BRENNEN

Industries / Mining and materials / Mining and quarrying / Salt and mineral extraction

Lithium mining

Lithium mining digs lithium-bearing rock and pumps lithium-rich brine from under salt flats, and refines both into the lithium carbonate and lithium hydroxide that go mostly into rechargeable batteries.

1898

Miners at the Etta pegmatite, a body of very coarse-grained granite in the Black Hills of South Dakota known for giant spodumene crystals, began what the US Geological Survey calls the first significant lithium mining.

pubs.usgs.gov

30

Milestones achieved across 6 domains.

10

To watch for: announced, not yet confirmed outside.

12

Open deliverables. Nobody has shipped them.

In one minute

Where it started

Lithium was recognized as an element in 1817, and the first significant mining of it began in 1898 at the Etta pegmatite in South Dakota, by the US Geological Survey's account. The United States was still the leading producer in 1973, with rock mines in North Carolina and brine at Searles Lake, California (from 1938) and Clayton Valley, Nevada (from 1966). When the last North Carolina spodumene mine closed early in 1998, the USGS wrote that production had moved to South America, with Chile's brine operations in the lead.

Where it stands

By USGS estimates, the world outside the United States produced about 290,000 t of lithium in 2025, 31% more than in 2024. Australia's hard-rock mines led with 92,000 t, ahead of China, Chile, Zimbabwe and Argentina, and batteries took 88% of all lithium used. Prices swing hard: the average US contract price for battery-grade lithium carbonate was US$63,700 a tonne in 2022 and US$9,000 in 2025, and mines and refineries built at the peak were idled.

What is open

Most of the open work is measuring and checking what companies and governments report. Open jobs include an open sorting test for spodumene ore, a monthly satellite record of which mines are working, a test of whether labs agree on what battery grade is, tables of how much lithium ponds lose and how much water rock-based lithium takes, a ledger of promised and actual start dates for direct-extraction plants, and lithium balances for battery recyclers. Most can be started at a desk or in a university lab with public filings, free satellite images and standard lab instruments.

Domains

AchievedWatch forOpen

Advances to build with

1 research note

Open in lithium mining

3 of 12 open deliverables

Open · Hard rock mining

An open spodumene sorting test

A public set of at least 2,000 fist-sized pieces of lithium pegmatite ore and waste rock, each photographed in color and near-infrared light, measured with a handheld LIBS analyzer (a laser that reads the light from a tiny spark on the rock's surface) and assayed for lithium in a lab. Add a baseline model that decides keep or reject for each piece, and report how much waste it removes against how much lithium it throws away.

Built with what exists

A conveyor belt or turntable with a color camera and a near-infrared camera; a handheld LIBS analyzer; lab assays for lithium; PyTorch with a pretrained image model such as DINOv2 or ResNet-50; the GFZ spectral library as a reference.

Credit · unclaimed

Open · Brine evaporation

Lithium lost in the ponds

A public table of lithium recovery for every brine pond operation: the share of the lithium pumped from the wells that ends up in product, as the operator reports it, as its feasibility study assumed it, and as implied by its reported output and the brine it pumped. Each figure links to the page it comes from.

Built with what exists

Technical report summaries filed with the US Securities and Exchange Commission on EDGAR, such as SQM's; Canadian NI 43-101 technical reports on SEDAR+; environmental impact studies in Chile's SEIA system; a large language model such as Claude to pull recovery figures from long reports, with a person checking each one (see the Note "Seven more flagged"); a spreadsheet.

Credit · unclaimed

Open · Direct extraction

DLE promises, tracked

A public ledger of DLE projects worldwide that records each first-production date a company has announced, with the date it announced it, the date the first product actually shipped, and the latest reported output against nameplate capacity, updated every quarter.

Built with what exists

Company releases and filings on EDGAR, SEDAR+ and the Australian Securities Exchange; the project lists in the Centro de Energía UC and Dallas Fed reports; a large language model such as Claude to pull dates from releases, with a person checking each one (see the Note "Seven more flagged"); a spreadsheet kept on GitHub or Zenodo so every change is dated.

Credit · unclaimed

Where it sits