BRENNEN

Industries / Construction and property / Commercial and residential construction / Electrical contracting

Wiring and conduit

This work runs the cables, and the pipes called conduit that hold wires, from the panel to every light, outlet and machine in a building.

5

Milestones achieved, from 1882 to 1970s.

1

To watch for: announced, not yet confirmed outside.

2

Open deliverables. Nobody has shipped them.

The road

AchievedWatch forOpen

Achieved

  1. 1882

    Britain's first wiring rules

    On 11 May 1882 the Society of Telegraph Engineers and of Electricians published rules for installing electric lighting so that it would not start fires. The first edition had 19 rules, by the IET's count. The rules were revised edition after edition, became British Standard BS 7671 in 1992, and reached an 18th edition on 1 July 2018.

    theiet.org

    Credit

    a committee of the Society's Council, a forerunner of today's Institution of Engineering and Technology (IET)

  2. 1899

    Armored cable is listed

    Armored cable wraps insulated wires in a spiral steel sheath that guards them against nails and knocks. It was first listed, that is, approved by a testing laboratory, in 1899 for the Sprague Electric Company of New York as "Greenfield Flexible Steel-Armored Conductors", after its co-inventor Harry Greenfield. One of two experimental versions, "BX", gave the cable its trade nickname. It entered the National Electrical Code (NEC) in 1903 but became popular only around 1930, by the account of David Dini, an engineer at Underwriters Laboratories (UL).

    inspectapedia.com

    Credit

    Harry Greenfield; Sprague Electric

  3. 1926

    Sheathed cable enters the code

    Nonmetallic-sheathed cable, NM for short, bundles insulated wires inside one outer jacket, so an electrician pulls a single cable through the wooden frame of a house. It was invented a few years before 1926 at the Rome Wire works in Rome, New York, sold as Romex, and first described in the NEC in 1926. Its cotton-braid jacket gave way to plastic from the early 1960s, and after the 1962 code required equipment grounding on all branch circuits, cable with a ground wire became the norm, by Dini's account.

    inspectapedia.com

    Credit

    Rome Wire Company, later part of General Cable

  4. 1965

    Aluminum wire overheats

    A copper shortage in the mid-1960s led US builders to use aluminum wire for ordinary 15 and 20 ampere circuits. The US Consumer Product Safety Commission (CPSC) says homes built, extended or rewired from 1965 to the mid-1970s may have it. Its connections slowly gain resistance and overheat; on 28 April 1974 two people died in a fire in Hampton Bays, New York, that fire officials traced to an overheating aluminum connection at an outlet. A survey by the Franklin Research Institute for CPSC found that aluminum-wired homes built before 1972 were 55 times more likely than copper-wired homes to have at least one outlet connection reach "fire hazard conditions". CPSC recognizes two permanent repairs: copper pigtails joined with a COPALUM crimp connector, or the AlumiConn connector.

    LessonA cheaper conductor needs connectors designed and tested for it before it goes into millions of homes.

    cpsc.gov

    Credit

    CPSC; Franklin Research Institute

  5. 1970s

    Insulation buries old wiring

    Knob-and-tube wiring, the earliest house wiring, ran single wires on porcelain knobs and through porcelain tubes, spaced apart in open air, which kept them cool. It was phased out from the 1930s and has not been allowed by the NEC in new work since the mid-1970s. During the energy crisis of the 1970s, owners blew loose cellulose insulation into attics and walls, and glowing splices or overheated wires in these old systems could ignite it, by Dini's account.

    LessonWiring that was safe in open air became a fire risk once its surroundings changed.

    inspectapedia.com

    Credit

    reported by David A. Dini, UL

Watch for

  1. CNC bending cuts shop labor

    A CNC bender is a computer-controlled machine that bends conduit to programmed angles and lengths. EVOLVE MEP, which sells software that sends bend data from building models to Crippa CNC benders, says a study with Briggs Electric found one worker on the machine cut direct labor per large compound bend from 30 minutes, for a journeyman and an apprentice on a hydraulic bender, to 5 minutes, an 83% drop, with about 98% of bends right the first time. It adds that the bottleneck moves to quality checks and assembly.

    Achieved whenAn independent time study, or several contractors' published shop records, measure labor per bend and first-pass yield before and after.

    evolvemep.com

    Claimed by

    EVOLVE MEP with Briggs Electric, July 2026

Open

  1. 01

    Read cable markings by camera

    A phone app that reads the printed or embossed markings on old house cable and names what it is: copper, aluminum or copper-clad aluminum NM cable, cloth-jacketed NM, armored cable, or knob-and-tube. It is trained and tested only on salvaged, disconnected cable offcuts and on photos of exposed cable runs; nobody opens a box or touches a circuit.

    The brief
    Credit · unclaimed
  2. 02

    Check bent conduit by camera

    A camera station that measures a finished piece of bent conduit, its bend angles, offsets and the distances between bends, and compares them with the bend schedule, the list of bends the piece should have. It could check prefab-shop output and grade apprentices' practice bends. The pieces are empty pipe with no wires.

    The brief
    Credit · unclaimed

Open 01 · the brief

Read cable markings by camera

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A phone app that reads the printed or embossed markings on old house cable and names what it is: copper, aluminum or copper-clad aluminum NM cable, cloth-jacketed NM, armored cable, or knob-and-tube. It is trained and tested only on salvaged, disconnected cable offcuts and on photos of exposed cable runs; nobody opens a box or touches a circuit.

Why it is still open

CPSC says aluminum NM cable has "no readily discernable distinction" from copper cable, so owners must read the jacket markings, shining a flashlight at a low angle to make embossed letters readable. The marking "CU-clad" means a different metal that CPSC's repair advice does not cover, and if owners cannot tell, CPSC says an electrician must decide. Searches of GitHub and Hugging Face in this research found no labeled photo set of old wiring types.

cpsc.gov

Built with what exists

A phone camera and a clip-on LED for low-angle light; an open text-reading (OCR) model and an open vision-language model; salvaged cable from renovation tear-outs or scrap dealers.

  1. First step

    Collect 20 lengths of salvaged cable of known type, photograph each under three lighting angles, and count how often an off-the-shelf OCR model reads the markings correctly.

  2. Done looks like

    At least 1,500 labeled photos released under an open license; and on 200 photos from houses not used in training, the app names the conductor metal correctly at least 95% of the time and never calls aluminum "copper", with the full confusion table published.

Open 02 · the brief

Check bent conduit by camera

Credit · unclaimed

The first to publish is credited on this line, and the deliverable moves from Open to Achieved.

What to build

A camera station that measures a finished piece of bent conduit, its bend angles, offsets and the distances between bends, and compares them with the bend schedule, the list of bends the piece should have. It could check prefab-shop output and grade apprentices' practice bends. The pieces are empty pipe with no wires.

Why it is still open

EVOLVE MEP says that once CNC bending speeds up a shop, the bottleneck moves to quality checks. Polish researchers (Borkowski and colleagues, Sensors, September 2025) measured a bent industrial pipe from a single photo, getting the bend angle within about 0.1° of a laboratory coordinate-measuring machine, but their prototype handles one bend on a marking table, not conduit pieces with several bends such as offsets and saddles. The conduit-bending repositories this research found on GitHub are calculators and an augmented-reality teaching demo from Saskatchewan Polytechnic, not checkers.

pmc.ncbi.nlm.nih.govevolvemep.comgithub.com

Built with what exists

A phone or webcam over a table with a printed grid; OpenCV for edge detection and line fitting; EMT offcuts (thin-wall steel conduit) bent with an ordinary hand bender.

  1. First step

    Bend 20 pieces of 1/2-inch EMT into offsets, saddles and 90s, measure each by hand, and fit lines to one photo of each.

  2. Done looks like

    On 100 bent pieces, 90% of the station's readings fall within 1° and 3 mm of an instructor's protractor-and-tape readings, and its pass or fail call against the bend schedule matches the instructor's on at least 95 pieces.