BRENNEN

Industries / Transport and vehicles / Maritime and shipping / Barge and inland waterways / Fleeting services

Building and breaking tows

Building a tow means lashing barges into one rigid raft with wires and winches so that a towboat can push it, and breaking a tow means taking the raft apart again so that harbor boats can deliver each barge.

5

Milestones achieved, from 1850 to 2023.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1850

    The fleet goes in front

    The first steam towboats that took Pittsburgh coal down the Ohio from 1845 fastened the coal barges and boats "at the sides and in the rear of the tow-boat." Experience soon showed, by Daniel Bushnell's account to the state geologist J. Sutton Wall, that "the bulk of the coal fleet should be placed at the bow of the tow-boat instead of the stern, and that the tow-boat should be used to propel and steer the fleet, instead of dragging or pulling it along." Bushnell's side-wheel towboat Black Diamond, built in 1849, carried coal to Cincinnati in 1850 with Jacob J. Vandergrift as pilot, and Bushnell told Wall that "this was the first trip with a coal fleet placed ahead of the boat."

    archive.org

    Credit

    Daniel Bushnell; Jacob J. Vandergrift

  2. 1970

    Pushing ends Rhine towing

    On the Rhine and West German canals, unpowered barges were long pulled on lines in trains behind tugs. In 1957 such towed barges still made up 62.4 percent of West Germany's inland cargo capacity, and by 1968 27.4 percent, by figures Fritz W. Achilles took from the yearbook Binnenschiffahrt in Zahlen for an article in the German Maritime Museum's journal. Most were scrapped in the early and middle 1960s and some fitted with engines, and by 1970, Achilles wrote, towing as a way of working had come to an end in West Germany, giving way to pushed convoys (barges lashed rigidly ahead of a push boat) and self-propelled ships. Today's European standard for inland vessels, ES-TRIN, requires a pusher that joins barges with cables to carry at least two special winches to tension them, requires the coupling to make the convoy rigid, a "nautical unit," and sizes each coupling from the pusher's engine power, with 1,200 kN deemed enough at the first coupling point.

    LessonEarly pushing with "packets" of old towed barges coupled together did not work, Achilles wrote: it was run mostly by French owners, and after a short time the neglected barges were no longer fit to sail.

    urn.dsm.museumcesni.eu

    Credit

    Rhine and West German barge lines; CESNI, which writes ES-TRIN

  3. 2010

    Winches that hold their wire

    On US rivers, deckhands make up a tow by running a wire from a winch or ratchet on one barge to a fitting on the next and tightening it by hand. David Grapes of the Patterson Company in Pittsburgh said his father, Eugene Grapes, designed the angle-shank ratchet in the 1960s, "lighter, stronger, faster and more portable than welded-link ratchets used before." In 2010 Patterson introduced the YoYo winch, which winds the wire in a single stack inside guards so that a kinked or suddenly slack wire cannot spring loose; by January 2012 more than 3,000 were in use, about 5 percent of the market by Patterson's count, including in the fleets of American Electric Power and Campbell Transportation. In 2019 NABRICO said its FASST Winder, worked with a handle and foot pedal and needing no "cheater pipe," had been on the market for nearly three years.

    LessonA tool the deckhand must find and fit each time is misused; a 2016 Arcosa patent says operators using loose pipe extensions on ratchets often move badly and can overextend and be seriously injured, so makers built the extra turning force into the winch itself.

    waterwaysjournal.netmarinelink.commarinelink.commarinelink.compatents.google.com

    Credit

    Eugene Grapes and the Patterson Company; NABRICO

  4. 2018

    Convoys rebuilt at river hubs

    On the Paraná–Paraguay waterway, convoys change shape on the way like trains in a rail yard. A study by the UN Economic Commission for Latin America and the Caribbean (ECLAC, or CEPAL in Spanish) of 2018 traffic describes a barge that is placed by a shuttle boat, taken by a mid-sized pusher to the main route, joined to a 36-barge convoy pushed by more than 6,000 hp, coupled downstream into a new convoy of 16, and shuttled again to the unloading dock, waiting at anchor at each node where convoys are reconfigured, "as a container does in a transshipment terminal." A convoy that leaves Ladário loaded with ore with 16 barges may drop four at Asunción and take on others. Pushers have grown more powerful, and older, weaker ones now work short shuttles or in hub anchorages "building and breaking convoys."

    LessonWhen convoys are rebuilt at hubs, the report says, time at anchor can in some cases be several times the time under way.

    argentina.gob.ar

    Credit

    ECLAC's International Trade and Integration Division, under Ricardo J. Sánchez, for Argentina's port authority (AGP), report of 7 June 2022

  5. 2023

    Brazil's 35-barge convoy

    In February 2023 Hidrovias do Brasil began running a convoy of 35 barges, 346 m long and 75 m wide, carrying up to 70,000 t of grain from Itaituba on the Tapajós River to Barcarena, ten barges more than its usual 25-barge convoys and 40 percent more capacity. The Brazilian Navy authorized it on conditions that include minimum depths along the Tapajós, which usually occur between January and August. The company says the larger convoy uses about 10 percent less fuel per ton.

    LessonThe larger convoy was authorized only for the months when the Tapajós is deep enough for it.

    forbes.com.brforbes.com.brmundologistica.com.br

    Credit

    Hidrovias do Brasil; Brazilian Navy

Watch for

  1. Tugs taught to push barges

    Junkai Lu, Guillaume Sartoretti and nine co-authors built a physics simulator, run on graphics processors, with buoyancy, waves and water resistance, and trained several tugboats in it to push a barge together by multi-agent reinforcement learning (trial-and-error training of several controllers at once). On straight runs, turns and stops they report more reliable and accurate maneuvering than a conventional PID controller and a single central controller, and say the controllers kept working in rougher seas they had not trained on. All results are in simulation.

    Achieved whenthe trained controllers push a real barge, at model or full scale, and someone outside the team reports or reproduces the results.

    arxiv.org

    Claimed by

    Junkai Lu, Guillaume Sartoretti and co-authors, September 2026

Open

  1. 01

    Couple barges from the boat

    A scale-model coupling between barges that a harbor-boat operator can make, tension and release without anyone stepping onto the barges: a self-guiding latch at each corner and a motor winch that takes up and holds a measured line tension, tested on model barges in a pool or test tank.

    The brief
    Credit · unclaimed
  2. 02

    Measure the effort of lashing

    An independent bench test of the force, time and body strain it takes to tighten three kinds of barge winch (a ratchet worked with a pipe extension, a single-stack drum winch of the YoYo type, and a handle-and-pedal winch of the FASST Winder type), with volunteers on a shore rig where a calibrated brake on the drum stands in for line tension, so that no wire is under load.

    The brief
    Credit · unclaimed

Open 01 · the brief

Couple barges from the boat

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A scale-model coupling between barges that a harbor-boat operator can make, tension and release without anyone stepping onto the barges: a self-guiding latch at each corner and a motor winch that takes up and holds a measured line tension, tested on model barges in a pool or test tank.

Why it is still open

Barges in a US tow are still joined by a deckhand who runs a winch line to a deck fitting on the next barge and "ratchets the line tight," as a 2016 Arcosa patent describes the work. Inventors have proposed doing it from the boat: James M. Lapeyre's 1988 patent describes an electromagnetic coupling, powered from the towboat, "to expedite barge handling while making up tows". Luis A. Mateos's 2020 ball-and-socket latch let small robotic boats meant for Amsterdam's canals latch onto, tow and guide unpowered floating platforms. Europe's ES-TRIN standard asks that couplings be "safe and easy to use, enabling craft to be coupled rapidly without endangering personnel". Searches found no barge-to-barge coupling in use or on trial that is made without a person on deck.

patents.google.compatents.google.comarxiv.orgcesni.eu

Built with what exists

model barges at about 1:25 scale, of plywood or 3D-printed hulls; funnel-and-ball latches after Mateos's design; stepper-motor winches with load cells read through HX711 boards; a Raspberry Pi; an overhead camera with OpenCV to measure gaps and drift; a pool or university towing tank; ES-TRIN's coupling-force formula, scaled by Froude's rule, under which forces fall with the cube of the scale.

  1. First step

    build two model barges and one latch and try 20 couplings in still water.

  2. Done looks like

    200 coupling attempts between two and four model barges, in still water and in current and waves made with a pump and paddle; the success rate, the median time to couple, the tension held against the scaled ES-TRIN force, and the gap that opens between barges in turning tests; all video, drawings and code published.

Open 02 · the brief

Measure the effort of lashing

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

An independent bench test of the force, time and body strain it takes to tighten three kinds of barge winch (a ratchet worked with a pipe extension, a single-stack drum winch of the YoYo type, and a handle-and-pedal winch of the FASST Winder type), with volunteers on a shore rig where a calibrated brake on the drum stands in for line tension, so that no wire is under load.

Why it is still open

The published figures are the makers'. Patterson said in 2010 that field tests showed its YoYo winch to be "75 percent more efficient than traditional ratchets for making up and breaking tow". NABRICO cited an unnamed "third-party report" saying its FASST Winder needs over 50 percent less force than its ratchet model, with four times less back stress. An Arcosa patent says operators using pipe extensions on ratchets often use improper motion and can be seriously injured. Searches found no measurement published by anyone outside the makers.

marinelink.commarinelink.compatents.google.com

Built with what exists

one winch of each kind, bought or borrowed; a steel frame; a disc or magnetic-particle brake on each drum with a torque sensor; a load cell in each handle; two phone cameras and OpenCap, Stanford's free tool for estimating joint loads from video; for volunteers who already know the motions, a deckhand school's practice deck such as the barge outline fitted with winches and bitts that Delgado Community College built in New Orleans in 2025.

waterwaysjournal.net

  1. First step

    mount one ratchet and one winch on a frame with a brake on each drum, and log handle force and time for one person.

  2. Done looks like

    20 volunteers each tightening each winch five times to the same drum torque; peak and average handle force, time to torque and estimated peak low-back load for each winch, published with the raw logs; each maker sent the results for reply before publication.