Water use covers the fresh water and brine that lithium production takes from rivers and the ground at salt flats, hard-rock mines and refineries, and the rules that decide how much may be taken.

5

Milestones achieved, from 2021 to 2026.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 2021

    Fresh water counted, brine not

    A team at Argonne National Laboratory, a US Department of Energy lab, published a life cycle count of the energy, emissions and fresh water behind battery-grade lithium chemicals. By its figures, lithium carbonate from Salar de Atacama brine took 15.5 to 32.8 m³ of fresh water per tonne, against 77 m³ per tonne for lithium carbonate made from Australian spodumene, a lithium-bearing rock refined in China; for lithium hydroxide the figures were 31 to 50 m³ and 69 m³. The study left out the brine itself, which holds about 350 g/L of dissolved salts, about ten times more than seawater, because it is fit for neither farming nor drinking. Its rock figures rest on assumptions for a Western Australian mine and a 2017 impact report by Tianqi Lithium, and the study was funded by SQM, a brine producer.

    LessonA comparison of brine and rock turns on what is counted as water.

    osti.gov

    Credit

    Jarod C. Kelly, Michael Wang, Qiang Dai and Olumide Winjobi, Argonne National Laboratory (Resources, Conservation and Recycling, 2021)

  2. 2024

    A court stops new permits

    On 13 March 2024 the Court of Justice of Catamarca, Argentina, ordered the province to study the combined effect of all lithium projects on the Los Patos River and the Salar del Hombre Muerto, and to grant no new mining permits or water authorizations there until the study was done. The majority opinion, written by Justice Carlos Miguel Figueroa Vicario, held the damage at the Trapiche River proven: a provincial report of 30 September 2021 found that a dam built to take the river's water for the Fénix lithium project had left it with no flowing channel, and that the site was being restored. The province presented its study in July 2025, and in March 2026 the court lifted the order, finding no current damage shown, while requiring monitoring and hydrological studies to continue.

    LessonPermits granted one project at a time can miss what several projects on one river do together.

    juscatamarca.gob.arelancasti.com.ar

    Credit

    Román Elías Guitian and the Atacameños del Altiplano indigenous community, who brought the case in August 2021; the Court of Justice of Catamarca

  3. 2024

    The salt flat sinks

    Researchers at the University of Chile used InSAR, a method that compares satellite radar images taken at different times to measure how the ground moves, to show part of the Salar de Atacama sinking where brine is pumped. A 2024 thesis by Joaquín Castillo, using Sentinel-1 images from 2014 to 2023, measured sinking of up to 0.5 cm a year over areas of up to 8 km² on the southwest side of the salt core, with shorter episodes of up to 2 cm, and linked it to permanent compaction of fine-grained layers in the top 300 m. Reuters reported in August 2024 that a paper led by Francisco Delgado in IEEE Transactions on Geoscience and Remote Sensing, using Argentina's SAOCOM-1 radar satellites from 2020 to 2023, found 1 to 2 cm a year over an area about 8 km by 5 km.

    LessonPumping brine can compact the ground for good, and satellites can read that record from orbit.

    repositorio.uchile.cltheprint.in

    Credit

    Francisco Delgado, Joaquín Castillo and colleagues, University of Chile

  4. 2025

    Thacker Pass water settled

    Lithium Americas' Thacker Pass project, a lithium clay mine under construction in northern Nevada, needs about 200 acre-feet of water a year during construction and about 2,600 acre-feet (about 3.2 million m³) a year in production, by the Nevada Independent's account. Ruling on a challenge by the rancher Edward Bartell, Nevada's Sixth Judicial District Court reversed the State Engineer's approval of two of the five water-rights transfers the project relied on, finding that the engineer had not fully determined the effect of the pumping on the ranch. The state ordered pumping stopped while the matter was reexamined, though it granted extensions. On 31 July 2025 the company settled by buying water rights from Bartell, and the appeal before the Nevada Supreme Court was dismissed.

    LessonA water transfer approved without measuring its effect on neighbors can be reopened after construction starts.

    thenevadaindependent.com

    Credit

    Edward Bartell; Nevada's Sixth Judicial District Court; Lithium Americas

  5. 2026

    Unused brine rights kept

    In Nevada lithium brine is groundwater under state water law, so pumping it needs a water right, and in Clayton Valley one company controls the groundwater, as Inside Climate News reported in 2024. Albemarle's Silver Peak operation holds permits for up to 20,000 acre-feet (about 24.7 million m³) a year, held by it and earlier owners since 1993 and extended many times. Pure Energy Minerals, which needed water for its own project, argued that Albemarle was hoarding water it did not use. On 20 February 2026 the Supreme Court of Nevada reversed a lower court and upheld the State Engineer's grant of more time, finding it supported by substantial evidence.

    LessonA new way to take lithium from brine still needs water rights, and where they are already held a newcomer has to win them from the holder.

    caselaw.findlaw.cominsideclimatenews.org

    Credit

    Supreme Court of Nevada; the Nevada State Engineer; Albemarle; Pure Energy Minerals (challenger)

Watch for

  1. A basin study finds stability

    Catamarca's government says the cumulative study of lithium mining on the Los Patos River and the Salar del Hombre Muerto, made by an outside consultancy with funding from Argentina's Federal Investment Council between September 2024 and May 2025, shows the area's environmental systems to be generally stable. It says validated groundwater models show the aquifer keeping its ability to recover under mining scenarios, puts the salt flat's total recharge at 7,372.8 m³ an hour, and says the Vega Trapiche, a high-altitude wetland, is recovering after restoration work. The Atacameños del Altiplano community rejected the study, saying it was not consulted and that rivers and wetlands are drying.

    Achieved whenthe study's seven monitoring programs publish their data and an independent group confirms the recharge estimate and the wetland's recovery.

    elancasti.com.arelancasti.com.ar

    Claimed by

    the government of Catamarca, July 2025

Open

  1. 01

    Check the Hombre Muerto study

    A public, repeatable satellite record of the wetlands, locally called vegas, and of the Los Patos and Trapiche rivers around the Salar del Hombre Muerto from 1985 to 2026: monthly areas of green vegetation and open water, set against the dates each lithium project began taking water, and compared claim by claim with the province's 2025 cumulative study.

    The brief
    Credit · unclaimed
  2. 02

    Water per tonne, hard rock

    An open table of the water that hard-rock lithium mines and refineries report taking and consuming, per tonne of spodumene concentrate and per tonne of lithium hydroxide or carbonate, for every operating site, with each figure linked to the page it comes from and set beside the figures that life cycle models assume.

    The brief
    Credit · unclaimed

Open 01 · the brief

Check the Hombre Muerto study

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public, repeatable satellite record of the wetlands, locally called vegas, and of the Los Patos and Trapiche rivers around the Salar del Hombre Muerto from 1985 to 2026: monthly areas of green vegetation and open water, set against the dates each lithium project began taking water, and compared claim by claim with the province's 2025 cumulative study.

Why it is still open

The province says its study was built from earlier studies and finds stability; the indigenous community answers with a comparison of two satellite images, from March 1993 and March 2024; and the March 2026 ruling that lifted the court's order still calls for more hydrological study. AIDA, an environmental law group, has published a satellite story map of drainage at the salt flat but gives no measured figures. Panorama Minero reported in March 2026 that 2.56 ha of the 13.5 ha Vega Trapiche had been revegetated since 2020 under a plan run by the province and the operator. The method exists elsewhere: Wenjuan Liu, Datu Agusdinata and Soe Myint used Landsat and MODIS images from 1997 to 2017 to link mining at the Salar de Atacama with falling vegetation and soil moisture (2019). Searches for this brief found no published time series of the vegas at Hombre Muerto.

elancasti.com.arelancasti.com.araida-americas.orgpanorama-minero.comasu.elsevierpure.com

Built with what exists

Landsat 5, 7, 8 and 9 and Sentinel-2 images, free through Google Earth Engine; vegetation and water indices such as NDVI and NDWI computed from them; the 2024 court ruling, which names the projects and the 2021 provincial report on the Trapiche River; Python.

  1. First step

    Draw the outline of the Vega Trapiche on a Landsat image from before 1998 and compute its vegetation index for every clear image through 2026.

  2. Done looks like

    Monthly series from 1985 to 2026 for at least 10 named vegas and both rivers, with code and outlines public; the change in each before and after each nearby water intake began, with its uncertainty; and a written check of each of the study's published claims, including the recovery of the Vega Trapiche.

Open 02 · the brief

Water per tonne, hard rock

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An open table of the water that hard-rock lithium mines and refineries report taking and consuming, per tonne of spodumene concentrate and per tonne of lithium hydroxide or carbonate, for every operating site, with each figure linked to the page it comes from and set beside the figures that life cycle models assume.

Why it is still open

Argonne's 2021 study built its rock figures on "informed assumptions" for a Western Australian mine. A 2025 study by Shayan Khakmardan and colleagues at the University of Melbourne writes that this model "heavily relied on assumptions rather than high-quality primary data", that a 2022 study reused its inputs, and builds an inventory for one mine, Greenbushes. Searches for this brief found no table of reported water use across hard-rock sites.

minerva-access.unimelb.edu.auosti.gov

Built with what exists

Operators' annual and sustainability reports; environmental impact reports for refineries, including those Chinese local governments post for public comment; a model built for reading long documents, such as Muse Ember (see the Note "The jobs agents repeat"), with a person checking every figure; a spreadsheet.

  1. First step

    Take the five largest spodumene producers in Western Australia, pull the water figures from each one's latest sustainability report, and divide them by the concentrate tonnes each reports for the same year.

  2. Done looks like

    At least 12 mines and 6 refineries in at least four countries, each with water taken and water consumed per tonne for the same year and the same boundary, every value linked to its page, and the Greenbushes figure compared with the 2025 Melbourne inventory.