Hard rock mining digs lithium-bearing rock, mostly spodumene from pegmatites (very coarse-grained granite rocks), out of open pits and underground mines, then crushes it and separates the lithium mineral into a concentrate that is shipped to refineries.

7

Milestones achieved, from 1898 to 2024.

2

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1898

    Lithium mined in South Dakota

    Pegmatites can hold the lithium minerals spodumene, petalite and lepidolite. The US Geological Survey (USGS) dates the first significant lithium mining to 1898, at the Etta pegmatite in the Black Hills of South Dakota, a mine known for giant spodumene crystals. Pegmatite mines in California, South Dakota and New Mexico followed in the early 1900s. By the USGS's later count, the United States produced 470 t of lithium minerals in 1900, holding less than 10 t of lithium, used mostly in specialty glass, enamels and glazes.

    pubs.usgs.govd9-wret.s3.us-west-2.amazonaws.com

    Credit

    The Etta mine's operators; the sources name none

  2. 1950s

    Carolina spodumene peaks

    Kings Mountain, North Carolina, was mined for gold from 1834 and prospected for tin from 1880. In 1935 L. M. Williams found large spodumene deposits there, in what is now called the Tin-Spodumene Belt, and lithium production at Kings Mountain peaked in the 1950s, by the account of Albemarle, which owns the site today. The USGS describes how the ore was handled: crushing, wet grinding, sieving, gravity concentration and flotation, a method in which chemicals make the wanted mineral cling to air bubbles and float off. The leftover tailings went to storage ponds that likely still hold some lithium. Mining at the site stopped in the early 1990s.

    albemarle.compubs.usgs.gov

    Credit

    L. M. Williams (discovery); the Kings Mountain mine operators

  3. 1983

    Greenbushes turns to lithium

    Greenbushes, in the southwest of Western Australia, was mined for tin from 1888 and later for tantalum. Drilling from 1977 to 1980 outlined a lithium orebody, and Talison Lithium, the operator, dates its lithium production to 1983 and calls Greenbushes the longest continuously operated mining area in the state. The USGS describes the Greenbushes pegmatite as 3 km long and a few hundred meters across, large for its kind. Talison is owned by Windfield Holdings, which is 51% owned by Tianqi Lithium Energy Australia, in which IGO holds a stake, and 49% by Albemarle.

    talisonlithium.compubs.usgs.gov

    Credit

    Talison Lithium and its predecessors at Greenbushes

  4. 1998

    America's last spodumene mine closes

    Early in 1998 FMC closed its spodumene mine and lithium carbonate plant near Bessemer City, North Carolina, because its new brine operation in Argentina, completed in 1997, made lithium carbonate more cheaply. Cyprus Foote's Kings Mountain mine had been idle since 1991. The USGS wrote that the shift of lithium production from the United States to South America was complete, and that Chile overtook the United States as the leading producer that year. It also explained why: making lithium carbonate from spodumene takes an energy-intensive chemical process that costs more than the brine route.

    LessonA cheaper source can empty a mining district within a few years, and the balance can swing back when demand grows faster than that source: by USGS estimates, Australia's hard-rock mines produced about 92,000 t of lithium in 2025 against Chile's 56,000 t.

    d9-wret.s3.us-west-2.amazonaws.comd9-wret.s3.us-west-2.amazonaws.comd9-wret.s3.us-west-2.amazonaws.compubs.usgs.gov

    Credit

    FMC Corporation (closure); USGS (record)

  5. 2022

    Serbia revokes the Jadar plan

    Rio Tinto planned a mine for lithium and borates at Jadar in Serbia, a rare lithium-boron deposit unlike the pegmatites and brines that supply most lithium, sized in one trade account for about 58,000 t a year of lithium carbonate. Public opposition led the government to revoke the project's permits in 2022. The government reinstated the project's spatial plan on 16 July 2024, and the European Union has named Jadar a Strategic Project, but Rio Tinto is moving it into care and maintenance, meaning upkeep with no construction or production.

    LessonA large deposit does not make a mine when the people who live near it do not accept it.

    riotinto.comminingsee.eu

    Credit

    Government of Serbia; the project's local opponents; Rio Tinto

  6. 2022

    Zimbabwe keeps ore at home

    In 2022 Zimbabwe, Africa's largest lithium producer, banned exports of raw lithium ore, so miners had to concentrate the ore in the country before shipping it. In June 2025 the mines minister, Winston Chitando, said exports of concentrate would also end in January 2027, pointing to lithium sulfate plants being built at the Bikita and Prospect mines. On 25 February 2026 the government suspended exports of all raw minerals and lithium concentrate with immediate effect, until further notice. Zimbabwe had exported 1.128 million t of spodumene concentrate in 2025, most of it to China, as Al Jazeera reported.

    LessonSuch rules bend with the market: Mining Weekly reports that Zimbabwe softened an earlier deadline for local refinery plans after prices collapsed in 2023.

    miningweekly.comaljazeera.com

    Credit

    Government of Zimbabwe, Ministry of Mines and Mining Development

  7. 2024

    A price crash idles mines

    By the USGS's figures, the price of spodumene concentrate (6% lithium oxide, loaded on ship in Australia) fell from about US$6,000 a tonne in January 2023 to about US$2,500 in November, and to about US$730 by November 2024. On 5 January 2024 Core Lithium said it would stop mining the Grants open pit at its Finniss operation in Australia, keep its concentrator running on about 280,000 t of stockpiled ore until mid-2024, and put the site of its BP33 project into care and maintenance, after the concentrate price fell more than 85% in 12 months. The USGS reports that many lithium projects were postponed or canceled in 2024 because of low prices.

    LessonWhen prices fall, the highest-cost mines stop first, so a mine plan has to work at the low end of the price range, not only at the peak.

    announcements.asx.com.aupubs.usgs.govpubs.usgs.gov

    Credit

    Core Lithium (decision); USGS (price series)

Watch for

  1. Greenbushes's third plant

    IGO, which holds an indirect stake in Greenbushes, reports that Chemical Grade Plant 3 (CGP3), the mine's third concentrator, reached its design rate in September 2026, nine months after it first processed ore and despite a fire in June. It says the mine produced a record 435,000 t of spodumene concentrate in the September 2026 quarter, at a cash cost of A$418 a tonne.

    Achieved whenthe audited annual accounts of Greenbushes's owners show a full year of output at the expanded rate.

    announcements.asx.com.au

    Claimed by

    IGO, October 2026

  2. Restarting Jianxiawo

    CATL's Jianxiawo mine in Yichun, Jiangxi province, digs lepidolite, a lithium-bearing mica, and stopped when its mining license expired in August 2025. Reuters reported that CATL obtained a safety production permit on 29 June 2026, which clears one hurdle to a restart, and gave the mine's capacity as about 46,000 t a year of lithium carbonate equivalent, about 3% of 2025 world output, citing Australian government data. In early August 2026 the Yichun environmental bureau confirmed the site was still idle, as Caixin reported, and Benchmark has reported that the bureau withdrew its acceptance notice for the mine's environmental assessment.

    Achieved whenthe Yichun authorities or CATL's filings report ore being mined and processed again, with output figures.

    kitco.comcaixinglobal.comskillings.net

    Claimed by

    CATL, through the permit reported by Reuters, July 2026

Open

  1. 01

    An open spodumene sorting test

    A public set of at least 2,000 fist-sized pieces of lithium pegmatite ore and waste rock, each photographed in color and near-infrared light, measured with a handheld LIBS analyzer (a laser that reads the light from a tiny spark on the rock's surface) and assayed for lithium in a lab. Add a baseline model that decides keep or reject for each piece, and report how much waste it removes against how much lithium it throws away.

    The brief
    Credit · unclaimed
  2. 02

    Mine status read from orbit

    A free monthly record of whether each of at least 20 hard-rock lithium mines is digging, hauling and building stockpiles, read from Sentinel-2 optical and Sentinel-1 radar images, set beside what each owner says (operating, care and maintenance, restarting).

    The brief
    Credit · unclaimed

Open 01 · the brief

An open spodumene sorting test

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public set of at least 2,000 fist-sized pieces of lithium pegmatite ore and waste rock, each photographed in color and near-infrared light, measured with a handheld LIBS analyzer (a laser that reads the light from a tiny spark on the rock's surface) and assayed for lithium in a lab. Add a baseline model that decides keep or reject for each piece, and report how much waste it removes against how much lithium it throws away.

Why it is still open

Sorting machines already work in the industry. Companhia Brasileira de Lítio in Brazil runs Steinert sorters with X-ray and color sensors to remove schist, the host rock, before milling, but the published case gives no figures beyond a "significant reduction" in dilution. The open lithium mineral data found for this brief are a spectral library of 18 mineral specimens from GFZ Potsdam and hyperspectral scans of five drill cores from Western Australian pegmatites (CSIRO, 2023), not rock pieces scored for sorting.

globalminingreview.comdoi.orgdoi.org

Built with what exists

A conveyor belt or turntable with a color camera and a near-infrared camera; a handheld LIBS analyzer; lab assays for lithium; PyTorch with a pretrained image model such as DINOv2 or ResNet-50; the GFZ spectral library as a reference.

  1. First step

    Ask the Geological Survey of Western Australia, whose core scans CSIRO used, or an operating mine for 200 labeled pieces of ore and waste rock, and photograph and assay them as a pilot.

  2. Done looks like

    At least 2,000 pieces from at least three deposits, published with images and assays, and a curve of waste rejected against lithium lost for a model tested on a deposit it was not trained on, that anyone can try to beat.

Open 02 · the brief

Mine status read from orbit

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A free monthly record of whether each of at least 20 hard-rock lithium mines is digging, hauling and building stockpiles, read from Sentinel-2 optical and Sentinel-1 radar images, set beside what each owner says (operating, care and maintenance, restarting).

Why it is still open

Reports on the same mine disagree. In July 2026 Reuters reported that CATL had the safety permit to restart Jianxiawo; in August Caixin reported the site idle, confirmed by the local environmental bureau. The open global map of mines by Maus and colleagues (Scientific Data, 2022) outlines mine areas from 2019 Sentinel-2 images, a single snapshot that does not say whether a mine is working. Searches for this brief found vendor offers of satellite mine monitoring but no open monthly record for lithium mines with its methods and error rates.

doi.orgcaixinglobal.com

Built with what exists

Copernicus Sentinel-1 and Sentinel-2 images through Google Earth Engine or the Copernicus Data Space Ecosystem; the Maus et al. mine outlines; a geospatial foundation model such as NASA and IBM's Prithvi, or a simple change-detection script in Python; company announcements on the Australian, Shanghai and Shenzhen exchanges as ground truth.

  1. First step

    Draw outlines of five mines with known stop and restart dates, starting with Core Lithium's Grants pit, where mining stopped in January 2024, and test whether month-by-month change in the pit and waste dumps shows the stop.

  2. Done looks like

    24 months of status calls for at least 20 mines in Australia, Zimbabwe, Mali, Brazil and China, each checked against dated company announcements, with at least 90% agreement in the months where the company's own status is known, and code and data public.