Mooring is holding barges in place while they wait in a fleet: tying them to the bank, to steel mooring cells, to buried anchors called deadmen or to spar barges (old barges fixed in place to hold others), and keeping them there through floods, ice, storms and the wash of passing boats.

7

Milestones achieved, from 1962 to 2018.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1962

    Europe sets berthing rules

    The European Code for Inland Waterways (CEVNI), written by the UN Economic Commission for Europe and first established in 1962, is a model code that governments and river commissions use to bring their navigation rules into line with each other. Its current fifth edition says that stationary vessels and convoys must be "anchored or made fast in such a way that they cannot change position," taking into account "the wind, changes in the water level, suction and wash." It bans using "trees, railings, posts, marker stones" and similar objects for making fast, lets a sign limit how many vessels may lie abreast, and requires every berthed vessel to be watched by "a person capable of acting quickly if the need arises," with the duty falling on the operator when no boatmaster is aboard.

    ls-fts.unog.ch

    Credit

    UNECE Working Party on Inland Water Transport

  2. 1976

    Fleets agree on wire

    On the Mississippi between Baton Rouge and New Orleans, fleets broke away often in 1974, and there were no rules for common mooring practice. The Coast Guard asked barge line managers for help, and the Greater New Orleans Barge Fleeting Association (GNOBFA), founded in 1976, became the place where fleet operators and the Coast Guard worked out standards together. One result, by the account of founding member Alan Savoie, was 7/8-inch wire rope as the standard for tying up barges, first in 20-foot lengths and then in the 35-foot lengths that line-haul tows already used. In 1995 GNOBFA and the Coast Guard published the "Barge Fleeting Standard of Care and Streamline Inspection Program Guide Book," still used to train fleet crews.

    waterwaysjournal.net

    Credit

    Greater New Orleans Barge Fleeting Association; US Coast Guard

  3. 1982

    One fleet frees another

    On 14 December 1982, ten barges moored in an unauthorized fleeting area on the Arkansas River came adrift in high water and drifted into an authorized fleet, setting 25 more barges loose; they struck a highway bridge and a grain dock, and 3 more broke free there. Damage passed $12 million. The NTSB found the fleet operator had a "lax attitude" toward its permit and asked the Corps of Engineers to check that fleet permits were obeyed (recommendation M-83-58) and to protect the Arkansas River dams from breakaway barges (M-83-59). The Corps began surveillance of permitted barge tie-ups, and at Dam 2 it sank old barges below the stilling basin and filled them and the gap with concrete, finished in November 1992.

    LessonOne badly moored fleet can set the next one loose, so a fleet is only as safe as the fleets upriver of it.

    ntsb.gov

    Credit

    National Transportation Safety Board; US Army Corps of Engineers

  4. 1994

    Rules follow the breakaways

    A regulated navigation area (RNA) is a stretch of water where the Coast Guard sets its own local rules. Its fleet mooring rules for the Mississippi first covered mile 88 to mile 127 above Head of Passes, around New Orleans. Data then showed more breakaways upriver than inside that area, and fleet inspectors found that many fleets upriver "had weak and inadequate moorings." On 28 April 1994 the Coast Guard extended the area to mile 240, up to Baton Rouge, and made it final on 25 July 1995. Its casualty investigations "appeared to indicate that a majority of the breakaways occurred as the result of a passing tow or deep draft vessel striking the fleet or from large wakes generated by passing vessels," both worse at high water. The Coast Guard said the extension had "resulted in a decrease in the number of barge breakaways," while noting that a mild high-water season may have helped.

    LessonFleets are pulled loose by passing traffic as well as by the river, so rules must cover how fleets sit beside the channel.

    govinfo.gov

    Credit

    US Coast Guard, Eighth District and Captain of the Port New Orleans

  5. 2014

    Engineers certify storm moorings

    During Hurricanes Katrina (2005) and Gustav (2008), barges and other vessels were moored beside the floodwalls of the Inner Harbor Navigation Canal in New Orleans, and in Gustav several broke free and nearly hit the Almonaster Street Bridge. At the State of Louisiana's request, the Coast Guard set up an area in which all vessels must leave the canals before a severe storm, by an interim rule of June 2010. Its final rule of 15 April 2014 moved from waivers to performance standards: a fleet that wants to keep barges in the permitted reaches must file a hurricane operations plan by 1 May each year, with "certification by a professional engineer that the mooring arrangements are able to withstand winds of up to 140 mph, a surge water level of eleven feet, a current of four mph and a wave height of three feet." The rule also requires mooring inspections, inspection records and continuous watch on the fleet.

    govinfo.govlaw.cornell.edugovinfo.gov

    Credit

    US Coast Guard Sector New Orleans; US Army Corps of Engineers, which supplied the engineering analysis in February 2013

  6. 2018

    Fixed berths replace anchoring

    For years inland vessels waiting in the port of Rotterdam had anchored off the Maas side of the Eiland van Brienenoord. "Barges are so large and heavy that they can break free when they are anchored. That happened sometimes with the tide changes," said Ronald Paul, the port authority's chief operating officer. The port built five fixed berths there, each for five vessels of 76.5 to 110 m, designed with the barge operators, and accepted them from the builder, De Klerk of Werkendam, on 1 October 2018.

    portofrotterdam.comen.portnews.ru

    Credit

    Port of Rotterdam Authority; De Klerk

  7. 2018

    Ice tears out a ring

    On 13 January 2018, after record rain raised the Ohio River more than 12 feet in a night, 27 barges broke free from the Jacks Run fleeting area near Pittsburgh and struck the Emsworth Locks and Dams; damage exceeded $12.5 million. The NTSB found that river current pushing on ice packed at the head of the fleet broke a mooring ring off its cell, and that two cells were unusable and the site had silted up, so crews could not narrow the fleet as their own guide said. After breakaways in 1985, the Corps, the Coast Guard and industry had pressed fleets to write waterfront facility operations guides, but no regulation required them; the Corps of Engineers requires no engineering check of mooring cells, and the Coast Guard had no safety rules for fleets holding ordinary cargo. The NTSB asked the Corps to require and review the guides, both agencies to agree a maintenance policy, and the Coast Guard to create a regulated navigation area for Pittsburgh (M-19-4 to M-19-7).

    LessonA fleet permit that checks only the channel leaves the strength of the moorings to whoever happens to hold the lease.

    ntsb.govntsb.gov

    Credit

    National Transportation Safety Board

Watch for

  1. Fleet built for high water

    Harbor Towing & Fleeting says its new Star Fleet East, on the Gulf Intracoastal Waterway east of Harvey Lock in New Orleans, has 4,000 feet of fleeting space held by 20 steel monopile mooring dolphins (single large piles), each 54 inches across and 185 feet apart, with synthetic mooring lines "with breaking strength exceeding regulatory requirements," and calls it "more safe, reliable fleeting capacity."

    Achieved whenthe fleet has come through a hurricane season and a high-water season, and the Coast Guard or an outside surveyor reports no breakaways and the mooring loads or inspections that support the claim.

    waterwaysjournal.net

    Claimed by

    Harbor Towing & Fleeting, July 2026

Open

  1. 01

    A register of breakaways

    A public table of every reported breakaway of barges from a fleet or terminal on US rivers and Gulf Coast waterways since 2000: date, river mile, the reading and 24-hour rise at the nearest gauge, ice, wind or named storm, number of barges, what held them (cell, deadman, spar barge, piling, wire or synthetic line), what failed first, whether a passing vessel was involved, whether the fleet lay inside a Coast Guard regulated navigation area with mooring rules, what the barges struck, damage, and a link for every value.

    The brief
    Credit · unclaimed
  2. 02

    Line loads along a tier

    A scale-model test, in a university flume, of how the pull of the current spreads among the mooring lines of a tier of barges, for tiers of different length and width, at several current speeds, with and without a block of model ice at the head, and a published table of when a tier should be shortened.

    The brief
    Credit · unclaimed

Open 01 · the brief

A register of breakaways

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A public table of every reported breakaway of barges from a fleet or terminal on US rivers and Gulf Coast waterways since 2000: date, river mile, the reading and 24-hour rise at the nearest gauge, ice, wind or named storm, number of barges, what held them (cell, deadman, spar barge, piling, wire or synthetic line), what failed first, whether a passing vessel was involved, whether the fleet lay inside a Coast Guard regulated navigation area with mooring rules, what the barges struck, damage, and a link for every value.

Why it is still open

The evidence sits in single cases. The NTSB counted six breakaways around Pittsburgh in the first five months of 2018 alone, in an area with "over 350 known fleeting areas"; its later reports cover one or two barges at a time, such as the barge MPC 1056, which parted a headline in high winds in March 2025 and was noticed only when it hit a marina, and two tank barges that broke free in April 2024, possibly struck by debris. The Coast Guard showed breakaway statistics for 1990 to July 1994 at a public hearing but printed only conclusions in its rule. Storm counts are scattered the same way: in Hurricane Gustav the Gulf Intracoastal Canal Association said 95 percent of vessels obeyed advisories to leave and three idle vessels broke loose in the New Orleans canal, and in Hurricane Ida in 2021 St. Bernard Parish officials said 22 barges were loose on the Mississippi near Chalmette. Searches found no public count of breakaways across rivers, years or storms.

ntsb.govntsb.govntsb.govgovinfo.govmarinelink.comaudacy.com

Built with what exists

the Coast Guard's CGMIX search of closed investigation reports, which exports to a spreadsheet; NTSB report PDFs; Coast Guard Marine Safety Information Bulletins issued before and after storms; USGS and Corps river gauge records; NOAA storm tracks; the boundaries of 33 CFR 165.803 and 165.838 drawn in QGIS; Waterways Journal and other trade press archives; pdftotext; a low-cost extraction model such as Meta's Muse Ember to fill each field and quote the sentence it came from (see the Note "The jobs agents repeat"); a shared spreadsheet.

  1. First step

    code the four NTSB breakaway reports cited in this section by hand to settle the fields, then run a CGMIX search for 2015 to 2025.

  2. Done looks like

    at least 150 breakaway events from 2000 to 2025, each with a gauge reading and at least one cause coded; a second person re-codes a random 20 percent without seeing the first codes, with agreement published field by field; the count for the Pittsburgh area in January to May 2018 matches the NTSB's six or the difference is explained; breakaways during at least ten Gulf Coast storms from 2005 to 2025 compared for fleets inside and outside the regulated areas.

Open 02 · the brief

Line loads along a tier

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A scale-model test, in a university flume, of how the pull of the current spreads among the mooring lines of a tier of barges, for tiers of different length and width, at several current speeds, with and without a block of model ice at the head, and a published table of when a tier should be shortened.

Why it is still open

After 11 barges broke from a fleet on the San Jacinto River in 2019, the NTSB wrote that "it is likely that the strain was not distributed evenly among the lines," so that each line failed in turn, and that shorter strings "would have been less vulnerable to swift currents". At Emsworth in 2018 it found that current on ice at the head of the fleet exceeded the fittings' capacity. The New Orleans canal rule requires lines "of sufficient strength and in sufficient number" and an engineer's certificate, but gives no method. The Corps' cold-regions laboratory published a report on ice control in river harbors and fleeting areas in 1988 (Perham). Searches found US Navy model tests of single moored barges and studies of passing ships, but no measurements of how load shares out along a river barge tier.

ntsb.govntsb.govlaw.cornell.eduapi.crossref.org

Built with what exists

model barges at 1:50 scale, 3D-printed or cut from plywood; a recirculating flume; miniature S-beam load cells with HX711 amplifiers on an Arduino; an acoustic Doppler velocimeter for current; MoorDyn, an open-source mooring-line model, to compare with the measurements; Python.

  1. First step

    build two model barges, moor them in line in a flume at one speed, and measure the head line and stern line loads.

  2. Done looks like