber pile lasts depends on the water around it as much as on the wood.

    environmentandsociety.org

    Credit

    Dutch dike authorities; Pieter Straat and Pieter van der Deure (the stone design); account by historian Adam Sundberg

  2. 1960

    Pile driving as a wave

    A hammer blow sends a stress wave down a pile, and the old pile-driving formulas treated it as a simple collision. Edward A. L. Smith, chief mechanical engineer of the pile contractor Raymond International, modeled the pile as a chain of weights and springs, solved it on an IBM computer and published the method in 1960. Wave equation analysis became the standard way to pick a hammer and check that a pile can be driven, and it was first applied to the long steel piles of offshore oil platforms.

    vulcanhammer.info

    Credit

    Edward A. L. Smith, Raymond International

  3. 1972

    A meter on every blow

    From 1964 a team at Case Institute of Technology in Cleveland, Ohio, funded by the Ohio highway department and the US Federal Highway Administration, measured force and acceleration at the pile head during driving and turned them into an estimate of the load the pile would carry, the Case method. George Goble's firm Pile Dynamics sold the first commercial unit, later named the Pile Driving Analyzer, in 1972. Dynamic testing became the norm for accepting offshore piles from the 1970s, and by the authors' estimate it is now used on more than 5,000 job sites a year.

    vulcanhammer.info

    Credit

    Robert Scanlan, George Goble and Frank Rausche at Case; Pile Dynamics

  4. 2025

    Venice piles last two years

    A study of 22 oak mooring piles in Venice found that piles attacked by shipworms often have to be replaced every 18 to 24 months, and that denser or thicker oak did not resist the borers any better. The authors report water about 2 °C warmer than two decades ago, warm-water shipworm species present since 2013, and many new oak piles still set without protection.

    LessonA bigger or denser timber pile does not buy time against borers; only a barrier or another material does.

    repository.tudelft.nl

    Credit

    Giorgio Pagella (TU Delft) and Tiziana Urso (University of Padua)

Watch for

  1. Capacity read through a follower

    A follower is a reusable steel extension set on top of a pile so the hammer can drive it below the working level. Japan's Chubu Regional Development Bureau and the National Institute for Land and Infrastructure Management (NILIM) fitted strain and acceleration gauges to a follower while driving steel pipe piles for a new 330 m berth at Yokkaichi Port, and report that a variant of the Case method gave soil resistance very close to gauges fixed on the pile itself. That would let capacity be checked on every pile without gauging each one, but the test covered 2 of the 160 piles.

    Achieved whenthe full results are published and the method is used across a whole wharf or written into Japan's technical standards for port facilities.

    cbr.mlit.go.jp

    Claimed by

    Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism (MLIT), with NILIM, 2025

Open

  1. 01

    Shipworm season by harbor

    A monthly map that flags the harbors where the water is warm and salty enough for Teredo navalis to breed and settle on timber piles, checked against dated outbreaks.

    The brief
    Credit · unclaimed
  2. 02

    Shared test for set meters

    A public set of recorded pile blows on a bench rig, each filmed on a phone at high frame rate and measured at the same time by a laser displacement sensor, so any camera or optical method for measuring set (how far a pile sinks for good with each blow) and rebound (how far it springs back) can be scored on the same blows.

    The brief
    Credit · unclaimed

Open 01 · the brief

Shipworm season by harbor

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A monthly map that flags the harbors where the water is warm and salty enough for Teredo navalis to breed and settle on timber piles, checked against dated outbreaks.

Why it is still open

Borges and colleagues mapped where nine shipworm species live in European waters and worked out the temperature and salinity each needs (2014), but gave no forecast by harbor or month. The one model of this kind, by Appelqvist and colleagues in 2015, covers the Baltic Sea only. In Venice a 2025 study reports warmer water, warm-water shipworms since 2013 and new oak piles still set without protection.

ebi.ac.ukebi.ac.ukrepository.tudelft.nl

Built with what exists

Copernicus Marine Service ocean reanalysis data (sea temperature and salinity, free to download); the breeding and settlement limits published by Appelqvist and colleagues and by Borges and colleagues; Python with xarray; QGIS for the maps.

  1. First step

    Rebuild the Baltic model from Copernicus data and compare it with the published map.

  2. Done looks like

    Monthly flags for 100 harbors worldwide, scored against at least 20 dated infestations (among them the Netherlands in the 1730s, San Francisco Bay in 1919 to 1921 and Venice since 2013), with every hit and miss published.

Open 02 · the brief

Shared test for set meters

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of recorded pile blows on a bench rig, each filmed on a phone at high frame rate and measured at the same time by a laser displacement sensor, so any camera or optical method for measuring set (how far a pile sinks for good with each blow) and rebound (how far it springs back) can be scored on the same blows.

Why it is still open

Camera methods exist, such as a high-speed line-scan camera system described by Bum-Jae You and colleagues in 2003, but each has been checked on its own data. A 2019 Florida Tech thesis found that a commercial monitor's rebound readings agreed only weakly with the university's camera system, and the Chubu bureau wrote in 2025 that staff on Japanese port jobs still often measure set and rebound standing under the hammer. No public set of blows with reference readings was found.

iaarc.orgrepository.fit.educbr.mlit.go.jp

Built with what exists

A phone filming at 240 frames per second; OpenCV marker tracking as a baseline method; a laser displacement sensor as the reference; a sand box with a 50 mm steel tube driven by a guided drop weight of a few kilograms.

  1. First step

    Build the bench rig and film 50 blows next to the laser sensor.

  2. Done looks like

    300 bench blows published with video and laser readings, and at least two methods scored on them, one of which comes within 0.5 mm on set and 1 mm on rebound.